Active in City of Sacramento (48 permits)
Raw permit filing name: S E HARRISON INC
16 issued · 11 parcels
vs 5 prior 24m
18 construction/remodel
Sum of permit job values
Application → issuance
Latest: Aug 28, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 27 | 1 | 305 | $3,039,339 | — | 41d (93d p75) | — | |
| 7 | 6 | — | $3,102,900 | 65d (n=6) | 63d (119d p75) | Within typical range | |
| 4 | 3 | — | $204,886 | 12d (n=3) | 4d (21d p75) | Within typical range | |
| 3 | 2 | 135 | $21,382,883 | 233d (n=2) | 210d (365d p75) | — | |
| 2 | 2 | 26 | $8,388,487 | 204d (n=2) | 42d (83d p75) | — | |
| 2 | 2 | — | $19,500 | 13d (n=2) | 0d (0d p75) | — | |
| 1 | 0 | — | $2,339,123 | — | 241d (334d p75) | — | |
| 1 | 0 | — | $153,400 | — | 1d (7d p75) | — | |
| 1 | 0 | — | $1,477,162 | — | 0d (0d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 8610 Elder Creek Rd City of Sacramento · APN 064-0020-040-0000 | New commercial / non-residential building COM-2619027Portal ↗ | Applied Aug 28, 2026 | Plan Check Target | $2,339,123 | Construction of a new single story office building, approximately 6,977sf . Scope includes new building shell, interior office improvements, restrooms, accessible route, site parking, landscaping, site lighting, utility connections and associated site improvements. Overall Site Improvements include 53,560 SF. Scope also includes demo of (2) exiting buildings. Demo of (1) 2,160 SF residential building and demo of (1) 3,000 SF Commercial building. - PLNG-INSP Filed as: S E HARRISON INC |
| 1016 R St City of Sacramento · APN 009-0073-004-0000 | Plan revision / deferred submittal COM-2427242Portal ↗ | Applied Dec 16, 2024 | Complete | — | EPC - Change to main suite entry door from 36" to 42" and addition of push button power assist opener with hi/low buttons interior / exterior Filed as: S E HARRISON INC |
| 1016 R St City of Sacramento · APN 009-0073-004-0000 | Commercial tenant improvement COM-2410612Portal ↗ | Issued Aug 5, 2024 82d review | Finaled | $143,500 | EPC - Within existing 3,414 sf suite, minor alterations are required for Landlord Delivery obligations to this empty unimproved suite under new Lease including; 1) modify ex. storefront doors to provide a pair of entry doors and close two other ex. entry doors; 2) install accessible toilet room w/ exhaust fan & light; 3) install janitor's room w/ exhaust fan & light; provide future water and drain stubs for future potential drinking fountain and or break room sink. SEE REVISION COM-2427242 for revised entry door installation - 12/16/24 - NCB revision COM-2501008 Electrical scope revision to address electrical inspection correction notice. Revise electrical plans correct typo on E.02 to show panel B-1 as existing (instead of N). Filed as: S E HARRISON INC |
| 1020 R St City of Sacramento · APN 009-0073-004-0000 | Remodel / interior alteration COM-2413892Portal ↗ | Issued Jul 9, 2024 14d review | Finaled | $15,000 | EPC - Install surge protector Filed as: S E HARRISON INC |
| 1615 S St City of Sacramento · APN 009-0093-009-0000 | Commercial tenant improvement COM-2408564Portal ↗ | Issued Jun 6, 2024 48d review | Finaled | $206,000 | EXPEDITED - EPC - Office tenant improvement (3436 sf) on the first floor in shell building currently under construction, see permit COM-2206081. Filed as: S E HARRISON INC |
| 1625 S St City of Sacramento · APN 009-0093-009-0000 | Plan revision / deferred submittal COM-2302370Portal ↗ | Applied Feb 8, 2023 | Complete | — | EPC - PROVIDE NEW SPRINKLER MONITORING SYSTEM WITH FULL OCCUPANT NOTIFICATION. SYSTEM SHALL MONITOR ALL FIRE ALARM INITIATING DEVICES AS INDICATED ON THE DESIGN PLANS. Filed as: S E HARRISON INC |
