Active in City of Sacramento (13 permits)
Raw permit filing name: IMPERIAL ELECTRIC SERVICE
7 issued · 6 parcels
vs 1 prior 24m
4 construction/remodel
Sum of permit job values
Application → issuance
Latest: Nov 22, 2024
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 5 | 3 | — | $860,000 | 155d (n=3) | 40d (91d p75) | Above 75th pct turnaround | |
| 4 | 4 | — | $246,500 | 59d (n=4) | 4d (21d p75) | Above 75th pct turnaround | |
| 3 | 0 | — | — | — | 41d (93d p75) | — | |
| 1 | 0 | — | $6,000 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1782 Tribute Rd City of Sacramento · APN 277-0310-003-0000 | EV charger COM-2425760Portal ↗ | Applied Nov 22, 2024 | Plan Check Wait | $200,000 | EPC - Installation of two extra DC fast Chargers. Filed as: IMPERIAL ELECTRIC SERVICE |
| 1780 Tribute Rd City of Sacramento · APN 277-0310-002-0000 | EV charger COM-2425628Portal ↗ | Applied Nov 21, 2024 | Expired Application | $200,000 | EPC - Installation of two extra DC fast Chargers Filed as: IMPERIAL ELECTRIC SERVICE |
| 8642 Elder Creek Rd City of Sacramento · APN 064-0020-008-0000 | EV charger COM-2317466Portal ↗ | Issued Feb 26, 2024 193d review | Finaled | $300,000 | EPC - Installation of 4 EV DC Fast Chargers SEE REVISION COM-2410856 - REVISED FIRE PUMP SERVICE FEED. Filed as: IMPERIAL ELECTRIC SERVICE |
| 1701 L St City of Sacramento · APN 006-0126-022-0000 | Remodel / interior alteration COM-2109306Portal ↗ | Issued May 27, 2021 24d review | Finaled | $6,500 | EPC : INSTALLATION OF A SMUD CURRENT TRANSFORMER CABINET AND A METER SOCKET IN A METER PANEL TO PROVIDE UTILITY METERING FOR EXISTING ELECTRIC VEHICLE CHARGING SYSTEM. NO WORK SHALL BE DONE ON PARKING SPACES OR EXISTING ELECTRIC VEHICLE CHARGING SYSTEM POWER DISTRIBUTION. Filed as: IMPERIAL ELECTRIC SERVICE |
| 1701 L St City of Sacramento · APN 006-0126-022-0000 | Electrical / panel COM-2109204Portal ↗ | Applied Apr 30, 2021 | Void | $6,000 | Installation of a SMUD current transformer cabined and a meter socket in a meter panel to provide utility metering for existing electrical vehicle charging system Filed as: IMPERIAL ELECTRIC SERVICE |
| 1780 Tribute Rd City of Sacramento · APN 277-0310-002-0000 | Plan revision / deferred submittal COM-2010621Portal ↗ | Applied Jun 19, 2020 | Complete | — | EPC - REVISION TO COM-1922283: Remove level 3 chargers and show utility transformer Filed as: IMPERIAL ELECTRIC SERVICE |
| 1782 Tribute Rd City of Sacramento · APN 277-0310-003-0000 | Plan revision / deferred submittal COM-2010620Portal ↗ | Applied Jun 19, 2020 | Complete | — | EPC - REVISION TO COM-1922442: Revision to remove disconnects on the level 3 charging stations. Filed as: IMPERIAL ELECTRIC SERVICE |
| 1780 Tribute Rd City of Sacramento · APN 277-0310-002-0000 | EV charger COM-1922283Portal ↗ | Issued Apr 17, 2020 155d review | Finaled | $80,000 | EPC Submittal - REVIEW 5-5-5 This project will consist of the installation of a 1200A 120/208V N3R with a 1200A main breaker switchgear, the installation of Four (4) EV chargers, and the re-striping of existing parking lot to add two (2) accessible stalls capable of EV charging. No new transformer being added. SEE REVISION COM-2010621: REVISION TO COM-1922283: Remove level 3 chargers and show utility transformer Filed as: IMPERIAL ELECTRIC SERVICE |
