Sacramento 95826 · New Brighton · APN 061-0180-030-0000 · City of Sacramento
Zoned M-2S in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $555,000 ($488,000–$622,000).
Public building records show issued construction/renovation work on this parcel (33 total permits, latest Feb 12, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
4 substantial renovation & housing permits over 24 months (37.7 per 1,000 parcels vs. 30.4 citywide baseline) (#100 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (New Brighton)
all of the lot of the parcel intersects Zone X: 0.2% annual chance flood hazard (shaded X). Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$555,000
Benchmark range: $488,000 – $622,000
Other (COM-2602853): Pending in review for 9 mo (8.3× the 33d median) — slower than 90% of other permits in City of Sacramento (median 33d, 90th pct 196d, n=837).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Closest lead: P&H Group Truck Yard (0.33 mi NW, in review). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$565/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 2 commercial or mixed-use projects.
3 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
75 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of M-2 as industrial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "In review" for 17 mo (since Jun 2, 2025), with no new permit record in 17 mo. · $2,390,694 declared valuation
Nearby other (8625 Unsworth Ave): First appeared in published agency feed
Record COM-2621929 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (5470 Florin Perkins Rd 100): First appeared in published agency feed
Record COM-2623694 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (8250 Ferguson Ave): First appeared in published agency feed
Record COM-2621843 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (5711 Florin Perkins Rd): Status changed from Issued to Expired Permit
Record COM-2608067 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (5801 Florin Perkins Rd): First appeared in published agency feed
Record COM-2621900 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Record COM-2511336 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Latest published Zillow Home Value Index (ZHVI) update
Changed from $465,625 in September 2025 to $462,374 in September 2026.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95826 (not a parcel appraisal)
5739 Florin Perkins Rd · $400,000 valuation
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Other permit application filed (COM-2602853)
PG&E Spoils Yard Expansion
EPC - The project will consist of grading and drainage including on-site storm drain and new planting strip. The site will be used exclusively for the storage of non-hazardous materials. · Declared valuation: $2,640,000
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
Annual ZIP 95826 home-value index checkpoint
Changed from $480,304 in September 2024 to $465,625 in September 2025.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95826 (not a parcel appraisal)
New commercial / non-residential building permit issued (COM-2513873)
Utility Garage #1 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873 · Declared valuation: $68,750 · Contractor: Seegert Construction Inc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
New commercial / non-residential building permit issued (COM-2513878)
Utility Garage #2 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873 · Declared valuation: $68,750 · Contractor: Seegert Construction Inc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
New commercial / non-residential building permit issued (COM-2513880)
Utility Garage #3 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873 · Declared valuation: $68,750 · Contractor: Seegert Construction Inc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
New commercial / non-residential building permit issued (COM-2513884)
Utility Garage #4 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873 · Declared valuation: $68,750 · Contractor: Seegert Construction Inc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
New commercial / non-residential building permit application filed (COM-2513873)
Utility Garage #1 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873 · Declared valuation: $68,750 · Contractor: Seegert Construction Inc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "In review" for 17 mo (since Jun 2, 2025), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($2,390,694 declared valuation across 2 permits). current_status changed to "Verify" in snapshot Nov 1, 2026.
Pending in review for 9 mo (8.3× the 33d median) — slower than 90% of other permits in City of Sacramento (median 33d, 90th pct 196d, n=837).
Issued after 8 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Issued after 3 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Issued after 4 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Issued after 3 mo — slower than 90% of demolition permits in City of Sacramento (median 1d, 90th pct 35d, n=705).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 106 parcels
Small prior baseline
City baseline: 30.4 / 1k
4 in trailing 24m
Includes 0 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Seegert Construction Merged: SEEGERT CONSTRUCTION · SEEGERT CONSTRUCTION INC | Plan revision / deferred submittal | 8 on parcel8 in ½ mi | $885,000 | 4 vs 0 prior |
| Gowan Construction | Commercial tenant improvement | 4 on parcel4 in ½ mi | $2,161,884 | 0 vs 0 prior |
| Cupertino Electric | Plan revision / deferred submittal | 4 on parcel4 in ½ mi |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| New commercial / non-residential building |
HUD Small Area Fair Market Rent · ZIP 95826
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($5,550/yr) + local voter-approved bond debt ($777/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$22,232/yr
Cash needed: $122,100
NOI: $11,444/yr
P&I: $2,806/mo
For $0/mo net cash flow
At $2,175/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $2,001/mo | −$2,103/mo | -20.7% | $4,936/mo | −$2,075/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,175/mo | −$1,853/mo | -18.2% | $4,569/mo | −$1,702/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,306/mo | −$1,709/mo | -16.8% | $4,463/mo | −$1,418/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Finaled / completedJul 2, 2025 – Aug 27, 2025
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
PG&E Spoils Yard Expansion
EPC - The project will consist of grading and drainage including on-site storm drain and new planting strip. The site will be used exclusively for the storage of non-hazardous materials.
