Retired / historical parcel number
Recorded at 1955 Railroad Dr; 1955 Railroad Dr 100; 1955 Railroad Dr 120 and 3 more · Records from 2018–2022
1957 RAILROAD DR SUITE 110- CULTIVATION
EPC -SUITE 110 Cannabis Cultivation-CO2- including new interior partitions, ceilings, mechanical, electrical, and plumbing for 8 cultivation rooms and supporting spaces (Phase 2 of overall project) - PLNG-INSP
Cannabis remodel of Suites 120 & 110
EPC - Cannabis remodel of existing suite 120 -167 SF to create new hallway , Suite 120 expanding into adjacent suite #110 for cultivation, 6437 SF, Scope include 4 grow-rooms, 1 restroom, 1 pantry and breakroom., fire equipment, mechanical, electrical and plumbing. three suites to remain and previous remodel finaled under COM-1920278 - PLNG-INSP SEE REVISION COM-2221351: EPC - Replace partial grow-light in grow-room; New AC system to replace previously proposed, remove roof units and relocate outdoor units. New HVAC system is split-system.
REVISION TO COM-2101721
EPC - REVISION TO COM-2101721- DELTA 2 REVISIONS: TO REUSE EXISTING 2000 AMP ELECTRICAL PANEL UNTIL NEW 4000 AMP PANEL IS INSTALLED UNDER A SEPARATE PERMIT
Electrical Service Upgrade
EPC - Upgrade the existing SMUD service from 2000A to 4000A for the Building. SEE REVISION COM-2210089 : Abandon house meter section in new gear and in install smaller 100A meter socket.
Cannabis - Racking (Suite C)
EPC - CANNABIS (Suite C) - New 2 level racks with electrical update at nursery room.
SUITE C cannabis co2 installation
EPC - SUITE C cannabis -Install new CO2 system to provide CO2 for cultivation and exhaust excess CO2 from cultivation rooms. Add electrical power for new Co2 equipment.. remodel permit under COM-1920278
1957 RAILROAD DRIVE - PHASE 1- CANNABIS CULTIVATION FACILITY
EPC - COMMERICAL REMODEL TO REPLACE EXPIRED PHASE 1 PERMIT COM-1900526- FOR A NEW 10,359 SQ FT CANNABIS CULTIVATION FACILITY INCLUDING NEW INTERIOR PARTITIONS, CEILINGS, MECHANICAL, ELECTRICAL, AND PLUMBING FOR 2 CULTIVATION ROOMS & SUPPORTING SPACES. - PLNG-INSP ******EPC - SEE REVISION COM-2123192- DELTA 2 REVISIONS: TO REUSE EXISTING 2000 AMP ELECTRICAL PANEL UNTIL NEW 4000 AMP PANEL IS INSTALLED UNDER A SEPARATE PERMIT*****
cannabis REMODEL 130
EPC - CANNABIS REMODEL - SUITE 130 SUITE WILL BE USED FOR CANNABIS PROCESSING, WHICH IS A SUBSET OF THE CULTIVATION LICENSE. SCOPE OF WORK IS LIMITED TO ODOR MITIGATION, SECURITY UPGRADES REQUIRED FOR LICENSING, AND UPGRADES TO EXTERIOR DOORS REQUIRED FOR EXITING AND NEW SECURITY MEASURES. - PLNG-INSP
Fire Alarm System
EPC - Replace existing fire alarm system like for like to accommodate cellular communication; New fire alarm panel; (1) new smoke detector above FACP;(1) manual pull station; Reconnect and change resistors on all fire sprinkler monitoring contacts
cannabis remodel suite a
EPC - remodel existing 14080 sq ft warehouse to cannabis cultivation SUITE A - REMODEL TO INCLUDE mechanical, electrical, plumbing, reconfigure the interior layout, fire protection, finishes, 7 new grow-rooms, a nursery room, a dry room, and 2 new ADA restrooms. - PLNG-INSP
1957 RAILROAD DRIVE - CANNABIS CULTIVATION
EPC - COMMERICAL REMODEL - FOR A NEW 10,359 SQ FT CANNABIS CULTIVATION FACILITY INCLUDING NEW INTERIOR PARTITIONS, CEILINGS, MECHANICAL, ELECTRICAL, AND PLUMBING FOR 2 CULTIVATION ROOMS & SUPPORTING SPACES.
