Active in City of Sacramento (249 permits)
Raw permit filing name: PHE INC
214 issued · 197 parcels
vs 67 prior 24m(−64%)
133 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 21, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 132 | 127 | 1 | $433,429 | 3d (n=127) | 4d (21d p75) | Within typical range | |
| 71 | 61 | — | $3,009,019 | 19d (n=61) | 40d (91d p75) | Faster than peer median | |
| 19 | 0 | — | $20,350 | — | 41d (93d p75) | — | |
| 18 | 17 | — | $27,156 | 0d (n=17) | 0d (0d p75) | Within typical range | |
| 4 | 4 | 9 | — | 7d (n=4) | 14d (29d p75) | Faster than peer median | |
| 2 | 2 | — | $112,660 | 42d (n=2) | 33d (85d p75) | — | |
| 1 | 1 | — | $7,895 | — | 63d (119d p75) | — | |
| 1 | 1 | — | $750 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $15,000 | — | 19d (42d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 0 Unknown City of Sacramento | Fire alarm / sprinkler CF-2621792Portal ↗ | Issued Oct 21, 2026 21d review | Issued | — | Installation of EV charging stations in parking lot. Continuing from already appproved, pre-installed conduits. Filed as: PHE INC |
| 2329 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618634Portal ↗ | Applied Aug 25, 2026 | Applied | $78,636 | 8 SHARED PLANS -- Installation of four (4) EV charging stations in HOA owned garages and installation of one (1) Milbank pedestal. This building, building H, contains garages Hl, H2, H3, and H4. Garages Hl and H2 are fed from pedestal A at 2309 American River Drive Unit A. Garages H3 and H4 are fed from pedestal Bat 2329 American River Drive Unit A. . Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 2329 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618633Portal ↗ | Applied Aug 25, 2026 | Applied | $39,318 | 8 SHARED PLANS -- Installation of two (2) EV charging stations in HOA owned garages. This building, building F, contains garages Fl and F2. Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 2329 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618631Portal ↗ | Applied Aug 25, 2026 | Applied | $39,318 | 8 SHARED PLANS -- Installation of two (2) EV charging stations in HOA owned garages. This building, building E, contains garages El and E2. Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 2329 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618629Portal ↗ | Applied Aug 25, 2026 | Applied | $39,318 | 8 SHARED PLANS -- Installation of two (2) EV charging stations in HOA owned garages. This building, building D, contains garages Dl and D2. Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 2309 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618626Portal ↗ | Applied Aug 25, 2026 | Applied | $39,318 | 8 SHARED PLANS -- Installation of two (2) EV charging stations in HOA owned garages. This building, building G, contains garages Gl and G2. Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 2309 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618621Portal ↗ | Applied Aug 25, 2026 | Applied | $39,318 | 8 SHARED PLANS -- Installation of two (2) EV charging stations in HOA owned garages. This building, building C, contains garages Cl and C2. Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 2309 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618618Portal ↗ | Applied Aug 25, 2026 | Applied | $39,318 | 8 SHARED PLANS -- Installation of two (2) EV charging stations in HOA owned garages. This building, building b, contains garages B1 and B2. Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 2309 American River Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2618614Portal ↗ | Applied Aug 25, 2026 | Processing | $39,318 | 8 SHARED PLANS -- Installation of two (2) EV charging stations in HOA owned garages. This building, building A, contains garages Al and A2. Shared plans reviewed under COM-2618614 Filed as: PHE INC |
| 927 Commons Dr A City of Sacramento · APN 295-0330-054-0000 | EV charger COM-2608078Portal ↗ | Issued Jun 23, 2026 61d review | Finaled | $399,667 | EPC - Installation of thirty-eight (38) charging stations in parking area. Filed as: PHE INC |