Utility Garage #4 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873
Utility Garage #3 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873
Utility Garage #2 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873
Utility Garage #1 of 4
EPC - SHARED PLANS x4 - Installation of (4) four 1020-sqft pre-fab metal utility garages - no utilities Shared plans reviewed under COM-2513873
5555 FLORIN PERKINS RD - STORM DRAINAGE
EPC - INSTALL STORM DRAIN CATCH BASINS AT THE LOW POINTS ALONG THE NORTHERLY PROPERTY LINE OF THE PG&E PROPERTY AND TIE INTO THE EXISTING CITY STORM DRAIN SYSTEM. [2:01 PM] Adrienne Spease No, I don't need to see it. Do not route to Planning for plan check. No file, no review is the general rule. Mia chose in error so please do not route.
electrical
EPC - Install new 37.5 KVA Transformer to feed new 120/240v single phase 125-amp 3R Panel 'Trailer'. Install 1 1/4" EMT runs from new Panel 'Trailer' along inside of fence line to junction boxes to provide 2-50 amp single phase 120/240 weather tight receptacle outlets and 4-20-amp 120v GFCI weather tight receptacle outlets to power 2 PG&E QO Group equipment training trailers on wheels. Note: Trailers are used to teach Plastic Gas pipe fusion classes. They are on site for approximately 3 months per year training PG&E employees and contractors, then they move to different PG&E sites.
REVISION
EPC - REVISION TO COM-2315131 Updated connections to Nexus Equipment (Powerflex Load Management Equipment). Additionally, other programmatic changes have been added including added bollards for chargers in specific parking areas, mount type for panelboards, additional access points and tap box for future generation tie-in.
EV CHARGERS
EXPEDITED - EPC - INSTALL ELECTRIC VEHICLE INFRASTRUCTURE TO SUPPORT 110 CHARGE PORTS ASSIGNED FOR FLEET CHARGING ONLY. A TOTAL OF (42) 19.2KW AC LEVEL 2 PORTS, (4) 22.5KW DC WALLBOX PORTS, (6) 92KW DCFC PORTS AND ASSOCIATED ELECTRICAL EQUIPMENT WILL BE INSTALLED. ADDITIONALLY, CONDUITS AND FOUNDATIONS WILL BE INSTALLED FOR FUTURE INSTALLATION OF (42) 19.2KW AC WALLBOX LEVEL 2 PORTS, (16) 22.5KW DC WALLBOX PORTS, AND ASSOCIATED ELECTRICAL EQUIPMENT. ELECTRIC VEHICLE CHARGING STATIONS SHALL NOT BE AVAILABLE TO THE GENERAL PUBLIC AND ARE INTENDED FOR USE BY A DESIGNATED VEHICLE. PURSUANT TO CALIFORNIA BUILDING CODE SECTION 11B-228.3.2. THEREFORE, NO ACCESSIBLE EVSE PARKING STALLS WILL BE INSTALLED. revision COM-2406946 Updated connections to Nexus Equipment (Powerflex Load Management Equipment). Additionally, other programmatic changes have been added including added bollards for chargers in specific parking areas, mount type for panelboards, additional access points and tap box for future generation tie-in.
REVISION TO COM-2108800
EPC - REVISION TO COM-2108800: Relocate generator pad (second revision).
REVISION TO COM-2108800
EPC - REVISION TO COM-2108800: Delta E - Standby Equipment Relocation. Modify Existing Electrical Service Connections
PG&E Station: Elect. Service Modification/ Generator Installations (15-10-10)
EXPEDITED (15-10-10) - EPC - MODIFY EXISTING ELECTRICAL SERVICE EQUIPMENT CONNECTIONS AND INSTALL NEW EQUIPMENT TO ALLOW FULL SITE BACK-UP FROM BOTH ON-SITE AND PORTABLE GENERATION EQUIPMENT DURING A UTILITY OUTAGE. REMOVE EXISTING SERVICE SWITCHBOARD, AUTOMATIC TRANSFER SWITCH, GENERATOR TAP BOX, AND GENERATOR. INSTALL 2 NEW 350 NATURAL GAS GENERATORS AND SWITCHBOARD. SEE REVISION COM-2119190: Delta E - Standby Equipment Relocation. Modify Existing Electrical Service Connections SEE REVISION COM-2124185: Relocate generator pad (second revision).
