Active in City of Sacramento (257 permits)
Raw permit filing name: GOOD LIFE CONSTRUCTION INC
231 issued · 190 parcels
vs 84 prior 24m(+39%)
Includes 7 ADU permits
Sum of permit job values
Application → issuance
Latest: Oct 21, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 64 | 57 | — | $1,101,235 | 1d (n=57) | 1d (3d p75) | Within typical range | |
| 46 | 39 | — | $1,333,608 | 59d (n=39) | 14d (29d p75) | Above 75th pct turnaround | |
| 44 | 40 | — | $1,827,963 | 10d (n=40) | 4d (21d p75) | Within typical range | |
| 34 | 32 | — | $2,627,655 | 10d (n=32) | 0d (0d p75) | Above 75th pct turnaround | |
| 17 | 16 | — | $417,162 | 45d (n=16) | 42d (83d p75) | Within typical range | |
| 13 | 13 | — | $549,968 | 1d (n=13) | 0d (0d p75) | Above 75th pct turnaround | |
| 7 | 5 | 7 | $872,982 | 102d (n=5) | 97d (172d p75) | Within typical range | |
| 7 | 7 | — | $39,911 | 0d (n=7) | 0d (0d p75) | Within typical range | |
| 6 | 6 | — | $43,650 | 0d (n=6) | 1d (7d p75) | Within typical range | |
| 6 | 5 | — | $879,000 | 16d (n=5) | 0d (0d p75) | Above 75th pct turnaround | |
| 5 | 5 | — | $118,366 | 29d (n=5) | 63d (119d p75) | Faster than peer median | |
| 2 | 2 | — | $283,160 | 17d (n=2) | 14d (29d p75) | — | |
| 2 | 2 | — | $60,000 | 131d (n=2) | 10d (61d p75) | — | |
| 1 | 1 | — | $45,000 | — | 69d (132d p75) | — | |
| 1 | 1 | — | $10,000 | — | 5d (25d p75) | — | |
| 1 | 0 | — | — | — | 41d (93d p75) | — | |
| 1 | 0 | — | $13,000 | — | 33d (85d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
1 units · $300,000 · 2 permits
1 units · $22,100 · 1 permit
1 units · $200,000 · 1 permit
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2746 64th St City of Sacramento · APN 011-0291-013-0000 | Plumbing / water heater / sewer RES-2623514Portal ↗ | Issued Oct 21, 2026 1d review | Issued | $13,900 | PRIMARY BATH UPGRADE ALL INTERIOR NON STRUCTURAL WORK REMOVE AND REPLACE SHOWER WET AREA NEW TILE FLOOR AND WALLS, NEW VALVES WATER CONSERVING FIXTURES ARE REQUIRED TO BE INSTALLED THROUGHOUT THIS RESIDENCE PER SB 407 (NOTE: RESIDENCES BUILT AFTER JANUARY 1, 1994, ARE EXEMPT). CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R310.1 & R311.1. ALL WORK IS SUBJECT TO FIELD INSPECTION Filed as: GOOD LIFE CONSTRUCTION INC |
| 2500 2nd Ave City of Sacramento · APN 010-0354-025-0000 | General repair COM-2623423Portal ↗ | Applied Oct 20, 2026 | Applied | $8,000 | WALKWAY REPAIR Filed as: GOOD LIFE CONSTRUCTION INC |
| 1710 24th St City of Sacramento · APN 007-0326-011-0000 | General repair RES-2623272Portal ↗ | Applied Oct 16, 2026 | Plan Check Target | $11,000 | DECK REPLACEMENT: REMOVE ALL EXISTING DECK BOARDS ON EXISTING DECK. REPLACE UP TO 5 DAMAGED DECK JOISTS AS NEEDED. ADJUST JOISTS AS NEEDED FOR 14" O.C. SPACING.REMOVE EXISTING PLANTER BOX AND EXTEND EXISTING STAIRCASESTEPS WHERE PLANTER BOX WAS.INSTALL NEW TREX DECK BOARDS. INSTALL NEW TOP-MOUNTED STEEL RAILINGS AROUND RAISED DECK PERIMETER. separate minor permit to be issued for MEP for shed no permit required new shed under 120 sq ft Filed as: GOOD LIFE CONSTRUCTION INC |
| 2512 P St City of Sacramento · APN 007-0333-006-0000 | Windows / doors / siding COM-2622992Portal ↗ | Applied Oct 14, 2026 | Applied | $30,000 | Replace structural framing, install new concrete footings and structural columns, replace existing plywood sheathing, remove and rebuild front main entry stairs to meet code, install new railings around lower deck, remove and replace up to approx. 200 sf of damaged stucco. NEW PERMIT REQUIRED Filed as: GOOD LIFE CONSTRUCTION INC |
