300 Toni Stone Xing
San Francisco · Mission Bay · San Francisco · Coordinates: 37.77575, -122.38863
Executive Verdict · Public-Records Synthesis
Zoned MR-MU in San Francisco with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $1,218,000 ($1,035,000–$1,401,000).
Upsides & Opportunities
- ✓ Ministerial ADU / JADU pathway likely eligible
Zone MR-MU allows residential use qualifying for ministerial ADU review under state law.
Source: San Francisco zoning · CA Gov. Code 66314
- ✓ 14 documented municipal building permits on file
On-parcel permit history is indexed through Apr 25, 2024, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: San Francisco Department of Building Inspection, Building Permits (parcel APN)
- ✓ Above-average reinvestment in Mission Bay
164 substantial renovation & housing permits over 24 months (442.0 per 1,000 parcels vs. 91.4 citywide baseline) (#25 of 37 neighborhoods).
Source: San Francisco Department of Building Inspection, Building Permits (Mission Bay)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: 0.2% annual chance flood hazard (shaded X))
all of the lot of the parcel intersects Zone X: 0.2% annual chance flood hazard (shaded X). Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! Delayed or open permit activity on this parcel
New commercial building at 300 Toni Stone Cg: In "Approved" for 7.1 yr (since Oct 7, 2019), exceeding the 548d median and 1304d 90th percentile for new commercial / non-residential building permits in San Francisco (n=45). High-impact scale ($79,835,080 declared valuation across 2 permits).
Source: San Francisco Department of Building Inspection, Building Permits (review-time benchmark)
- ! 5 slow or stalled nearby projects within ½ mile
Closest lead: Mixed-use development at 655 04th St (0.39 mi W, applied). Inspect timeline history before assuming near-term completion.
Source: San Francisco Department of Building Inspection, Building Permits · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$14,822/yr at $1,218,000)
Sale triggers reassessment to 1.00% base + ~0.18% voter debt (~$1,235/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- —
- Assessor use:
- —
- Addresses on lot:
- 300 TONI STONE XING
Zoning & Land Use
MR-MU — MISSION ROCK MIXED USE (Mixed Use)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADULikely eligible
Zoned MR-MU (mixed use): state law allows ADUs where homes are allowed. On a multifamily lot the state allowance is different: ADUs in non-living space of the building, plus up to eight detached ADUs.
- SB 9: two homes on the lotUnlikely
Zoned MR-MU (mixed use), not a single-family residential zone.
- SB 9: split into two lotsUnlikely
Zoned MR-MU (mixed use), not a single-family residential zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: 0.2% annual chance flood hazard (shaded X) (all of the lot) · FIRM panel 0602980119A, effective March 23, 2021
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $1,035,000 – $1,401,000 · Status: Off market
HUD Metro FMR (San Francisco, CA HUD Metro FMR Area) · FY 2026
Studio $2,485 · 1BR $2,977 · 2BR $3,604 · 3BR $4,604 · 4BR $4,772
Nearby Activity (½ mile radius, since November 2024)
3 active or recent development projects (244 housing units across completed, permitted, and pipeline stages) and 442 total building permits recorded within ½ mile.
- New construction2 permits (398 units)
- Adds housing (ADU)1 permit (10 units)
- Additions & renovations159 permits
- Building systems196 permits
- Repairs5 permits
- Other79 permits
Developments Deserving Closer Investigation & Active Area Builders
- New commercial building at 300 Toni Stone Cg (Approved)On this parcel
In "Approved" for 7.1 yr (since Oct 7, 2019), exceeding the 548d median and 1304d 90th percentile for new commercial / non-residential building permits in San Francisco (n=45). High-impact scale ($79,835,080 declared valuation across 2 permits).
- Mixed-use development at 655 04th St (Applied)0.39 mi W
In "Applied" for 7.4 yr (since Jun 10, 2019), exceeding the 637d median and 1391d 90th percentile for new multifamily / condos / mixed-use permits in San Francisco (n=95). High-impact scale (501 housing units, $182,951,076 declared valuation across 3 permits).
