Sacramento 95815 · American River Parkway · APN 274-0190-045-0000 · City of Sacramento
Zoned M-T-PC in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $364,000 ($320,000–$408,000).
On-parcel permit history is indexed through Sep 28, 2026, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Commercial tenant improvement (COM-2317043): Issued after 10 mo (4.6× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$364,000
Benchmark range: $320,000 – $408,000
Closest lead: New home (0.35 mi N, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$383/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 3 homes completed, 1 permitted, 19 proposed or in review.
6 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
95 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of M-T as industrial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Entitled" for 4.4 yr (since Jun 28, 2022), with no new permit record in 4.4 yr. · 1 unit
In "Fee estimate" for 6 mo (since May 4, 2026), with no new permit record in 6 mo. · 18 units · $2,940,130 declared valuation
In "Applied" for 6 mo (since May 14, 2026), with no new permit record in 6 mo. · 1 unit · $206,927 declared valuation
Nearby roof replacement (161 Globe Ave): First appeared in published agency feed
Record RES-2622396 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (132 Globe Ave): Status changed from Issued to Finaled
Record RES-2620498 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (324 Jefferson Ave): Status changed from Issued to Finaled
Record RES-2602618 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (310 Commerce Cir): First appeared in published agency feed
Record COM-2621602 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (500 Jefferson Ave): Status changed from Issued to Finaled
Record RES-2612418 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (791 Del Paso Blvd): Status changed from Issued to Finaled
Record RES-2620066 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1124 Del Paso Blvd): Status changed from Issued to Finaled
Record COM-2500586 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Commercial tenant improvement (COM-2621561): First appeared in published agency feed
Detected between upstream data snapshots
Conversion 2,334 sqft. of warehouse to cannabis cultivation at existing cannabis facility. Scope to provide flower rooms, non-structural, non rated full height wall partition and existing restrooms.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff window
Latest published Zillow Home Value Index (ZHVI) update
Changed from $354,204 in September 2025 to $348,970 in September 2026.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95815 (not a parcel appraisal)
Commercial tenant improvement permit application filed (COM-2621561)
1955 RAILROAD DR - SUITE 110 - REMODEL
Conversion 2,334 sqft. of warehouse to cannabis cultivation at existing cannabis facility. Scope to provide flower rooms, non-structural, non rated full height wall partition and existing restrooms. · Declared valuation: $75,000
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
341 Jefferson Ave · 1 unit · $206,927 valuation
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
504 Jefferson Ave · 1 unit · $95,000 valuation
Records span Jan 22, 2026 to May 5, 2026 (1 permit).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
260 Harding Ave · 18 units · $2,940,130 valuation
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Plan revision / deferred submittal permit application filed (COM-2524104)
REVISION TO COM-2317043
EPC - REVISION TO COM-2317043: Revision to electrical distribution and feeders.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
Annual ZIP 95815 home-value index checkpoint
Changed from $364,821 in September 2024 to $354,204 in September 2025.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95815 (not a parcel appraisal)
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →Issued after 10 mo (4.6× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Issued after 10 mo (4.9× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Issued after 7 mo (3.3× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
In "Entitled" for 4.4 yr (since Jun 28, 2022), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
In "Applied" for 6 mo (since May 14, 2026), exceeding the 45d median and 85d 75th percentile for new single-family home permits in City of Sacramento (n=3,657).
High-impact scale (18 housing units, $2,940,130 declared valuation across 1 permit).
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| General Electrician And Contractor Merged: GENERAL ELECTRICIAN AND CONTRACTOR INC · GENERAL ELECTRICIAN AND CONTRACTOR INC. | Commercial tenant improvement | 1 on parcel14 in ½ mi | $5,387,220 | 1 vs 4 prior |
| Air And Sun | Commercial tenant improvement | 1 on parcel2 in ½ mi | $965,200 | 0 vs 0 prior |
| Choice | Commercial tenant improvement | 1 on parcel1 in ½ mi |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95815
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($3,650/yr) + local voter-approved bond debt ($511/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$11,556/yr
Cash needed: $80,300
NOI: $10,592/yr
P&I: $1,846/mo
For $0/mo net cash flow
At $1,850/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,702/mo | −$1,176/mo | -17.6% | $3,343/mo | −$1,146/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,850/mo | −$963/mo | -14.4% | $3,094/mo | −$829/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $1,961/mo | −$841/mo | -12.6% | $3,022/mo | −$588/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
1955 RAILROAD DR - SUITE 110 - REMODEL
Conversion 2,334 sqft. of warehouse to cannabis cultivation at existing cannabis facility. Scope to provide flower rooms, non-structural, non rated full height wall partition and existing restrooms.