| 2570 41st St City of Sacramento · APN 014-0083-011-0000 | Accessory dwelling unit (new or conversion) RES-2617653Portal ↗ | Issued Oct 13, 2026 61d review | Issued | $115,000 2 units | EXPEDITED - CONVERSION OF DETACHED GARAGE TO 2 ADU'S 288SF EACH, TOTAL 576SF, EACH 1BED/1BATH. Carbon monoxide & Smoke alarms required. Reference CRC sections R310 & R311. ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: GOOD LIFE CONSTRUCTION INC |
| 180 Kiana Ln City of Sacramento · APN 225-1750-124-0000 | Plumbing / water heater / sewer RES-2620908Portal ↗ | Issued Oct 12, 2026 21d review | Issued | $19,000 | Repair and replace all damaged drywall, framing, stucco, stone veneer, insulation, sheathing, electrical, window, porch column, and toilet. All repairs to match existing. Project area 200 sq. ft. All proposed work at SE corner, first floor of dwelling. Fire Department Final Inspection Required. Carbon monoxide & Smoke alarms required. Reference 2025 CRC sections R315 & R314. Filed as: GOOD LIFE CONSTRUCTION INC |
| 470 N 16th St City of Sacramento · APN 001-0141-024-0000 | Commercial tenant improvement COM-2620311Portal ↗ | Issued Oct 9, 2026 25d review | Issued | $9,000 | EXPEDITED - Remodel two existing office rooms (about 525 sq. ft.) by replacing ceiling drywall, installing new LED can lights, replacing one door and frame, and installing new flooring. Filed as: GOOD LIFE CONSTRUCTION INC |
| 601 Roundtree Ct City of Sacramento · APN 030-0450-001-0000 | Roof replacement COM-2604991Portal ↗ | Issued Oct 2, 2026 203d review | Issued | $25,530 | CARPORT #213 - #216 REPAIR: REMOVE APPROXIMATELY 4'X20' AREA OF TORCH DOWN ROOFING AND PLYWOOD ON ROOF OF CARPORT. REMOVE (4) POST FOOTINGS AND POUR (4) NEW CONCRETE POST FOOTINGS. INSTALL (4) NEW POSTS. REPAIR MINOR DAMAGED JOISTS, AND REPLACE ANY JOISTS WITH EXTENSIVE DAMAGE IN THE CARPORT ROOF. INSTALL NEW ROOF SHEATHING, AND NEW TORCH DOWN ROOF MEMBRANE (APPROXIMATELY 4'X20' AREA). Filed as: GOOD LIFE CONSTRUCTION INC |
| 1401 I St City of Sacramento · APN 006-0055-009-0000 | Windows / doors / siding COM-2619457Portal ↗ | Issued Oct 1, 2026 28d review | Issued | $16,000 | BALCONY REPAIR Unit #827: REMOVE EXISTING SIDING AT WALL BASE AND SAVE FOR REINSTALL, REMOVE EXISTING WATERPROOFING, FLASHING AND PLYWOOD DECKING. INSTALL NEW CDX PLYWOOD DECKING TO MATCH EXISTING, INSTALL NEW L-FLASHING AND METAL DRIP EDGE AT WALL BASE, APPLY WESTCOAT 'ALX' WATERPROOFING SYSTEM, INSTALL NEW BUILDING PAPER AND REINSTALL REMOVED SIDING. NOTE: EXISTING RAILING TO BE REUSED. - PLNG-INSP Filed as: GOOD LIFE CONSTRUCTION INC |
| 1239 Spruce Tree Cir City of Sacramento · APN 031-0570-050-0000 | General repair RES-2621800Portal ↗ | Applied Sep 30, 2026 | Ready-to-Issue | $14,000 | CONCRETE PROPERTY WALL REPAIR DUE TO VEHICLE IMPACT. Carbon monoxide & Smoke alarms required. Reference CRC sections R310 & R311. ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: GOOD LIFE CONSTRUCTION INC |
| 3031 Enchanted Walk City of Sacramento · APN 201-1170-023-0016 | Windows / doors / siding COM-2616861Portal ↗ | Issued Sep 30, 2026 56d review | Issued | $7,000 | EPC - Repair vehicle damage to the existing garage, including replacement of damaged door, framing, stucco, and drywall, with paint to match existing finishes. No structural expansion or change of use. Filed as: GOOD LIFE CONSTRUCTION INC |
