Active in City of Sacramento (12 permits)
Raw permit filing name: AKAL BUILDTECH INC
3 issued · 1 parcels
vs 6 prior 24m
1 construction/remodel
Sum of permit job values
Application → issuance
Latest: Mar 12, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 9 | 0 | — | — | — | 41d (93d p75) | — | |
| 1 | 1 | — | $18,000,000 | — | 42d (83d p75) | — | |
| 1 | 1 | — | $120,000 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $230,000 | — | 14d (29d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2504973Portal ↗ | Applied Mar 12, 2025 | Complete | — | EXPEDITED - EPC - Rev to COM-2225812. Type IIIB; Occ B, F1, S-1. Client initiated changes to electrical work in the manufacturing and r&d areas. See sheet by sheet narrative of changes. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2502070Portal ↗ | Applied Jan 30, 2025 | Complete | — | EPC. Rev to COM-2225812. Revised exit sign, outlet locations; see sheet by sheet narrative for full changes. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2500453Portal ↗ | Applied Jan 8, 2025 | Complete | — | EPC. Revision to COM-2420982. Client initiated changes to provide additional temp power for the office and select lab areas. Additionally temp power will be provided for lighting. See application for full narrative. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2425286Portal ↗ | Applied Nov 18, 2024 | Complete | — | EXPEDITED - EPC. Rev to COM-2225812. Client initiated changes for interior office area electrical power and lighting. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2424172Portal ↗ | Applied Nov 1, 2024 | Complete | — | EPC. DEFERRED TO COM-2225812 OCC. B, S, F. Submittal of deferred stair drawings and calculations. Replacing COM-2403818. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Fire alarm / sprinkler COM-2420979Portal ↗ | Issued Oct 31, 2024 37d review | Finaled | $230,000 | EPC. 89,495 sqft. Type, IIIB. OCC: F-1, B, S-1. Install a fire alarm system consisting of a new fire alarm control panel with internal dialer an cellular communicator. Related but separate to COM-2225812, COM-2325448. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Electrical / panel COM-2420982Portal ↗ | Issued Oct 7, 2024 13d review | Finaled | $120,000 | EXPEDITED - EPC. Type IIIB; OCC B, S-1. APPLICATION FOR TEMPORARY POWER DUE TO DELAY IN PERMANENT POWER EQUIPMENT. Related to COM-2225812. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2420718Portal ↗ | Applied Sep 19, 2024 | Complete | — | EPC. Revision to COM-2225812. Type IIIB; OCC F-1; B, S-1. Client initiated changes related to civil, architectural, mechanical, and electrical disciplines to relocate exterior equipment at the rear of the building. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2415879Portal ↗ | Applied Jul 18, 2024 | Complete | — | EPC. Revision to COM-2225812. Type IIIB; OCC B, F-1, S-1. Client initiated changes for interior office area. Office area, doors, finishes, and lighting updated. Additional details provided to address field conditions. Showers omitted per client request. Includes architectural, mechanical, electrical and plumbing.See attached sheet by sheet narrative for full set of changes. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2410728Portal ↗ | Applied May 16, 2024 | Complete | — | EPC. Revision to COM-2225812.This revision includes the addition of details for pipe and duct penetration thru a rated wall and fire smoke damper. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Plan revision / deferred submittal COM-2403818Portal ↗ | Applied Feb 21, 2024 | Complete | — | Withdrawn. Please refer to COM-2424172 for stairs submittal. Filed as: AKAL BUILDTECH INC |
| 3900 Duckhorn Dr City of Sacramento · APN 225-0140-083-0000 | Addition (adds square footage) COM-2225812Portal ↗ | Issued Feb 12, 2024 434d review | Certificate of Occupancy | $18,000,000 | EXPEDITED - EPC - Construction of a 25,923SF second floor (occupancies B and S-1) addition that will be used for meeting rooms, storage and mechanical equipment rooms. The first floor/first-time tenant improvement totals 63,572SF (occupancies B, S and F) that will be used for a lobby area, offices, meeting rooms/lounge areas along with manufacturing and ancillary spaces. Deferred submittals are; Fire sprinklers, Fire alarm, Steel Stairs, non structural equipment anchorage and warehouse equipment racking. PHASED PERMIT for structural framing of 2nd flor and underground rough plumbing issued under COM-2302110. SECOND PHASED PERMIT under COM-2325448. For fee reference this is an addition and TI of the shell building constructed under COM-2116557, the footprint of the original shell building is not being expanded (63572sf). Fees calculated for the Shell building were as follows: PDIF calc'd @ warehouse, non distribution center rate .15/SF, PDCI @.04/SF, HTF calc'd at manufacturing/industrial rate of $1.77/SF. Filed as: AKAL BUILDTECH INC |