Active in Unincorporated Marin (6 permits) · City of Sacramento (4 permits)
Raw permit filing name: CUPERTINO ELECTRIC INC
8 issued · 6 parcels
vs 1 prior 24m
3 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 19, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in Unincorporated Marin (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 5 | 5 | — | $1,142,652 | 43d (n=5) | 0d (0d p75) | Above 75th pct turnaround | |
| 2 | 2 | — | $1,388,880 | 107d (n=2) | 83d (148d p75) | — | |
| 2 | 0 | — | — | — | — | — | |
| 1 | 1 | — | $120,000 | — | 160d (249d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 5555 Florin Perkins Rd City of Sacramento · APN 061-0180-030-0000 | Remodel / interior alteration COM-2315131Portal ↗ | Issued Oct 19, 2023 91d review | Finaled | $516,225 | EXPEDITED - EPC - INSTALL ELECTRIC VEHICLE INFRASTRUCTURE TO SUPPORT 110 CHARGE PORTS ASSIGNED FOR FLEET CHARGING ONLY. A TOTAL OF (42) 19.2KW AC LEVEL 2 PORTS, (4) 22.5KW DC WALLBOX PORTS, (6) 92KW DCFC PORTS AND ASSOCIATED ELECTRICAL EQUIPMENT WILL BE INSTALLED. ADDITIONALLY, CONDUITS AND FOUNDATIONS WILL BE INSTALLED FOR FUTURE INSTALLATION OF (42) 19.2KW AC WALLBOX LEVEL 2 PORTS, (16) 22.5KW DC WALLBOX PORTS, AND ASSOCIATED ELECTRICAL EQUIPMENT. ELECTRIC VEHICLE CHARGING STATIONS SHALL NOT BE AVAILABLE TO THE GENERAL PUBLIC AND ARE INTENDED FOR USE BY A DESIGNATED VEHICLE. PURSUANT TO CALIFORNIA BUILDING CODE SECTION 11B-228.3.2. THEREFORE, NO ACCESSIBLE EVSE PARKING STALLS WILL BE INSTALLED. revision COM-2406946 Updated connections to Nexus Equipment (Powerflex Load Management Equipment). Additionally, other programmatic changes have been added including added bollards for chargers in specific parking areas, mount type for panelboards, additional access points and tap box for future generation tie-in. Filed as: CUPERTINO ELECTRIC INC |
| 5555 Florin Perkins Rd City of Sacramento · APN 061-0180-030-0000 | Plan revision / deferred submittal COM-2124185Portal ↗ | Applied Nov 12, 2021 | Complete | — | EPC - REVISION TO COM-2108800: Relocate generator pad (second revision). Filed as: CUPERTINO ELECTRIC INC |
| 5555 Florin Perkins Rd City of Sacramento · APN 061-0180-030-0000 | Plan revision / deferred submittal COM-2119190Portal ↗ | Applied Sep 2, 2021 | Complete | — | EPC - REVISION TO COM-2108800: Delta E - Standby Equipment Relocation. Modify Existing Electrical Service Connections Filed as: CUPERTINO ELECTRIC INC |
| 5555 Florin Perkins Rd City of Sacramento · APN 061-0180-030-0000 | Remodel / interior alteration COM-2108800Portal ↗ | Issued Aug 27, 2021 123d review | Finaled | $872,655 | EXPEDITED (15-10-10) - EPC - MODIFY EXISTING ELECTRICAL SERVICE EQUIPMENT CONNECTIONS AND INSTALL NEW EQUIPMENT TO ALLOW FULL SITE BACK-UP FROM BOTH ON-SITE AND PORTABLE GENERATION EQUIPMENT DURING A UTILITY OUTAGE. REMOVE EXISTING SERVICE SWITCHBOARD, AUTOMATIC TRANSFER SWITCH, GENERATOR TAP BOX, AND GENERATOR. INSTALL 2 NEW 350 NATURAL GAS GENERATORS AND SWITCHBOARD. SEE REVISION COM-2119190: Delta E - Standby Equipment Relocation. Modify Existing Electrical Service Connections SEE REVISION COM-2124185: Relocate generator pad (second revision). Filed as: CUPERTINO ELECTRIC INC |
| 101 Donahue St Unincorporated Marin · APN 052-510-12 | Electrical / panel B24432Portal ↗ | Issued Dec 16, 2020 0d review | Issued | $76,652 | WORKING WITH PG&E ON THE PUBLIC SAFETY POWER SHUTDOWNS. WE ARE INSTALLING AN AUTOMATIC TRANSFER SWITCH TO PROVIDE POWER TO A TEMPORARY PORTABLE GENERATOR. — New Circuits / Outlets Filed as: CUPERTINO ELECTRIC INC |
| 1600 Los Gamos Dr Unincorporated Marin · APN 165-220-11 | Electrical / panel 163323Portal ↗ | Issued Nov 25, 2019 112d review | Issued | $180,000 | Install 22 E V Chargers W/11 Dual Port Chargers; 600 A Main And T.D. Filed as: CUPERTINO ELECTRIC INC |
| 50 Barbaree Way Unincorporated Marin · APN 055-061-28 | Electrical / panel 160139Portal ↗ | Issued Nov 15, 2018 24d review | Issued | $261,000 | Installing 14 Ev Chrging Stations T.D. 11/14/18 Filed as: CUPERTINO ELECTRIC INC |
| 950 Vision Rd Unincorporated Marin · APN 112-360-11 | Addition (adds square footage) 159012Portal ↗ | Issued Jul 11, 2018 202d review | Issued | $120,000 | Add Master Suite To 2nd Unit; Railings Upgr To Code T.D. 1/24/18 Filed as: CUPERTINO ELECTRIC INC |
| 3501 Civic Center Dr Unincorporated Marin · APN 179-270-11 | Electrical / panel 159011Portal ↗ | Issued Jul 11, 2018 43d review | Issued | $482,955 | 17 E V Charger Stations @ The Pit T.D. 6/25/18 Filed as: CUPERTINO ELECTRIC INC |
| 6 Peter Behr Dr Unincorporated Marin · APN 179-270-11 | Electrical / panel 159010Portal ↗ | Issued Jul 11, 2018 43d review | Issued | $142,045 | 17 E V Charger Stations @ Far West Pkg Area T.D. 6/25/18 Filed as: CUPERTINO ELECTRIC INC |