C/O HVAC Package System (BLDG B)
BLDG B - Replacement of HVAC package system #AC4 marked on reference plan. HERS report required at final inspection.
EPC - REVISION TO COM-2010792 (BLDG 2):(Main Revision Review -COM2010789
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
15.86 acres
Assessor's classification for assessment purposes. This is not zoning.
5555 FLORIN PERKINS RD; 5555 FLORIN PERKINS RD # A # A; 5555 FLORIN PERKINS RD # B # B
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 061-0180-030-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| $1,388,880 |
| 0 vs 0 prior |
| Roebbelen Contracting | Demolition | 3 on parcel3 in ½ mi | $1,915,000 | 8 vs 10 prior−20% |
| Cosco Fire Protection | Fire alarm / sprinkler | 3 on parcel3 in ½ mi | $181,000 | 0 vs 0 prior |
| Integrated Comfort Solutions | HVAC / heat pump | 1 on parcel2 in ½ mi | $80,260 | 0 vs 0 prior |
| Gcj | Remodel / interior alteration | 1 on parcel1 in ½ mi | $150,000 | 0 vs 0 prior |
| Greg Cox Electrical Enterprises | Electrical / panel | 1 on parcel1 in ½ mi | $20,000 | 0 vs 0 prior |
| Buzz Oates Construction Recent nearby: 8670 Fruitridge Rd 200 (Apr 26, 2018) | Commercial tenant improvement | 10 in ½ mi | $23,423,636 | 9 vs 5 prior |
| Mark Iii Construction Recent nearby: 5000 Warehouse Way (Jun 15, 2021) | Remodel / interior alteration | 8 in ½ mi | $769,426 | 2 vs 4 prior |
| 150 |
| 155d |
| 241d |
| 334d |
| 498d |
| 229d(vs 293d prior) |
| Accessory dwelling unit (new or conversion) | 1,693 | 57d | 97d | 172d | 284d | 97d(vs 103d prior) |
| DemolitionOn this parcel | 705 | 0d | 1d | 7d | 35d | 2d |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EPC - REVISION TO COM-2010792 (BLDG 2) AND COM-2010789 **MAIN REVISION REVIEW UNDER -COM-2010789) Elect. connection, conduit and transformer added to power the buildings; new trench path with trench detail
REVISION TO COM-2010789 (BLDG 1) + COM-2010792 (BLDG 2)
EPC - Shared Plans with COM-2108315. REVISION TO COM-2010789 (BLDG 1) + COM-2010792 (BLDG 2): Elect. connection, conduit and transformer added to power the buildings; new trench path with trench detail
PG&E Fences - Click to Enter
EPC - Installation of "Click to Enter" fire protection equipment
CONCRETE PAD AND ANCHORAGE
EPC - Installation of new concrete housekeeping pad and seismic anchorage of EXISTING storage racks.
REVISION TO COM-2010789/COM-2010792 (SHARED PLANS)
EPC - REVISION TO COM-2010789 /COM-2010792 (SHARED PLANS):Revision to slabs from double mat rebar to single mat rebar, includes building slab and apron slab;Revision to exclude grout pockets at slab for smooth slab finish. note added regarding keyways and option to remove them if surface is roughened; Affects only S100 (keynote 1) and S300 (various slab callouts). Does not affect building structural our foundation structural design or calcs.
