Active in City of Sacramento (11 permits) · Unincorporated Marin (2 permits)
Raw permit filing aliases merged: S C ANDERSON GROUP INTERNATIONAL INC · SC Anderson Group International, Inc.
13 issued · 8 parcels
vs 0 prior 24m
1 construction/remodel
Sum of permit job values
Application → issuance
Latest: Mar 5, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 9 | 9 | — | $88,960 | 1d (n=9) | 14d (29d p75) | Faster than peer median | |
| 1 | 1 | — | $15,477 | — | 4d (21d p75) | — | |
| 1 | 1 | — | $44,391 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $10,448 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $44,451 | — | 1d (3d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 17 Fay Dr Unincorporated Marin · APN 071-191-03 | General repair 178778Portal ↗ | Issued Mar 5, 2025 14d review | Issued | $25,758 | Water Damage Repair In Laundry Rm And Bedrm Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 4451 Gateway Park Blvd 521 City of Sacramento · APN 225-1620-004-0000 | General repair COM-2104527Portal ↗ | Issued Mar 4, 2021 1d review | Finaled | $6,565 | Non-structural interior repair due to water damage in bathroom and closet. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Residences built after January 1, 1994 are exempt). Changes in this scope require PRE-approval from Building Department. Access to perform inspection/s must be provided by the Party requesting the inspection. Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 943 North Ave 60 City of Sacramento · APN 237-0200-088-0000 | General repair COM-2103410Portal ↗ | Issued Feb 22, 2021 4d review | Finaled | $11,960 | Non-structural repair in master bedroom and hallway due to flood damage. Fire-rated assemblies and finishes to match existing. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection. Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 943 North Ave 56 City of Sacramento · APN 237-0200-088-0000 | General repair COM-2103408Portal ↗ | Issued Feb 22, 2021 4d review | Finaled | $11,108 | Non-structural repair in master bedroom and hallway due to flood damage. Fire-rated assemblies and finishes to match existing. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection. Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 4035 May St 72 City of Sacramento · APN 237-0200-088-0000 | General repair COM-2021582Portal ↗ | Issued Nov 20, 2020 0d review | Finaled | $13,875 | Repair wall and associated finishes due to vehicle damage. Reinstate all existing building envelope and fire-rated assemblies. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection. Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 4451 Gateway Park Blvd 533 City of Sacramento · APN 225-1620-004-0000 | Electrical / panel COM-2017012Portal ↗ | Issued Sep 22, 2020 4d review | Finaled | $10,448 | (Apt # 533) WATER DAMAGE REPAIR: Set up bearing post, ply wood post for shear and remove / REPLACE framing to allow plumber access to drain above. Remove and replace stucco and RESET 2'x3' window. Replace insulation, drywall and light fixture ; ALL WORK IS SUBJECT TO FIELD INSPECTION (NO PERMIT REFUNDS WILL BE ISSUED IF IT IS DEEMED BY THE CITY INSPECTOR THAT CONSTRUCTION DRAWINGS WILL BE NECESSARY TO COMPLETE THE PROJECT) Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 14 Mt Palomar Ct Unincorporated Marin · APN 164-431-43 | Windows / doors / siding B22438Portal ↗ | Issued Apr 22, 2020 6d review | Issued | $44,451 | Siding - Due to mold. — Siding Replacement Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 200 Jibboom St City of Sacramento · APN 001-0012-025-0000 | Roof replacement COM-1913446Portal ↗ | Issued Jul 24, 2019 5d review | Finaled | $44,391 | EXPEDITED - LA QUINTA INN- ASPHALT RESURFACE(9000sf) of parking lot; Minor Roof Repair - (Front Office Location); Replace (1) ADA Sign within parking lot; All work is subject to field inspection . NO PARKING STALL CHANGES OR REMOVAL- FLATWORK ONLY Filed as: SC Anderson Group International, Inc. |
| 6000 S Land Park Dr 228 City of Sacramento · APN 024-0430-016-0000 | General repair COM-1811697Portal ↗ | Issued Jun 20, 2018 0d review | Finaled | $5,000 | DRY ROT REPAIR - STRINGER AT BUILDING D UNIT 228-229 Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 6000 S Land Park Dr City of Sacramento · APN 024-0430-016-0000 | General repair COM-1805906Portal ↗ | Issued Apr 2, 2018 0d review | Finaled | $6,000 | BLDG D***Dry Rot Repair. R/R finish and rot on two landing, deck coating and plywood like for like. No framing changes. Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 6000 S Land Park Dr City of Sacramento · APN 024-0430-016-0000 | General repair COM-1805904Portal ↗ | Issued Apr 2, 2018 0d review | Finaled | $3,000 | BLDG F***Dry Rot Repair. R/R finish and rot on one landing, deck coating and plywood like for like. No framing changes. Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 4200 E Commerce Way 113 City of Sacramento · APN 225-2030-001-0003 | General repair COM-1715029Portal ↗ | Issued Aug 21, 2017 3d review | Finaled | $5,693 | UNIT #3***water damage from a leaky washer, will be removing drywall about 24" up and replacing with new drywall, insulation, and flooring. Filed as: S C ANDERSON GROUP INTERNATIONAL INC |
| 4649 12th Ave City of Sacramento · APN 014-0252-027-0000 | Remodel / interior alteration RES-1614762Portal ↗ | Issued Sep 14, 2016 0d review | Finaled | $15,477 | Non-Structural master bathroom / closet remodel associated with leaking tub drain. New floor drain, new sub floor, new insulation under tub, master bedroom closet and small area under family room floor. New sheet rock, tub, toilet, vanity and tile floor and tile approx. 4' up on bathroom walls. “Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 Filed as: S C ANDERSON GROUP INTERNATIONAL INC |