Active in City of Sacramento (8 permits)
Raw permit filing name: BARRIER SOLAR INC
5 issued · 4 parcels
vs 0 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Feb 20, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 5 | 4 | — | $148,250 | 42d (n=4) | 3d (8d p75) | Above 75th pct turnaround | |
| 2 | 1 | — | $400 | — | 0d (0d p75) | — | |
| 1 | 0 | — | — | — | 41d (93d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 7847 Rush River Dr 1 City of Sacramento · APN 031-0111-025-0000 | Solar / battery storage RES-2503485Portal ↗ | Applied Feb 20, 2025 | Void | $1,000 | 8.6kw Solar PV System, and nullgal Solar WH System (water heater installed null). Filed as: BARRIER SOLAR INC |
| 3151 Notre Dame Dr 149 City of Sacramento · APN 079-0182-002-0000 | Solar / battery storage COM-2427109Portal ↗ | Issued Jan 22, 2025 40d review | Finaled | $35,000 | EPC - 9.36kw Solar PV System, and 0gal Solar WH System (water heater installed null). Filed as: BARRIER SOLAR INC |
| 7301 29th St City of Sacramento · APN 049-0010-060-0000 | Plan revision / deferred submittal COM-2427700Portal ↗ | Applied Dec 23, 2024 | Complete | — | EPC - REVISION TO COM-2425984 ELECTRICAL CONNECTION CHANGED FROM LINE SIDE TAP TO CIRCUIT BREAKER ON PV-3 (PLAN SHEET PAGE NO:PV-3) Filed as: BARRIER SOLAR INC |
| 7301 29th St City of Sacramento · APN 049-0010-060-0000 | Solar / battery storage COM-2425984Portal ↗ | Issued Dec 18, 2024 22d review | Finaled | $45,000 | EPC - 12.87kw Solar PV System, and 0gal Solar WH System (water heater installed null). SEE REVISION COM-2427700 ELECTRICAL CONNECTION CHANGED FROM LINE SIDE TAP TO CIRCUIT BREAKER ON PV-3 (PLAN SHEET PAGE NO:PV-3) SEE REVISION COM-2505451: Structure Layout, changed from Ironridge AIRE Rail to Ironridge XR 100 Rail with attachments 2. Electrical Line Diagram, changed from PV Breaker to Line Side Tap SEE REVISION COM-2506534: Correction From Inspector: Electrical Connection Changed from Line Side Tap to Load Side Tap on PV-3 (Plan Sheet Page No: PV-3) SEE REVISION COM-2508284: Upgrade Cable Size Filed as: BARRIER SOLAR INC |
| 7847 Rush River Dr 1 City of Sacramento · APN 031-0111-025-0000 | Solar / battery storage COM-2423955Portal ↗ | Issued Dec 13, 2024 44d review | Finaled | $42,250 | EPC - 8.58kw Solar PV System, revision COM-2503782 Corrections from inspector. Trench detail and Site plan added to plans for underground electrical run. Filed as: BARRIER SOLAR INC |
| 1101 E St City of Sacramento · APN 002-0115-018-0000 | Electrical / panel RES-1916506Portal ↗ | Applied Aug 29, 2019 | Withdrawn | $200 | Permit to obtain final SMUD inspection off permit # Com-1901866 Filed as: BARRIER SOLAR INC |
| 1101 E St City of Sacramento · APN 002-0115-018-0000 | Electrical / panel COM-1916508Portal ↗ | Issued Aug 29, 2019 0d review | Finaled | $200 | Permit to obtain final SMUD Inspection from permit COM-1901866 Filed as: BARRIER SOLAR INC |
| 1101 E St City of Sacramento · APN 002-0115-018-0000 | Solar / battery storage COM-1901866Portal ↗ | Issued Apr 23, 2019 82d review | Finaled | $25,000 | Solar PV Roof Top System @ 8.125 KW with 25 modules; 1 Inverter ; PV Back feed to existing main panel. Filed as: BARRIER SOLAR INC |