Commercial New Building Bldg #2 - SHARED PLANS
EPC - New Pre-Engineered 3584 SQ FT "Open" Structure used for storing/covering soil and rock materials. Building #2. Shared Plans with COM-2010789, Review to Occur under COM-2010789 *******REVISION TO COM-2010789 /COM-2010792 (SHARED PLANS) Revision to slabs from double mat rebar to single mat rebar, includes building slab and apron slab;Revision to exclude grout pockets at slab for smooth slab finish. note added regarding keyways and option to remove them if surface is roughened; Affects only S100 (keynote 1) and S300 (various slab callouts). Does not affect building structural our foundation structural design or calcs.*****EPC - REVISION TO COM-2010792 (BLDG 2) AND COM-2010789 **MAIN REVISION REVIEW UNDER -COM-2010789) Elect. connection, conduit and transformer added to power the buildings; new trench path with trench detail*****
Commercial New Building Bldg #1 - SHARED PLANS
EPC - New Pre-Engineered 3584 SQ FT "Open" Structure used for storing/covering soil and rock materials. Building #1. Shared Plans with COM-2010792 , Review to Occur under COM-2010789 *******REVISION TO COM-2010789 /COM-2010792 (SHARED PLANS) Revision to slabs from double mat rebar to single mat rebar, includes building slab and apron slab;Revision to exclude grout pockets at slab for smooth slab finish. note added regarding keyways and option to remove them if surface is roughened; Affects only S100 (keynote 1) and S300 (various slab callouts). Does not affect building structural our foundation structural design or calcs.*******EPC - REVISION TO COM-2010789 (BLDG 1) + COM-2010792 (BLDG 2): Elect. connection, conduit and transformer added to power the buildings; new trench path with trench detail*******
ELECTRIC VEHICLE CHARGERS (8)
EPC - Installation of (8) Level 2 Charging Ports, (1) Van and (1) standard EV ADA Stalls.
PG&E Fences
EPC - Demolish approximately 3,084 linear feet of existing 6 foot tall perimeter chain link fence with barbed wire around the whole property and replace in same location with approximately 4,111 linear feet of proposed 10 foot tall wrought iron fence and approximately 577 linear feet of proposed chain link fence to match existing adjacent standard. Remove 6 foot tall double swing automatic chain link gates, 3 single sliding automatic chain link gate, 1 bi-parting sliding automatic chain link gate, as well as 4 foot tall wrought iron gate of 1 automatic sliding. Replace with 10 foot tall wrought iron gates of 4 automatic sliding, 1 automatic bi-parting, and 2 manual swing man gate. Grading and drainage alteration to existing condition is not required.
Revision to COM-1806261
EXPEDITED - Quantity of NAC devices, location of NAC device, addition of power supply, change location of ignition devices, new voltage calcs, new voltage drop calcs
PG&E Service Center Refresh Program
EPC Submittal - Remodel of Commercial Building - Work includes floor finishes, paint, ACT ceilings, new lighting. Existing HVAC to remain and be rebalanced. HVAC diffusers to be relocated per new ACT ceilings. All restrooms and showers upgraded to ADA standards. New drinking fountain. Path of travel at front and rear of building are currently fully accessible per prior permits.
EPC Submittal - Remodel of Commercial Building - Work includes floor finishes, paint, ACT ceilings, new lighting. Existing HVAC to remain and be rebalanced. HVAC diffusers to be relocated per new ACT ceilings. All restrooms and showers upgraded to ADA standards. New drinking fountain. Path of travel at front and rear of building are currently fully accessible per prior permits.
Equipment Change-Out w/ minor ADA ramp improvement
Replacement of Mech. & Electrical equipment. Removal & Replacement of boilers (2), chillers (2), back-up generator accessible access improvements to rear building access ramp and parking area.
Costco - Bldg D
EPC Submittal - Remodel of Commercial Building - Cosco Fire Protection is to remove existing fire alarm control panel and install and program new fire alarm system in Building D.
FIRE EQUIPMENT
EPC Submittal - FIRE EQUIPMENT (COM-1801533 Currently under review for remodel of building) Remodel of Commercial Building - Cosco Fire Protection is to remove existing fire alarm control panel and install and program new fire alarm system. Revision COM-1906387
EPC Submittal - Remodel of Commercial Building - Cosco Fire Protection is to remove existing fire alarm control panel and install and program new fire alarm system in Building D.
EPC Submittal - Remodel of Commercial Building - Cosco Fire Protection is to remove existing fire alarm control panel and install and program new fire alarm system.
PG&E trench
Digging a 1100 lf trench for electrical and gas , project includes installation of (3) 2" sleeves for future gas lines and (3) 2" conduit for future electrical
EV Charging Stations
Install 8 Electric Vehicle Charging Stations.
PG&E Non-Structural Interior Lobby Remodel
PG&E Non-Structural Interior Lobby Remodel to include R/R of teller line and addition of an Accessible station and addition of one electrical circuit.