SUITE D PANEL
EPC - Install new conduit feeder and electrical panel to re-energize suite D.
CANNABIS: Railroad Drive CC
CANNABIS EPC - Remove CO2 piping and system for COM-1920278
CANNABIS: Railroad Drive CC - Mech/Elec Revisions
CANNABIS EPC - Mechanical and electrical revisions per narrative for COM-1920278
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN as recorded on the permit) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · The city publishes current status without a date, so status changes are dated by the window between our snapshots.
APN 274-0190-044-0000 · 17 permits matched by address and location
APN 274-0190-045-0000 · 9 permits matched by address and location
Matched by checking which current parcel holds each permit's mapped point, or carries its street address. This is our inference, not an official County lineage record.
Source: Sacramento County GIS, Parcels · Geography: current parcel polygons · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Search by parcel number 274-0190-016-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
County systems may not return results for a retired number. If so, use a current parcel listed above. Most recent record here: May 13, 2022.
CANNABIS: Railroad Drive CC
CANNABIS EPC - 9541 sf remodel of Type-VB sprinklered warehouse building for Cannabis Facility. Scope includes (n) interior partitions, doors, lighting and HVAC for 7 cultivation rooms. Cultivation rooms contain CO2 enrichment. - PLNG-INSP
EPC Submittal - Remodel of Commercial Building - Commercial remodel for Cannabis facility including (n) interior partitions, doors, lighting and HVAC for 7 cultivation rooms. Cultivation rooms contain C02 enrichment.
CANNABIS: Revision to COM-1900526
EPC Submittal - Deferred/Revision to Issued Permit COM-1900526 - Revised storage area, relocated secure lobby, revised doors to loading area.
EPC Submittal - Deferred/Revision to Issued Permit COM-1900526 - Revised storage area, relocated secure lobby.
REVISION TO COM-1818104
EXPEDITED - REVISION TO COM-1818104: Revised one line and MSB.
SUITE 110 / CANNABIS Cultivation RAILROAD
EXPEDITED - SUITE 110 / EPC - expedited 10,5,5,--convert existing 2573 sq ft of warehouse space to cannabis cultivation and delivery. Remodel to include new walls, ceilings, lighting, mechanical, electrical, plumbing, finishes, fire protection, accessibility upgrade and parking lot striping. NO CO2 IS PROPOSED. - PLNG-INSP (SEE REVISION COM-1908746: Revised storage area, relocated secure lobby, revised doors to loading area.)
Cultivation
EPC - Change of use of an existing warehouse to a cannabis cultivation facility for non-separated mixed use occupancy. Including new walls, ceilings, lighting, hvac for the use of cultivation, drying, storage, and office area. The area of remodel is 32,488.5 sq. ft.
Cultivation
Cannabis- Remodel/Change of use of an existing warehouse to Cannabis cultivation, storage and delivery. Including new walls, ceilings, lighting, hvac for the use of cultivation, drying, storage, and office area. The area of remodel is 32,488.5 sq. ft.
2" Backflow Device
EXPEDITED - Add 2" backflow device to existing meter, on site work only.
Cultivation
Tenant Improvement of an existing warehouse for non-separated mixed use occupancy. Including new walls, ceilings, lighting, hvac for the use of cultivation, drying, storage, and office area. The area of remodel is 32,488.5 sq. ft.
Upgrade Electric Service (SHARED PLANS COM-1818104)
Replace existing 120/208V transformer & underground utility service with new, pad mounted, 277/480V utility transformers. Provide one new 2000A NEMA 3R 277/480V service entrance board. SHARED PLANS COM-1818104
Upgrade Electric Service (SHARED PLANS COM-1818110)
Replace existing 120/208V transformer & underground utility service with new, pad mounted, 277/480V utility transformers. Provide one new 2000A NEMA 3R 277/480V service entrance board. SHARED PLANS COM-1818110 SEE REVISION COM-1907312: Revised one line and MSB.