- New commercial building at 1090 Dr Maya Angelou Ln (Approved)350 ft SW
In "Approved" for 7.1 yr (since Oct 28, 2019), exceeding the 548d median and 1304d 90th percentile for new commercial / non-residential building permits in San Francisco (n=45). High-impact scale ($78,083,460 declared valuation across 2 permits).
- New commercial building at 130 Townsend St (Applied)0.36 mi NW
In "Applied" for 5.8 yr (since Feb 4, 2021), exceeding the 548d median and 1304d 90th percentile for new commercial / non-residential building permits in San Francisco (n=45). High-impact scale ($23,030,000 declared valuation across 1 permit).
Permit & Project History on This Parcel (14 permits, 1 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| 202404180269 | Plan revision / deferred submittal | filed | App. Apr 25, 2024 | $1 | bulletin-6. addendum-3 rev5. rev to arch & mep (add# 3) for loading dock egress analysis. revised work includes relocati… |
| 202403188035 | Plan revision / deferred submittal | approved | App. Mar 18, 2024 | $1 | proj-24-0569; mou-port;rev to ti drawings for phone booth anchorage throughout building. no change in use or occupancy o… |
| 202403077282 | Plan revision / deferred submittal | approved | App. Mar 7, 2024 | $1 | proj-24-0568; mou-port: revision to ti drawing for room indentification numbering throughout building. no change in use … |
| 202403077281 | Plan revision / deferred submittal | approved | App. Mar 7, 2024 | $1 | proj-24-0567; mou-port: revision for revised acoustical panel details & to clarify allowable combustible materials for f… |
| 202401194265 | Remodel / interior alteration | filed | App. Jan 19, 2024 | $168,000 | proj-24-0564: visa phase 3 - deferred free standing demountable partitions aka dirtt (shop drawings). work on level 12. … |
| 202311201106 | Plan revision / deferred submittal | approved | App. Nov 20, 2023 | $10,000 | proj-23-0544: revision to include exterior lighting on terraces for phase 1 and phase 3 visa t.i. permits. reference the… |
| 202310128495 | Remodel / interior alteration | approved | App. Oct 12, 2023 | $1,100,000 | proj-23-0540: deferred free standing demountable partitions, aka dirtt (shop drawings). wokr on levels 6 through 11. ref… |
| 202309136499 | Commercial tenant improvement | approved | App. Sep 13, 2023 | $40,000 | proj-23-0539: visa ti phase 1 - deferred stair elements to furnish & install railings, guard rails & hangars. reference … |
| 202308295553 | Remodel / interior alteration | approved | App. Aug 29, 2023 | $210,000 | proj-23-0537 - port mou: deferred free standing demountable partitions, aka dirtt (shop drawings). work on level 2,3,4. … |
| 202306160296 | Plan revision / deferred submittal | approved | App. Jun 16, 2023 | $10,000 | proj-23-0531: tenant improvement revision to add a horizontal exit on level 5, revised demoition scope of existing build… |
| 202212128138 | Plumbing / water heater / sewer | approved | App. Dec 12, 2022 | $25,000,000 | proj-22-0518 mayor ed-17-02 mission rock bldg g: t.i. of 2 full floors (12,13) & rooftop elevator lobby in (e) 13 story … |
| 202211216982 | Plumbing / water heater / sewer | approved | App. Nov 21, 2022 | $31,000,000 | proj-22-0514 mayor ed 17-02: mission rock bldg g - ti of 6 full flrs (6-11) in an (e) 13 story bldg. scope includes new … |
| 202210275305 | Commercial tenant improvement | approved | App. Oct 27, 2022 | $22,000,000 | proj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structura… |
| 201910073785 | New commercial / non-residential building | approved | App. Oct 7, 2019 | $79,835,080 | for proj-19-0277; mayor dir# 17-02. mou proj port of sf. priority processing. (building g.) erect 13-stories, no basemen… |