Active in City of Sacramento (17 permits)
Raw permit filing name: BAY AREA ACTIVO INC
14 issued · 1 parcels
vs 1 prior 24m
14 construction/remodel
Sum of permit job values
Application → issuance
Latest: May 22, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 14 | 13 | — | $96,922 | 68d (n=13) | 4d (21d p75) | Above 75th pct turnaround | |
| 1 | 0 | — | $6,923 | — | 1d (3d p75) | — | |
| 1 | 1 | — | $6,700 | — | 14d (29d p75) | — | |
| 1 | 0 | — | $150,000 | — | 41d (93d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 401 Florin Rd City of Sacramento · APN 030-0730-005-0000 | General repair COM-2505434Portal ↗ | Issued May 22, 2025 65d review | Finaled | $6,700 | EPC - Structural repairs to exterior stair landing. During construction, one beam was found to have water damage. We are replacing the one beam in-kind. Work at BLDG 209 Units 162-164. Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425754Portal ↗ | Issued Jan 28, 2025 67d review | Finaled | $6,923 | Bldg. 405 unit 126 Deck repair In-kind Demo existing waterproofing membrane ??Detach staircase from landing Remove existing handrail and save for re-installation • ??Remove and replace existing 2X12 fascia • ?Remove and replace existing ballasts • ??Provide and install new sheathing on deck • ??Provide and install new bonderized drip • ??Waterproof landing with Westcoat ALX Pro system per manufactures specifications • ??Provide and install new ballasts • ??Repair siding, as needed • ??Clean a up and haul off Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425753Portal ↗ | Issued Jan 28, 2025 67d review | Finaled | $6,923 | Scope of work: Building 213 stair landing in-kind repairs Demo existing waterproofing membrane ??Detach staircase from landing ??Remove existing handrail and save for re-installation ??Remove and replace existing 2X12 fascia which is structurally compromised ?Remove and replace existing 6X12 edge beam which is structurally compromised ??Provide and install new sheathing on landing ??Re-install existing handrail ??Waterproof landing with Westcoat ALX Pro system per manufactures specifications ??Paint existing handrail ??Repair siding, as needed ??Reinstall existing stairs ??Clean a up and haul off debris UPDATED SCOPE OF WORK: Building 213 Bldg. 213 unit 150-160 (stair landing) Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425707Portal ↗ | Issued Jan 28, 2025 68d review | Finaled | $6,923 | Building 385: All repairs will be in-kind repairs Bldg. 385- 8-10 (stairs landing repairs) Bldg. 385- 8-10 (stairs landing repairs) Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris UPDATED SCOPE OF WORK : Building 385 Bldg. 385- 8-10 Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425703Portal ↗ | Issued Jan 28, 2025 68d review | Withdrawn | $6,923 | Building 285: Bldg. 285 unit 10 (deck repairs) All repairs will be in-kind repairs Deck repairs: Scope of work for deck repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off debris UPDATED SCOPE OF WORK: Building 285: Bldg. 285 unit 10 (Railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed -Prime and paint Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425701Portal ↗ | Issued Jan 28, 2025 68d review | Finaled | $6,923 | Building 217: Bldg. 217- (142-144) (stairs landing repairs) Bldg. 217- (142-144) (stairs landing repairs) Bldg. 217- (146-148) (stairs landing repairs) All repairs will be in-kind repairs Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Bldg. 217 unit 146 (deck repairs) All repairs will be in-kind repairs Scope of work for deck repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off debris UPDATED SCOPE OF WORK : Building 217: Bldg. 217- 142-144 Bldg. 217- 146-148 Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Bldg. 217 Unit 146 (railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed -Prime and paint Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425700Portal ↗ | Issued Jan 28, 2025 68d review | Finaled | $6,923 | Building 401: All repairs will be in-kind repairs Bldg. 401- 106-120 (stairs landing repairs) Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris UPDATED SCOPE OF WORK : Building 401 Bldg. 401- 106-120(stair landing) Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425697Portal ↗ | Issued Jan 28, 2025 68d review | Finaled | $6,923 | Building 397: All repairs will be in-kind repairs Bldg. 397- 102-104(stairs landing repairs) Bldg. 397-102-104 (stairs landing repairs) Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Deck repairs Bldg. 397 unit 94- (deck repairs) Bldg. 397 unit 104- (deck repairs) All repairs will be in-kind repairs Scope of work for deck repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off debris Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425695Portal ↗ | Issued Jan 28, 2025 68d review | Finaled | $6,923 | Building 205: Bldg. 205- 184-186 (stair landing repairs) Bldg. 205- 184-186 (stairs landing repairs) Bldg. 205- 178-188 (stairs landing repairs) All repairs will be in-kind repairs Scope of work: Stair landing repair - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Bldg. 205 unit 188 (deck repairs) All repairs will be in-kind repairs Scope of work for Deck repairs: Bldg. 205 unit 188 (deck repairs) - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off UPDATED SCOPE: Building 205 Bldg. 205- 184-186 Bldg. 205- 178-188 Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Bldg. 205 unit 192(railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed -Prime and