Sacramento 95823 · Valley Hi / North Laguna · APN 117-0930-001-0000 · City of Sacramento
Zoned R-2A-R in City of Sacramento with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $427,000 ($376,000–$478,000).
Zone R-2A-R allows residential use qualifying for ministerial ADU review under state law.
Source: City of Sacramento zoning · CA Gov. Code 66314
On-parcel permit history is indexed through Apr 30, 2026, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
all of the lot of the parcel intersects Zone X: minimal flood hazard. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$427,000
Benchmark range: $376,000 – $478,000
General repair (COM-2603628): Issued after 2 mo (4.6× the 14d median) — above the 75th percentile for general repair permits in City of Sacramento (median 14d, 75th pct 29d, n=1,579).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Closest lead: Ventris Place (420 ft E, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$443/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 43 homes completed; 1 commercial or mixed-use project.
43 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
344 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of R-2A as multifamily residential, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Entitled" for 5.2 yr (since Sep 7, 2021), with no new permit record in 5.2 yr. · 1 unit
In "Entitled" for 5.2 yr (since Sep 8, 2021), with no new permit record in 5.2 yr. · 1 unit
In "Entitled" for 5.2 yr (since Sep 15, 2021), with no new permit record in 5.2 yr. · 1 unit
In "Entitled" for 5.1 yr (since Sep 30, 2021), with no new permit record in 5.1 yr. · 1 unit
In "Entitled" for 5.1 yr (since Oct 15, 2021), with no new permit record in 5.1 yr. · 1 unit
In "Entitled" for 3.2 yr (since Sep 5, 2023), with no new permit record in 3.2 yr. · 37 units
Nearby hvac / heat pump (1 Songbird Ct): First appeared in published agency feed
Record RES-2623703 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (8528 Carlin Ave): First appeared in published agency feed
Record RES-2622478 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (8524 Carlin Ave): First appeared in published agency feed
Record RES-2623202 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (6250 Calvine Rd): Status changed from Plan Check Wait to Verify Wait
Record RES-2604262 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (6250 Calvine Rd): Description text was updated
Record RES-2604262 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby general repair (5 Shipman Ct): First appeared in published agency feed
Record RES-2621556 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (5977 Silver Shadow Cir): Status changed from Issued to Finaled
Record RES-2617461 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (6931 Cranleigh Ave): Status changed from Ready-to-Issue to Finaled
Record RES-2621477 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (6931 Cranleigh Ave): Issued date changed from (blank) to 2026-09-28
Record RES-2621477 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (6651 Sunset Bluffs St): Status changed from Issued to Expired Permit
Record RES-2519406 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (6712 Richlands Way): Status changed from Issued to Finaled
Record RES-2621241 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (8641 Maple Hall Dr): Status changed from Issued to Expired Permit
Record RES-2520734 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (8595 Culpepper Dr): First appeared in published agency feed
Record RES-2621509 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (10 Raindrop Ct): Status changed from Issued to Finaled
Record RES-2619003 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (8579 Brentwick Way): Status changed from Issued to Finaled
Record RES-2618111 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Entitled" for 3.2 yr (since Sep 5, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (37 housing units across 0 permits).
Issued after 2 mo (4.6× the 14d median) — above the 75th percentile for general repair permits in City of Sacramento (median 14d, 75th pct 29d, n=1,579).
Issued after 2 mo (4.6× the 14d median) — above the 75th percentile for general repair permits in City of Sacramento (median 14d, 75th pct 29d, n=1,579).
Issued after 2 mo (4.6× the 14d median) — above the 75th percentile for general repair permits in City of Sacramento (median 14d, 75th pct 29d, n=1,579).
Issued after 2 mo (4.6× the 14d median) — above the 75th percentile for general repair permits in City of Sacramento (median 14d, 75th pct 29d, n=1,579).