| 2610 U St City of Sacramento · APN 010-0116-023-0000 | General repair COM-2621613Portal ↗ | Applied Sep 29, 2026 | Applied | $5,000 | 2 SHARED PLANS -- BALCONY 'E' SOFFIT: REPLACE APPROXIMATELY 32 SF OF PLYWOOD SOFFIT. Shared plans reviewed under COM-2621569 Filed as: GOOD LIFE CONSTRUCTION INC |
| 2610 U St City of Sacramento · APN 010-0116-023-0000 | General repair RES-2621575Portal ↗ | Applied Sep 28, 2026 | Void | $5,000 | 2 SHARED PLANS -- BALCONY 'E' SOFFIT: REPLACE APPROXIMATELY 32 SF OF PLYWOOD SOFFIT. Shared plans reviewed under COM-2621569 Filed as: GOOD LIFE CONSTRUCTION INC |
| 2610 U St City of Sacramento · APN 010-0116-023-0000 | General repair COM-2621569Portal ↗ | Applied Sep 28, 2026 | Plan Check Wait | $5,000 | 2 SHARED PLANS -- MAIN WALKWAY 'C' & 'D': REPLACE 1 STRINGER. REPLACE 40 LINEAR FEET HANDRAILS. REPLACE 1 STAIR TREAD. REPLACE 2 POSTS AND ADD 2 CONCRETE FOOTINGS REPLACE 20 LINEAR FEET REDWOOD WALKING SURFACE BOARDS. BALCONY 'D': REPLACE 1 POST AND ADD CONCRETE FOOTING REPLACE 13 LINEAR FEET OF 2X6 WALKING SURFACE BOARDS. Shared plans reviewed under COM-2621569 Filed as: GOOD LIFE CONSTRUCTION INC |
| 2317 Castro Way City of Sacramento · APN 010-0346-022-0000 | Addition (adds square footage) COM-2616832Portal ↗ | Issued Sep 18, 2026 45d review | Finaled | $7,500 | EPC - 2 SHARED PLANS - 60 SF BALCONY REPLACEMENT : DEMOLISH THE EXISTING CANTILEVERED BALCONY AND CONSTRUCT A NEW SUPPORTED BALCONY WITH NEW CONCRETE FOOTINGS, P.T. POSTS, BEAMS, LEDGER, FRAMING, CDX PLYWOOD SHEATHING, FLASHING, WATERPROOF DECK COATING, STUCCO PATCHING, AND A NEW 42" CODE-COMPLIANT METAL RAILING. Rebuilt walkway decks will have the same layout as existing when complete Shared plans reviewed under COM-2616829 Filed as: GOOD LIFE CONSTRUCTION INC |
| 2309 Castro Way City of Sacramento · APN 010-0346-022-0000 | Addition (adds square footage) COM-2616829Portal ↗ | Issued Sep 18, 2026 45d review | Finaled | $7,500 | EPC - 2 SHARED PLANS - 60 SF BALCONY REPLACEMENT : DEMOLISH THE EXISTING CANTILEVERED BALCONY AND CONSTRUCT A NEW SUPPORTED BALCONY WITH NEW CONCRETE FOOTINGS, P.T. POSTS, BEAMS, LEDGER, FRAMING, CDX PLYWOOD SHEATHING, FLASHING, WATERPROOF DECK COATING, STUCCO PATCHING, AND A NEW 42" CODE-COMPLIANT METAL RAILING. Rebuilt walkway decks will have the same layout as existing when complete Shared plans reviewed under COM-2616829 Filed as: GOOD LIFE CONSTRUCTION INC |
| 2748 San Luis Ct City of Sacramento · APN 009-0341-006-0000 | Accessory dwelling unit (new or conversion) RES-2620699Portal ↗ | Applied Sep 17, 2026 | Plan Check Wait | $70,000 1 units | DETACHED 282 SQFT GARAGE CONVERSION TO ADU. - 1 BEDROOM, 1 BATHROOM AND KITCHENETTE. Filed as: GOOD LIFE CONSTRUCTION INC |
| 8190 Arroyo Vista Dr City of Sacramento · APN 117-0120-052-0000 | Windows / doors / siding COM-2620624Portal ↗ | Applied Sep 17, 2026 | Plan Check Wait | $12,000 | Repair walkway waterproofing, plywood, joists, flashing, concrete, stucco, fascia, and railings as needed along 6 different sections of walkway (Units: 3/5/7, 13/15/19, 49/51/55). Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: GOOD LIFE CONSTRUCTION INC |
| 1522 24th St City of Sacramento · APN 007-0256-016-0000 | General repair COM-2618001Portal ↗ | Issued Sep 14, 2026 27d review | Issued | $9,000 | Balcony and stair landing repair. - PLNG-INSP Filed as: GOOD LIFE CONSTRUCTION INC |
