Active in City of Sacramento (37 permits)
Raw permit filing name: VEK CONSTRUCTION INCORPORATED
18 issued · 19 parcels
vs 0 prior 24m
24 construction/remodel
Sum of permit job values
Application → issuance
Latest: Feb 2, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 22 | 17 | 22 | $4,912,395 | 99d (n=17) | 45d (85d p75) | Above 75th pct turnaround | |
| 12 | 0 | — | — | — | 41d (93d p75) | — | |
| 2 | 0 | — | $1,973,555 | — | 241d (334d p75) | — | |
| 1 | 1 | — | $4,000 | — | 0d (0d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
1 units · 1 affordable · $240,264 · 1 permit
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1385 Main Ave City of Sacramento · APN 215-0280-035-0000 | New commercial / non-residential building COM-2602158Portal ↗ | Applied Feb 2, 2026 | Applied | $704,435 | Shared Plans for construction of (2) new steel buildings. Building A is 5,000 SF with a bathroom. Building B is 4,950 SF. Site improvements on a 1.28 acre site. Design to be under 2022 CBC. Phase 2 items shown on plans to be submitted under future permitting. Shared plans to be under permit record COM-2602146. This permit record is for Building B. - PLNG-INSP Filed as: VEK CONSTRUCTION INCORPORATED |
| 1385 Main Ave City of Sacramento · APN 215-0280-035-0000 | New commercial / non-residential building COM-2602146Portal ↗ | Applied Feb 2, 2026 | Plan Check Wait | $1,269,120 | Shared Plans for construction of (2) new steel buildings. Building A is 5,000 SF with a bathroom. Building B is 4,950 SF. Site improvements on a 1.28 acre site. Design to be under 2022 CBC. Phase 2 items shown on plans to be submitted under future permitting. Shared plans to be under permit record COM-2602146. This permit record is for Building A and site improvements. - PLNG-INSP Filed as: VEK CONSTRUCTION INCORPORATED |
| 951 Irem Way City of Sacramento · APN 226-0420-013-0000 | New single-family home RES-1924240Portal ↗ | Issued Dec 22, 2020 375d review | Finaled | $228,238 1 units | PLAN 2/LOT 10-New 1 story single family residence. First floor: 1690, Garage: 439, Covered porch: 62. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 947 Irem Way City of Sacramento · APN 226-0420-012-0000 | New single-family home RES-1924232Portal ↗ | Issued Dec 22, 2020 375d review | Finaled | $250,865 1 units | PLAN 4/LOT 9-New 1 story single family residence. First floor: 1876, Garage: 442, Covered porch: 60. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 954 Irem Way City of Sacramento · APN 226-0420-011-0000 | New single-family home RES-1924262Portal ↗ | Issued Dec 21, 2020 374d review | Finaled | $218,258 1 units | PLAN 5/LOT 14-New 1 story single family residence. First floor: 1607, Garage: 425, Covered porch: 84. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 950 Irem Way City of Sacramento · APN 226-0420-010-0000 | New single-family home RES-1924260Portal ↗ | Issued Dec 21, 2020 374d review | Finaled | $248,133 1 units | PLAN 3/LOT 13-New 1 story single family residence. First floor: 1855, Garage: 441, Covered porch: 56. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 946 Irem Way City of Sacramento · APN 226-0420-009-0000 | New single-family home RES-1924253Portal ↗ | Issued Dec 21, 2020 374d review | Finaled | $228,238 1 units | PLAN 2/LOT 12-New 1 story single family residence. First floor: 1690, Garage: 439, Covered porch: 62. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 955 Irem Way City of Sacramento · APN 226-0420-014-0000 | New single-family home RES-1924248Portal ↗ | Issued Dec 21, 2020 374d review | Finaled | $218,258 1 units | PLAN 5/LOT 11-New 1 story single family residence. First floor: 1607, Garage: 425, Covered porch: 84. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 3207 Kinnaird Way City of Sacramento · APN 263-0323-008-0000 | Roof replacement RES-2004220Portal ↗ | Issued Mar 9, 2020 0d review | Finaled | $4,000 | R/R 50 Gal water heater like for like Located inside. Re-roof like for like 15 SQ's. Field verify roofing materials. Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1913985Portal ↗ | Applied Jul 25, 2019 | Complete | — | Revision To Mp-1720529 - Lot 14&11 variation changes Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1913982Portal ↗ | Applied Jul 25, 2019 | Complete | — | Revision To MP-1720527- Lots 11 & 14 variation changes Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1913979Portal ↗ | Applied Jul 25, 2019 | Complete | — | Revision to MP-1720530-Lot 11 & 14 variation changes Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1913977Portal ↗ | Applied Jul 25, 2019 | Complete | — | Revision to MP-1720528- change lot 11 & 14 variations Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1913973Portal ↗ | Applied Jul 25, 2019 | Complete | — | REVISION TO MP-1720525-Change lot 11 and 14 variations Filed as: VEK CONSTRUCTION INCORPORATED |