| 1629 S St City of Sacramento · APN 009-0093-009-0000 | Plan revision / deferred submittal COM-2224334Portal ↗ | Applied Nov 15, 2022 | Complete | — | EPC - Deferred to COM-2206081 for installation of fire sprinkler systems with electrical fire pump. Filed as: S E HARRISON INC |
| 1625 S St City of Sacramento | New multifamily / condos / mixed-use COM-2206081Portal ↗ | Issued Sep 16, 2022 179d review | Certificate of Occupancy | $9,393,283 47 units | MULTI-FAMILY HOUSING - EPC - MULTI-UNIT HOUSING - Construction of a mixed-use project, total of 59,840 SF with 5,969 SF ground floor restaurant, 3,242 SF office, and 3 levels of apartments (47 units) above. Type VA, R2 Occupancy. - PLNG-INSP Existing 17,361 SF office building will be demolished under a separated wrecking permit. Filed as: S E HARRISON INC |
| 1827 Broadway City of Sacramento · APN 010-0211-015-0000 | New multifamily / condos / mixed-use COM-2206862Portal ↗ | Applied Mar 30, 2022 | Expired Application | $7,989,600 47 units | MULTI-FAMILY HOUSING - EPC - MULTI-UNIT HOUSING - 4 levels of apartments (47 units total) over a single level of 5,926 SF restaurants plus building services and residential lobby. A wrecking permit for the removal of the existing building will be submitted separately. - PLNG-INSP Filed as: S E HARRISON INC |
| 1024 R St City of Sacramento · APN 009-0073-004-0000 | Plan revision / deferred submittal COM-2020131Portal ↗ | Applied Oct 30, 2020 | Complete | — | EPC - REVISION TO COM-2013168 to remove interior windows, size reduction of operable glass wall, material change of ceiling in open office 115 and updated details on A670. Filed as: S E HARRISON INC |
| 1024 R St City of Sacramento · APN 009-0073-004-0000 | Commercial tenant improvement COM-2013168Portal ↗ | Issued Sep 1, 2020 36d review | Certificate of Occupancy | $500,000 | EPC - Interior remodel-new interior walls, new lighting, new electrical receptacles, new supply and returns, new fixture and finishes. REVISON COM-2020131- to remove interior windows, size reduction of operable glass wall, material change of ceiling in open office 115 and updated details on A670. Filed as: S E HARRISON INC |
| 1818 X St City of Sacramento · APN 010-0211-020-0000 | Plan revision / deferred submittal COM-2010306Portal ↗ | Applied Jun 16, 2020 | Complete | — | EPC - Revision to COM-1806149 for electrical as-built changes Filed as: S E HARRISON INC |
| 1030 R St City of Sacramento · APN 009-0073-004-0000 | Plan revision / deferred submittal COM-2003790Portal ↗ | Applied Mar 3, 2020 | Complete | — | EPC - REVISION TO COM-1919479: removal of controlled receptacles not required, noted as delta 3 on plans. Filed as: S E HARRISON INC |
| 1818 X St City of Sacramento · APN 010-0211-020-0000 | Plan revision / deferred submittal COM-2003595Portal ↗ | Applied Feb 28, 2020 | Complete | — | EXPEDITED - REVISION TO COM- 1806149 : (ALTERNATE MEANS TO CONSTRUCTION) POWER AND CONTROL CABLE TYPE TC-ER-JP MEETS OR EXCEEDS THE CONSTRUCTION SEPC OF TYPE NM CABLE WHICH IS THE ALLOWED WIRING METHOD THAT WILL REPLACING Filed as: S E HARRISON INC |