Issued after 2 mo (4.6× the 14d median) — above the 75th percentile for general repair permits in City of Sacramento (median 14d, 75th pct 29d, n=1,579).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 11,290 parcels
+2.3% YoY
City baseline: 30.4 / 1k
176 in trailing 24m
Includes 11 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Landon W Roberts Construction | General repair | 17 on parcel17 in ½ mi | $300,600 | 5 vs 0 prior |
| Bonney Plumbing | Remodel / interior alteration | 1 on parcel3 in ½ mi | $6,376 | 45 vs 99 prior−55% |
| Syncon Homes Of California Recent nearby: 8631 Starburst Way (Mar 17, 2026) | New single-family home |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95823
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($4,250/yr) + local voter-approved bond debt ($595/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$14,720/yr
Cash needed: $93,500
NOI: $11,069/yr
P&I: $2,149/mo
For $0/mo net cash flow
At $1,975/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,817/mo | −$1,454/mo | -18.7% | $3,846/mo | −$1,424/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,975/mo | −$1,227/mo | -15.7% | $3,560/mo | −$1,085/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,094/mo | −$1,096/mo | -14.1% | $3,477/mo | −$827/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
REPAIRS
EPC -9 SHARED PLANS- Units 233-234-235 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 232-233-234-235 Install new code compliant guardrails to the elevated decks Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS- Units 245-246-247 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 244-245-246-247 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS- Units 236-238-239 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 236-237-238-239 Install new code compliant guardrails to the elevated decks Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS- Units 248-249-250-251 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS -Units 223-224-225-227 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 223-224-225-226-227 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS- Units 228-229-230 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 228-229-230-231 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS- Units 219-220-221-222 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 219-220-221-222 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS- Units 240-241-243 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 240-241-242-243 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578
REPAIRS
EPC -9 SHARED PLANS- Units 215-216-217-218 Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Units 215-216-217-218 Install new code compliant guardrails to the elevated decks. Shared plans reviewed under COM-2603578
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
5.87 acres
Assessor's classification for assessment purposes. This is not zoning.
6251 JACINTO AVE; 6251 JACINTO AVE # 101 # 101; 6251 JACINTO AVE # 102 # 102
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 117-0930-001-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| 39 in ½ mi |
| $11,692,367 |
| 75 vs 45 prior+67% |
| Axios Homes Recent nearby: 8570 Center Pkwy (Mar 6, 2025) | New multifamily / condos / mixed-use | 10 in ½ mi | $9,171,336 | 1 vs 0 prior |
| Connected Technology Recent nearby: 14 Sedley Ct (Oct 17, 2024) | Remodel / interior alteration | 7 in ½ mi | $8,782 | 117 vs 248 prior−53% |
| Abes Aaa Plus Recent nearby: 6250 Calvine Rd (Jun 20, 2024) | Remodel / interior alteration | 4 in ½ mi | $123,858 | 1 vs 5 prior |
| Pacific Builders Recent nearby: 5932 Winterham Way (Mar 11, 2020) | Addition (adds square footage) | 4 in ½ mi | $89,659 | 12 vs 26 prior−54% |
| California Custom Sunrooms And Patio Covers Recent nearby: 6107 Dayburst Way (Sep 3, 2021) | Addition (adds square footage) | 3 in ½ mi | $73,541 | 9 vs 29 prior−69% |
| River City Patio Covers Recent nearby: 6630 Chesterbrook Dr (May 9, 2023) | Addition (adds square footage) | 3 in ½ mi | $18,860 | 10 vs 12 prior−17% |
| Eagle International Recent nearby: 11 Sedley Ct (Sep 16, 2025) | Remodel / interior alteration | 3 in ½ mi | $8,000 | 42 vs 19 prior+121% |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alteration | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvement | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Solar / battery storageOn this parcel | 3,950 | 0d | 3d | 8d | 27d | 2d |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Deck Repairs (SHARED PLANS x8)
EPC - SHARED PLANS - Remove existing elevated deck framing and replace with new pressure treated framing per engineer specifications. Install new pressure treated decking. NO CHANGE TO THE EXISTING GUARDRAILS Remove existing elevated landing lightweight concrete and substrate. Replace substrate per engineering specifications. Install new ALX weather proof coatings. NO CHANGE TO THE EXISTING GUARDRAILS, STAIRS, OR STAIR HANDRAILS. Shared plans reviewed under COM-2507110
Cell Tower Modifications
MODIFICATION OF EXISTING AT&T TELECOMMUNICATION SITE. Remove: 3 antennas, 3 RRUs, wood fencing/slats, 1 squid, 1 cabinet. Install: 6 antennas, fibergate fencing, 3 H-frames, 3 RRUs, 2 squids, 3 power trunks, 3 fiber trunks, 1 cabinet, 1 DC12, 4 rectifiers, 2 battery strings, 1 6648.
E-Permit: Sewer Service replacement or repair, Dig and Bury 10 L.F.