| 955 Pinedale Ave City of Sacramento · APN 226-0420-017-0000 | New single-family home RES-1903896Portal ↗ | Issued Jun 13, 2019 99d review | Finaled | $217,258 1 units | Plan Variation 5-New Single Story Single Family Residence-1st Floor: 1607, Garage: 425, Covered Porch: 84. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 951 Pinedale Ave City of Sacramento · APN 226-0420-016-0000 | New single-family home RES-1903885Portal ↗ | Issued May 28, 2019 83d review | Finaled | $227,191 1 units | Plan Variation 2-New Single Story Single Family Residence-1st Floor: 1690, Garage: 439, Covered Patio: 62. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 947 Pinedale Ave City of Sacramento · APN 226-0420-015-0000 | New single-family home RES-1903879Portal ↗ | Issued May 28, 2019 83d review | Finaled | $247,003 1 units | Variation #3 - New 1 Story Single Family Residence: 1st fl - 1855 SQFT, Garage - 441 SQFT, Porch - 56 SQFT. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 939 Pinedale Ave City of Sacramento · APN 226-0420-001-0000 | Plan revision / deferred submittal RES-1907228Portal ↗ | Applied Apr 24, 2019 | Complete | — | REVISION TO RES-1820381: Truss Calc company change. New calcs submitted. Filed as: VEK CONSTRUCTION INCORPORATED |
| 5117 Nali Ct City of Sacramento · APN 226-0420-004-0000 | New single-family home RES-1821799Portal ↗ | Issued Mar 26, 2019 137d review | Finaled | $237,641 1 units | New 1 story SFR, 1st floor 1855, garage 441. porch 56. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 939 Pinedale Ave City of Sacramento · APN 226-0420-001-0000 | New single-family home RES-1820381Portal ↗ | Issued Mar 26, 2019 158d review | Finaled | $209,067 1 units | Variation 5: House Variation 5. Single story 1607 Habitable Square feet, 425 SF attached Garage, 84 SF covered porch. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. ( RESUBMIITAL to Start CYCLE 2 - Customer made changes to previously approved cycle 1 review - FOUNDATION FOOTING DEEPENED - All ENGINEERED PLANS ATTACHED (This change is taking place to only this production permit) (SEE REVISION RES-1907228: Truss Calc company change. New calcs submitted.) Filed as: VEK CONSTRUCTION INCORPORATED |
| 5113 Nali Ct City of Sacramento · APN 226-0420-003-0000 | New single-family home RES-1820266Portal ↗ | Issued Dec 6, 2018 50d review | Finaled | $254,010 1 units | Variation 1: New 1 Story Single Family Residence: First floor 1990 SQFT, Garage 462 SQFT, Covered Porch 48SQFT. Total=1990 Habitable Square Feet. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 943 Pinedale Ave City of Sacramento · APN 226-0420-002-0000 | New single-family home RES-1820383Portal ↗ | Issued Nov 13, 2018 25d review | Finaled | $240,264 1 units | Pinegold Estates: House Variation 4. Single story 1876 Habitable Square feet, 442 SF attached Garage, 60 SF covered porch. The landscaping for this project is required to be in compliance with the city’s Water Efficient Landscape Ordinance 15.92. Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1821590Portal ↗ | Applied Nov 6, 2018 | Complete | — | SHARED PLANS-REVISION TO MP-1720529:LANDSCAPING REVISIONS ONLY - Revised Concrete Entry Walk Locations from driveway to front door; added turf areas and revised tree locations; Irrigation equipment revised; MWELO calculations were revised to include turf areas; Installation details were included for irrigation equipment and planting; Planting schedule was revised; Planting and irrication specifications are now part of the plan package (SHARED PLANS WITH RES-1821586 / RES-1821585 /RES-1821582 / RES-1821590/ RES-1821588) Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1821588Portal ↗ | Applied Nov 6, 2018 | Complete | — | SHARED PLANS-REVISION TO MP-1720525:LANDSCAPING REVISIONS ONLY - Revised Concrete Entry Walk Locations from driveway to front door; added turf areas and revised tree locations; Irrigation equipment revised; MWELO calculations were revised to include turf areas; Installation details were included for irrigation equipment and planting; Planting schedule was revised; Planting and irrication specifications are now part of the plan package SHARED PLANS WITH RES-1821586 / RES-1821585 /RES-1821582 / RES-1821590/ RES-1821588) Filed as: VEK CONSTRUCTION INCORPORATED |
| 0 Unknown City of Sacramento | Plan revision / deferred submittal RES-1821586Portal ↗ | Applied Nov 6, 2018 | Complete | — | SHARED PLANS-REVISION TO MP-1720527:LANDSCAPING REVISIONS ONLY - Revised Concrete Entry Walk Locations from driveway to front door; added turf areas and revised tree locations; Irrigation equipment revised; MWELO calculations were revised to include turf areas; Installation details were included for irrigation equipment and planting; Planting schedule was revised; Planting and irrigation specifications are now part of the plan package SHARED PLANS WITH RES-1821586 / RES-1821585 /RES-1821582 / RES-1821590/ RES-1821588) Filed as: VEK CONSTRUCTION INCORPORATED |