| 1030 R St City of Sacramento · APN 009-0073-004-0000 | Commercial tenant improvement COM-1919479Portal ↗ | Issued Jan 7, 2020 90d review | Certificate of Occupancy | $700,000 | EXPEDITED - EPC Submittal - Interior remodel - New interior walls, new lighting, new supply and returns, new fixtures and finishes. SEE REVISION COM-2000516: Slab coordination plan for reference. Added notes for blue bangers being used for attachments. Added fan coil control detail. Mechanical/plumbing specifications added for contractor .Added plumbing line for ice maker. Plumbing routing changes. Pipe support schedule revised. Filed as: S E HARRISON INC |
| 1024 R St City of Sacramento · APN 009-0073-004-0000 | Plan revision / deferred submittal COM-1917256Portal ↗ | Applied Sep 9, 2019 | Complete | — 26 units | EPC -REVISION COM-1620463 TO REVISE STOREFRONT TO A NANAWALL SYSTEM. Filed as: S E HARRISON INC |
| 1818 X St City of Sacramento · APN 010-0211-020-0000 | Plan revision / deferred submittal COM-1905485Portal ↗ | Applied Mar 29, 2019 | Complete | — 41 units | EPC - Deferred to COM-1806149 for fire alarms Filed as: S E HARRISON INC |
| 1818 X St City of Sacramento · APN 010-0211-020-0000 | Plan revision / deferred submittal COM-1905414Portal ↗ | Applied Mar 28, 2019 | Complete | — 41 units | EPC - Deferred to COM-1806149 for roof trusses Filed as: S E HARRISON INC |
| 1818 X St City of Sacramento · APN 010-0211-020-0000 | Plan revision / deferred submittal COM-1904374Portal ↗ | Applied Mar 12, 2019 | Complete | — 41 units | EPC - Revision to COM-1806149 for civil changes Filed as: S E HARRISON INC |
| 8164 Alpine Ave City of Sacramento · APN 061-0091-023-0000 | Plan revision / deferred submittal COM-1902236Portal ↗ | Applied Feb 6, 2019 | Complete | — | EPC - Revision to Com-1807869. Revised U1/10 sheet to show new location of meter and backflow. Filed as: S E HARRISON INC |
| 1818 X St City of Sacramento · APN 010-0211-020-0000 | New multifamily / condos / mixed-use COM-1806149Portal ↗ | Issued Jan 15, 2019 286d review | Certificate of Occupancy | $4,000,000 41 units | EPC - Construction of a 4-story apartment building at a 0.45± acre site. Total of 28,773 SF, 41 units residential units. 11 Parking spaces, and 2 motorcycle parking. Type VA, R2 occupancy. Deferred Fire - PLNG-INSP*******REVISION TO COM- 1806149 : (ALTERNATE MEANS TO CONSTRUCTION) POWER AND CONTROL CABLE TYPE TC-ER-JP MEETS OR EXCEEDS THE CONSTRUCTION SEPC OF TYPE NM CABLE WHICH IS THE ALLOWED WIRING METHOD THAT WILL REPLACING**** Filed as: S E HARRISON INC |
| 8164 Alpine Ave City of Sacramento · APN 061-0091-023-0000 | Plan revision / deferred submittal COM-1900525Portal ↗ | Applied Jan 10, 2019 | Complete | — | EPC - Revision to Com-1810939 to remove one shower, floor plan revision from approved, revised electrical added range and hood at break room Filed as: S E HARRISON INC |
| 1024 R St City of Sacramento · APN 009-0073-004-0000 | Plan revision / deferred submittal COM-1824189Portal ↗ | Applied Dec 21, 2018 | Complete | — 26 units | EPC - Revision to COM-1620463 to address penetrations of rated assemblies by Laundry, Kitchen and bath exhaust ducts Filed as: S E HARRISON INC |
| 8164 Alpine Ave City of Sacramento · APN 061-0091-023-0000 | Plan revision / deferred submittal COM-1820856Portal ↗ | Applied Oct 25, 2018 | Complete | — | EPC - Deferred pre-fabricated steel stairs from Com-1807869. Filed as: S E HARRISON INC |
| 8164 Alpine Ave City of Sacramento · APN 061-0091-023-0000 | Plan revision / deferred submittal COM-1818348Portal ↗ | Applied Sep 20, 2018 | Withdrawn | — | EPC - Revision to Com-1810939 delete 1 shower, rename shower space to a closet, shift breakroom wall, and reconfigure warehouse restroom fixture locations. Filed as: S E HARRISON INC |