| 1782 Tribute Rd City of Sacramento · APN 277-0310-003-0000 | EV charger COM-1922442Portal ↗ | Issued Mar 30, 2020 133d review | Finaled | $80,000 | EPC Submittal - This project will consist of the installation of a 1200A 120/208V N3R with a 1200A main breaker switchgear, the installation of four (4) EV chargers, and the re-striping of existing parking lot to add two (2) ADA stalls capable of EV charging. No new transformer will be added. SEE REVISION COM-2010620: REVISION TO COM-1922442: Revision to remove disconnects on the level 3 charging stations. Filed as: IMPERIAL ELECTRIC SERVICE |
| 2200 Harvard St City of Sacramento | Remodel / interior alteration COM-1921394Portal ↗ | Issued Mar 30, 2020 147d review | Finaled | $80,000 | EPC Submittal REVIEW 5-5-5- INSTALLATION OF ONE MAIN SWITCHBOARD, FIVE EVBOX LEVEL 2 ELECTRIC VEHICLES CHARGER(S), FOUR FAST CHARGER(S) AND TWO (2) ACCESSIBLE PARKING STALLS. NEW ELECTRICAL SERVICE FOR INSTALLATION OF ELECTRIC VEHICLE CHARGERS SHALL BE SERVICED BY NEW UTILITY PROVIDED TRANSFORMER***REVISION TO COM-1921394: CHANGE THE LOCATION OF THE TRANSFORMER PAD, MAIN SWITCHBOARD AND (4) OF THE DCFC*** Filed as: IMPERIAL ELECTRIC SERVICE |
| 321 Bercut Dr City of Sacramento · APN 001-0182-024-0000 | Remodel / interior alteration COM-2002483Portal ↗ | Issued Mar 25, 2020 41d review | Finaled | $80,000 | EPC Submittal - INSTALLATION OF ONE(1) 600A-277/480V-3PH-4W MAIN SWITCHBOARD, SIX (6) 208V-1P-40A-N3R EVBOX LEVEL 2 ELECTRIC VEHICLES CHARGER(S), FOUR (4) 480V-3P-100A-N3R TRITIUM DC FAST CHARGER(S) AND TWO (2) A.D.A PARKING STALLS. NEW ELECTRICAL SERVICE FOR INSTALLATION OF ELECTRIC VEHICLE CHARGERS.***REVISION TO COM-2005483: This revision is to change the location of the EVCS closer to the main street. THis revision is also to change the contractor provided transformer size from a 112.5kva to a 75kva.*** ( **** SEE ATTACHMENT 12/16/2020**** request to withdraw Revision COM-2018087 ) Filed as: IMPERIAL ELECTRIC SERVICE |
| 1701 L St City of Sacramento · APN 006-0126-022-0000 | Plan revision / deferred submittal COM-2004178Portal ↗ | Applied Mar 9, 2020 | Complete | — | EPC - Revision to Permit COM-1922150 - Revised the EV Panel Circuit Breaker from 250A to 225A. Filed as: IMPERIAL ELECTRIC SERVICE |
| 1701 L St City of Sacramento · APN 006-0126-022-0000 | Remodel / interior alteration COM-1922150Portal ↗ | Issued Jan 30, 2020 77d review | Finaled | $80,000 | EPC Submittal - REVIEW 5-5-5 The installation of five (5) EV Chargers and the re-stripping of an existing parking lot to add two (2) accessible stalls capable of EV Charging. Power will be distributed through and existing 1600A-277/480V Switchgear revision COM-2009968 electrical pages crf 6-11-2020 Filed as: IMPERIAL ELECTRIC SERVICE |