paint Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425694Portal ↗ | Issued Jan 28, 2025 68d review | Finaled | $6,923 | Building 201: All repairs will be In-kind repairs Scope of work for deck repairs: Bldg.201 unit-192 (deck repairs) - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications UPDATED SCOPE: Building 201 Bldg. 201 unit 192 (railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed -Prime and paint Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425689Portal ↗ | Issued Jan 28, 2025 68d review | Finaled | $6,923 | Building 209: Bldg. 209-162-164 (stairs landing repairs) Bldg. 209- 162-164 (stairs landing repairs) Bldg. 209-166-168 (stairs landing repairs) All repairs will be in-kind repairs Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Bldg. 209 unit 164 Deck repairs: All repairs will be in-kind repairs Scope of work for deck repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off debris UPDATED SCOPE OF WORK : Bldg. 209- 162-164 Bldg. 209- 166-168 Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Bldg. 209 unit 164 (railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed -Prime and paint Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425711Portal ↗ | Issued Jan 10, 2025 50d review | Finaled | $6,923 | Building 417: All repairs will be in-kind repairs Bldg. 417- (42-44) (stairs landing repairs) Bldg. 417-(42-44) (stairs landing repairs) Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Deck repairs: Bldg. 417 unit 42- (deck repairs) Bldg. 417 unit 52- (deck repairs) Bldg. 417 unit 44- (deck repairs) All repairs will be in-kind repairs Scope of work for deck repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off debris UPDATED SCOPE OF WORK : Building 417 Bldg. 417 unit 42-44 (stair landing) Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Bldg. 417 unit 42 (Railing repairs) Bldg. 417 unit 44 (Railing repairs) Bldg. 417 unit 52 (Railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425705Portal ↗ | Issued Jan 10, 2025 50d review | Finaled | $6,923 | Building 413: All repairs will be in-kind repairs Bldg. 413- 74- (stairs landing repairs) Bldg. 413-74-88 (stairs landing repairs) Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris UPDATED SCOPE OF WORK : Building 413 Bldg. 413- 74-88 (stair landing) Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Bldg. 413 unit 74 (Railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425692Portal ↗ | Issued Jan 10, 2025 50d review | Finaled | $6,923 | Building: 393: All repairs will be in-kind repairs Bldg. 393- 70-72 (stairs landing repairs) Bldg. 393- 66-68(stairs landing repairs) Bldg. 393- 58-60 (stairs landing repairs) Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Deck repairs: Bldg. 393 unit 64-(deck repairs) All repairs will be in-kind repairs Scope of work for deck repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off debris UPDATED SCOPE OF WORK: Building 393: Bldg. 393- 70-72 Bldg. 393-66-68 Bldg. 393-58-60 Scope of work: Stair landing repairs All repairs will be in-kind -Detach Staircase from landing -Remove existing handrail and save for re-installation -Remove and replace existing 2X12 fascia -Reinstall existing handrail -Repair siding as needed -reinstall existing stairs Bldg. 393 Unit 64 (railing repairs) Scope of work: Railing repairs All repairs will be in-kind -Remove and replace dry rotted ballast (pickets) -Repair fascia, as needed -Prime and paint Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Remodel / interior alteration COM-2425708Portal ↗ | Applied Nov 21, 2024 | Void | $6,923 | Building 385: All repairs will be in-kind repairs Bldg. 385- 8-10 (stairs landing repairs) Bldg. 385- 8-10 (stairs landing repairs) Bldg. 385-16-18 (stairs landing repairs) Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Filed as: BAY AREA ACTIVO INC |
| 407 Florin Rd City of Sacramento · APN 030-0730-005-0000 | Windows / doors / siding COM-2423777Portal ↗ | Applied Oct 29, 2024 | Expired Application | $6,923 | Building 209: Bldg. 209-166-168 (stairs landing repairs) All repairs will be in-kind repairs Scope of work for stairs landing repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing 6X12 edge beam which is structurally compromised - Provide and install new sheathing on landing - Re-install existing handrail - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Paint existing handrail - Repair siding, as needed - Reinstall existing stairs - Clean a up and haul off debris Bldg. 209 unit 164 Deck repairs: All repairs will be in-kind repairs Scope of work for deck repairs: - Demo existing waterproofing membrane - Detach staircase from landing - Remove existing handrail and save for re-installation - Remove and replace existing 2X12 fascia which is structurally compromised -Remove and replace existing ballasts (pickets) - Provide and install new sheathing on deck - Provide and install new bonderized drip - Waterproof landing with Westcoat ALX Pro system per manufactures specifications - Provide and install new ballasts (pickets) - Repair siding, as needed - Clean a up and haul off debris Filed as: BAY AREA ACTIVO INC |
| Unmatched parcel City of Sacramento | Plan revision / deferred submittal MP-2418322Portal ↗ | Applied Aug 16, 2024 | Complete | $150,000 | Master plan for the structural repairs (fascia replacement) of wood-framed stair landings. Portion of stair landings to be repaired now and the rest to be repaired in phases as needed. No change to square footage. Filed as: BAY AREA ACTIVO INC |