| 2675 Altos Ave City of Sacramento · APN 263-0171-032-0000 | EV charger COM-2601473Portal ↗ | Issued Feb 5, 2026 12d review | Finaled | $157,613 | EPC - Installing eight (8) electric vehicle charging stations - dual mounted on pedestals. Filed as: PHE INC |
| 8300 Demetre Ave City of Sacramento · APN 062-0010-040-0000 | EV charger COM-2517653Portal ↗ | Issued Oct 10, 2025 50d review | Finaled | $51,655 | EPC - Installing one dual handle Dispenser and one bollard and associated parking restriping Filed as: PHE INC |
| 2227 River Plaza Dr City of Sacramento · APN 274-0360-007-0000 | Plan revision / deferred submittal COM-2521107Portal ↗ | Applied Oct 6, 2025 | Complete | — | EPC - Change in-ground bollards to bolt-down at all locations. Filed as: PHE INC |
| 6001 Midway St City of Sacramento · APN 062-0010-040-0000 | EV charger COM-2517651Portal ↗ | Issued Sep 30, 2025 40d review | Finaled | $54,965 | EPC - Will install one EV charging station, bollard, and in ground pull box REVISION COM-2523941 - scope updated to designate the (2) EV stalls to be for private use. Filed as: PHE INC |
| 2206 Gateway Oaks Dr City of Sacramento · APN 274-0360-003-0000 | EV charger COM-2511997Portal ↗ | Issued Sep 17, 2025 99d review | Issued | $39,451 | EPC - 6 SHARED PLANS BUILDING 16, REPLACE (1) L2 DISPENSER Filed as: PHE INC |
| 2212 Gateway Oaks Dr City of Sacramento · APN 274-0360-003-0000 | EV charger COM-2511995Portal ↗ | Issued Sep 17, 2025 99d review | Finaled | $39,451 | EPC - 6 SHARED PLANS BUILDING 14, NSTALL (1) DUAL L2 DISPENSER, INSTALL (1) SINGLE L2 DISPENSER, INSTALL (4) BOUARDS Filed as: PHE INC |
| 2216 Gateway Oaks Dr City of Sacramento · APN 274-0360-002-0000 | EV charger COM-2511991Portal ↗ | Issued Sep 17, 2025 99d review | Finaled | $78,901 | EPC - 6 SHARED PLANS BUILDING 9 , INSTALL (1) DUAL L2 DISPENSER, INSTALL (1) SINGLE L2 DISPENSER, INSTALL (4) BOUARDS Filed as: PHE INC |
| 2230 Gateway Oaks Dr City of Sacramento · APN 274-0360-002-0000 | EV charger COM-2511990Portal ↗ | Issued Sep 17, 2025 99d review | Finaled | $78,901 | EPC - 6 SHARED PLANS BUILDING 8 Install One (1) Dual L2 Dispenser Install (1) Single L2 Dispenser Install four (4) Bollards Filed as: PHE INC |
| 2236 Gateway Oaks Dr City of Sacramento · APN 274-0360-001-0000 | EV charger COM-2511967Portal ↗ | Issued Sep 17, 2025 100d review | Issued | $39,451 | EPC - 6 SHARED PLANS BUILDING 7 , REPLACE (1) L2 DISPENSER Shared plans reviewed under COM-2511958 Filed as: PHE INC |
| 2227 River Plaza Dr City of Sacramento · APN 274-0360-007-0000 | EV charger COM-2511958Portal ↗ | Issued Sep 17, 2025 100d review | Finaled | $39,451 | EPC - 6 SHARED PLANS LEASING OFFICE, INSTALL (2) DUAL L2 DISPENSER, INSTALL (2) SINGLE L2 DISPENSER, INSTALL (8) BOUARDS, INSTALL (1) 200A MILBANK PEDESTAL, WITH METER SOCKET & PANELBOARD "BL" SEE REVISION COM-2521107 FOR REVISED BOLLARD INSTALLATION - 10/6/25 - NCB Filed as: PHE INC |
| 500 N St City of Sacramento · APN 006-0300-007-0000 | EV charger COM-2506098Portal ↗ | Issued May 8, 2025 42d review | Finaled | $160,465 | EPC - Install (47) Orange NEMA 5-20R Receptacles Install (12) Junction Boxes Install (1) 400A, 208Y/120V Panelboard "EV" Filed as: PHE INC |
| 525 N 16th St City of Sacramento · APN 001-0104-018-0000 | EV charger COM-2422829Portal ↗ | Issued Jan 21, 2025 91d review | Finaled | $91,605 | EPC - Installation of two (2) DCFC charging stations Filed as: PHE INC |
| 14 Kelso Cir City of Sacramento · APN 225-0600-024-0000 | Plan revision / deferred submittal RES-2426316Portal ↗ | Applied Dec 3, 2024 | Complete | — | REVISION TO RES-2412570 - Updated the plot plan and one-line diagram to include sub panel. Filed as: PHE INC |
| 14 Sunny Hollow Ct City of Sacramento · APN 117-0410-056-0000 | Remodel / interior alteration RES-2424730Portal ↗ | Issued Nov 14, 2024 6d review | Finaled | $1,400 | EV Charger Permit: Installation of Tesla wall connector charger in garage for EV charging. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994, are exempt). Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: PHE INC |
| 266 Box Ln City of Sacramento · APN 009-0450-001-0009 | Remodel / interior alteration RES-2422308Portal ↗ | Applied Oct 10, 2024 | Expired Application | $1,500 | installation of enphase IQ 40 in garage for EV Charger Filed as: PHE INC |