Active in City of Sacramento (3 permits)
Raw permit filing name: ELITE FINISH GUY INC
1 issued · 2 parcels
vs 3 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: May 9, 2024
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 2 | 0 | — | $55,000 | — | 1d (3d p75) | — | |
| 1 | 1 | — | $50,000 | — | 14d (29d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2040 Sutterville Rd 12 City of Sacramento · APN 018-0011-006-0000 | Windows / doors / siding COM-2410185Portal ↗ | Applied May 9, 2024 | Expired Application | $27,500 | EPC - Reframe wall wear car hit building, Sheetrock, exterior sheet wall, replace floor, replace dry rotted floor, replace subfloor, replace any dry framing stucco exterior walls. Full kitchen / bathroom remodel Filed as: ELITE FINISH GUY INC |
| 2040 Sutterville Rd 12 City of Sacramento · APN 018-0011-006-0000 | Windows / doors / siding COM-2410184Portal ↗ | Applied May 9, 2024 | Void | $27,500 | UNIT 1 - Reframe wall wear car hit building, Sheetrock, exterior sheet wall, replace floor, replace dry rotted floor, replace subfloor, replace any dry framing stucco exterior walls. Kitchen / bathroom remodel Filed as: ELITE FINISH GUY INC |
| 2408 Empress St City of Sacramento · APN 277-0011-018-0000 | Fire alarm / sprinkler COM-2318812Portal ↗ | Issued Sep 27, 2023 22d review | Finaled | $50,000 | 1. Install new gas wall furnace in Units 6 and 10 (remove unpermitted electric baseboard heaters) 2. Provide new 100A house subpanel in utility room (properly size feeder conductors, provide required minimum work clearances about elec. equipment, provide proper termination of grounding and bonding, etc) 3. Remove all unapproved and unpermitted electrical installations throughout (common area lighting wired off of individual dwelling units, etc.) 4. Provide new wiring and site lighting required for means of egress illumination fed from house panel 5. Replace missing globe covers and/ or lighting fixtures at front entry of each individual dwelling unit 6. Provide new 10yr carbon monoxide and smoke detectors in every unit (Units 1 - 10) as required 7. Replace Unit 3 main breaker to match panel listing and not to exceed maximum subfeeder ampacity 8. Installation of unpermitted 75G water heater to meet minimum code (seismic strapping, T&P drain line, sediment trap, etc.) 9. Properly seal/ patch all building penetrations/ openings throughout 10. Provide contrasting color striping at exterior stairs upper approach and all treads (stripe shall be a minimum of 2 inches wide to a maximum of 4 inches wide placed parallel to, and not more than 1 inch from, the nose of the step or upper approach. The stripe shall extend the full width of the step or upper approach and shall be of material that is at least as slip resistant as the other treads of the stair. A painted stripe shall be acceptable to satisfy this requirement). 11. Tear-off, re-sheet and re-roof (approx. 60 squares). COOL ROOF REQUIRED. ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: ELITE FINISH GUY INC |