| 220 26th St City of Sacramento · APN 003-0095-041-0000 | Windows / doors / siding COM-2614703Portal ↗ | Issued Aug 27, 2026 48d review | Issued | $10,000 | EPC - BALCONY REPAIR SCOPE : REMOVE (E) WALL SIDING AT WALL BASE AND REMOVE (E) BALCONY CONCRETE DECKING. REMOVE (E) FLASHING AND (E) DAMAGED PLYWOOD DECKING. INSTALL NEW PLYWOOD DECKING TO MATCH EXISTING. INSTALL NEW L-FLASHING AND METAL DRIP EDGE AT WALL BASE. INSTALL WATERPROOFING MEMBRANE OVER NEW PLYWOOD DECKING PER MFR REQUIREMENTS. POUR NEW CONCRETE DECKING TO MATCH EXISTING ELEVATION. INSTALL NEW BUILDING PAPER BEHIND SIDING IN REPAIRED AREAS. INSTALL NEW SIDING TO MATCH EXISTING. REMOVE & REPLACE RAIL CAP. STAIR LANDING REPAIR SCOPE : POWER WASH AND APPLY WESTCOAT SC-10 WATERPROOF COATING. REPLACE DAMAGED SOFFIT PANELS TO MATCH EXISTING. Filed as: GOOD LIFE CONSTRUCTION INC |
| 2791 Meadowview Rd City of Sacramento · APN 049-0250-024-0000 | Windows / doors / siding COM-2615856Portal ↗ | Issued Aug 25, 2026 32d review | Issued | $7,000 | EPC - Walkway Repair: Remove Existing siding, waterproofing and plywood. Install new 3/4' CDX plywood. Add waterproof and metal flashing. Install new westcoat waterproof concrete system. Replace siding to match existing. Filed as: GOOD LIFE CONSTRUCTION INC |
| 715 19th St City of Sacramento · APN 003-0174-001-0000 | Windows / doors / siding COM-2614702Portal ↗ | Issued Aug 25, 2026 46d review | Issued | $10,000 | EPC - BALCONY REPAIR SCOPE: REMOVE (E) WALL SIDING AT WALL BASE AND REMOVE (E) BALCONY CONCRETE DECKING. REMOVE (E) FLASHING AND (E) DAMAGED PLYWOOD DECKING. INSTALL NEW PLYWOOD DECKING TO MATCH EXISTING. INSTALL NEW L-FLASHING AND METAL DRIP EDGE AT WALL BASE. INSTALL WATERPROOFING MEMBRANE OVER NEW PLYWOOD DECKING PER MFR REQUIREMENTS. POUR NEW CONCRETE DECKING TO MATCH EXISTING ELEVATION. INSTALL NEW BUILDING PAPER BEHIND SIDING IN REPAIRED AREAS. INSTALL NEW SIDING TO MATCH EXISTING. REMOVE & REPLACE RAIL CAP. STAIR LANDING REPAIR SCOPE: POWER WASH AND APPLY WESTCOAT SC-10 WATERPROOF COATING. REPLACE DAMAGED SOFFIT PANELS TO MATCH EXISTING. Filed as: GOOD LIFE CONSTRUCTION INC |
| 1334 61st St City of Sacramento · APN 008-0316-007-0000 | Roof replacement RES-2618502Portal ↗ | Issued Aug 24, 2026 0d review | Finaled | $6,900 | Roof Permit: Partial reroof. Attached sunroom only. Remove and replace 3 squares TPO torch down roofing. Tear off and install 3 squares of 30 yr laminated dimensional composition roofing material. In-progress inspection required if 10 sq or greater. CF-6R-ENV-01 required at final inspection. CF-1R-ALT on file. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: GOOD LIFE CONSTRUCTION INC |
| 2525 N St City of Sacramento · APN 007-0164-015-0000 | Demolition COM-2616761Portal ↗ | Issued Aug 20, 2026 16d review | Issued | $5,000 | EPC - BALCONY REPAIR SCOPE: 1. DEMO APPROX. 70 SQ. FT. OF THE CURRENT WATERPROOFING SYSTEM 2. INSTALL NEW METAL LATH. 3. INSTALL NEW METAL FLASHING. 4. INSTALL WESTCOAT ALX PRO WATERPROOF SYSTEM Filed as: GOOD LIFE CONSTRUCTION INC |
| 2120 Catskill Way City of Sacramento · APN 252-0292-048-0000 | HVAC / heat pump RES-2616369Portal ↗ | Issued Aug 18, 2026 19d review | Issued | $284,000 | FIRE DAMAGED REPAIR FOR 1936 SQ FT. REPLACE INTERIOR WALL FINISHES, INSULATION, 2 ENTRY DOORS, 1 ENTRY GARAGE DOOR, 9 INTERIOR DOORS, 5 WINDOWS, DAMAGED ELECTRICAL WIRING BACK TO PANEL, EXISTING FAU, CONDENSOR, DUCTWORK. PLUMBING FIXTURE WILL BE REPLACED IN LIKE KIND. WITH HVAC WORK MEETING TITLE 24 AND MATCHING EXISTING CONDITIONS. Water conserving fixtures are required to be installed throughout this residence per SB 407. The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in (2010). CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314. Filed as: GOOD LIFE CONSTRUCTION INC |