REVISION TO COM-2317043
EPC - REVISION TO COM-2317043: Revision to electrical distribution and feeders.
REVISION TO COM-2317043
EPC - Revisions to electrical SLD and panel schedules.
REVISION TO COM-2317043
EPC - Added partition wall. (No electrical in wall. No modifications to FS).
REVISION TO COM-2208136
EPC - REVISION TO COM-2208136 update previously approved MP drawings per revised CO2 system detail. Add solenoid valve at CO2 tank and strobe light at exterior of building. ROUTE TO FIRE, PLANNING, PLUBMING, MECHANICAL
1955 Railroad Suite 100
EXPEDITED - EPC - REMODEL OF AN EXISTING ONE STORY SPACE AT EXISTING CANNABIS CULTIVATION. REMODEL TO INCLUDE NEW MECHANICAL AND ELECTRICAL. NO NEW WALLS REQUIRED. - PLNG-INSP REVISION COM-2420825 - ADDED PARTITION WALL REVISION-COM-2424562:EPC - Revisions to electrical SLD and panel schedules. REVISION COM-2524104: Revision to electrical distribution and feeders.
FIRE ALARM
EPC - Install monitor modules and control relays for global shutdown in grow room
1955 RAILROAD DR #110 - REVISION TO COM-2208136
EPC - REVISION TO COM-2208136 - Changing to different model of grow-lights, updating the mechanical design to add more units per owner request. Removing all dehumidifiers, Adding one more electrical panel to support new mechanical equipment.
Suite 120
EPC - At fire final inspection. The Fire Inspector ask us to add another horn/strobe and a manual pull station to the existing fire alarm system
Suite 100
EPC - CO2 enrichment system installation at existing facility
suite 110 - cannabis cultivation
EPC - SUITE 110 - Remodel of 9369 SF warehouse for cannabis cultivation. Includes 5 grow rooms, 2 restroom, 1 office and breakroom **SEE COM-2321228 revision for change to different model of grow-lights, updating the mechanical design to add more units per owner request. Removing all dehumidifiers, Adding one more electrical panel to support new mechanical equipment. EPC - REVISION COM-2416911 update previously approved MP drawings per revised CO2 system detail. Add solenoid valve at CO2 tank and strobe light at exterior of building.
REVISION TO COM-2118123
EPC - REVISION TO COM-2118123: Replace partial grow-light in grow-room; New AC system to replace previously proposed, remove roof units and relocate outdoor units. New HVAC system is split-system.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
2.37 acres
Assessor's classification for assessment purposes. This is not zoning.
1955 RAILROAD DR; 1955 RAILROAD DR STE 100 STE 100; 1955 RAILROAD DR STE 110 STE 110
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 274-0190-045-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| $325,000 |
| 0 vs 0 prior |
| Performance Integration | Fire alarm / sprinkler | 1 on parcel1 in ½ mi | $6,995 | 0 vs 0 prior |
| Integrated Fire | Commercial tenant improvement | 1 on parcel1 in ½ mi | $3,270 | 0 vs 0 prior |
| Absolut Electric Recent nearby: 1957 Railroad Dr (Sep 16, 2021) | Remodel / interior alteration | 5 in ½ mi | $1,108,500 | 0 vs 0 prior |
| Loder Construction Recent nearby: 2080 Railroad Dr (Sep 4, 2019) | Commercial tenant improvement | 4 in ½ mi | $7,125,533 | 0 vs 0 prior |
| Ap Thomas Construction Recent nearby: 1031 Del Paso Blvd (Feb 6, 2017) | Commercial tenant improvement | 4 in ½ mi | $813,750 | 0 vs 3 prior |
| Nolen Construction Recent nearby: 1957 Railroad Dr 110 (Nov 14, 2022) | Commercial tenant improvement | 3 in ½ mi | $1,336,090 | 0 vs 1 prior |
| Ref And Sons Recent nearby: 925 Del Paso Blvd 500 (May 24, 2018) | Commercial tenant improvement | 2 in ½ mi | $165,963 | 0 vs 0 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alteration | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Fire alarm / sprinklerOn this parcel | 2,312 | 8d | 14d | 29d | 71d | 13d(vs 15d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.