Active in City of Sacramento (92 permits)
Raw permit filing name: A P THOMAS CONSTRUCTION INC
59 issued · 35 parcels
vs 4 prior 24m
58 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jul 9, 2024
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 39 | 35 | — | $22,029,336 | 51d (n=34) | 63d (119d p75) | Faster than peer median | |
| 26 | 0 | — | $4,599,540 | — | 41d (93d p75) | — | |
| 14 | 13 | — | $2,707,726 | 14d (n=13) | 4d (21d p75) | Within typical range | |
| 3 | 3 | — | $1,710,896 | 112d (n=3) | 42d (83d p75) | Above 75th pct turnaround | |
| 2 | 2 | — | $1,101,000 | — | 0d (0d p75) | — | |
| 2 | 1 | — | $25,933 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $939,020 | — | 69d (132d p75) | — | |
| 1 | 1 | — | $1,270,000 | — | 1d (7d p75) | — | |
| 1 | 0 | — | $243,855 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $76,000 | — | 14d (29d p75) | — | |
| 1 | 1 | — | $15,000 | — | 14d (29d p75) | — | |
| 1 | 1 | — | $31,740 | — | 33d (85d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1012 K St City of Sacramento · APN 006-0104-002-0000 | Commercial tenant improvement COM-2409215Portal ↗ | Issued Jul 9, 2024 71d review | Finaled | $80,000 | EPC - Repair of existing steam room within a fitness facility Filed as: A P THOMAS CONSTRUCTION INC |
| 414 K St 150 City of Sacramento · APN 006-0370-048-0000 | Commercial tenant improvement COM-2303618Portal ↗ | Issued Sep 22, 2023 211d review | Withdrawn | $10,000 | EPC - Permit for CO2 system over 100lbs per Sacramento Fire. Exterior change is a CO2 filler box with metal door that will be located within new storefront. TI done under COM-2201127. Filed as: A P THOMAS CONSTRUCTION INC |
| 1671 Alhambra Blvd City of Sacramento · APN 007-0353-005-0000 | General repair COM-2314361Portal ↗ | Issued Sep 21, 2023 71d review | Finaled | $15,000 | EPC - Repairs damage to 12 interior structural columns within the pool area. *SEE REVISION COM-2325174: Updated plans to repair damage to twelve (12) interior structural columns within the pool area. Revised new strengthening details from channel to plate.* Filed as: A P THOMAS CONSTRUCTION INC |
| 600 Q St City of Sacramento · APN 006-0262-016-0000 | Commercial tenant improvement COM-2310500Portal ↗ | Issued Jul 18, 2023 55d review | Finaled | $20,000 | EPC - REMODEL STE 100- DEMO FLOORING, LIGHTING, PORTIONS OF WALL & CEILINGS, FURNITURE SYSTEMS. INSTALL NEW FLOORING, LIGHTING, ACOUSTIC CEILING SYSTEM, SYSTEMS FURNITURE, PAINT, WALLS, DOORS, GYP CEILING. Filed as: A P THOMAS CONSTRUCTION INC |
| 414 K St 150 City of Sacramento · APN 006-0370-048-0000 | Commercial tenant improvement COM-2201127Portal ↗ | Issued Jul 28, 2022 195d review | Certificate of Occupancy | $1,200,000 | EXPEDITED - EPC - EXPEDITE- New Restaurant Tenant Improvement within existing shell (4,920 SF - RESTAURANT AREA; 545 SF - SMALL PATIO AREA; 2,677 SF - LARGE PATIO AREA; 8,142 SF - TOTAL AREA). Originally permitted and built as a restaurant space. Area originally approved and entitled for outdoor dining in the specific areas we are showing(lease boundaries). - PLNG-INSP Filed as: A P THOMAS CONSTRUCTION INC |
| 1610 R St 145 City of Sacramento · APN 009-0093-008-0000 | Commercial tenant improvement FPP-2202148Portal ↗ | Issued Mar 17, 2022 48d review | Finaled | $65,000 | EPC - Suite #145 - Expansion of existing Device Brewing into adjacent vacant space for additional open seating and sales area for merchandise. Provide new 6'-9" opening in existing non-structural demising wall to adjacent space. Work to include building, mechanical, electrical and fire. No work to exterior of building. Filed as: A P THOMAS CONSTRUCTION INC |
| 1610 R St 115 City of Sacramento · APN 009-0093-008-0000 | Commercial tenant improvement FPP-2126552Portal ↗ | Issued Dec 17, 2021 0d review | Certificate of Occupancy | $18,068 | PERMIT TO OBTAIN FINAL INSPECTIONS ONLY ON EXPIRED RECORD FPP-1822604:EXPEDITED - EPC - Suite 115, 1st Time Occupancy of Commercial Building - New tenant improvement to include walls, finishes, mechanical, electrical, plumbing, fire alarm, and fire sprinkler. This facility will not be making any food onsite, therefore no grease will be introduced into the sewer system Filed as: A P THOMAS CONSTRUCTION INC |
| 2025 19th St City of Sacramento · APN 010-0093-029-0000 | Fire alarm / sprinkler COM-2121438Portal ↗ | Issued Oct 20, 2021 16d review | Finaled | $76,000 | Expedited. EPC - Fire Alarm for Lionakis HQ Remodel (issued main permit #COM-2016198). Fire alarm system consisting of fire alarm control panel with internal dialer, installation of cellular communicator, remote power supply for notification appliances. Installing notification appliances throughout. Installation of a manual pull station and document box at FACP. Installation of remote annunciator at front entry. Installation of duct detectors and relay modules at the rooftop units. Installation of monitor modules for remote power supply, waterflow switches, and tamper switches. Installing relay for circulation fan shutdown Filed as: A P THOMAS CONSTRUCTION INC |
| 2025 19th St City of Sacramento · APN 010-0093-029-0000 | Electrical / panel COM-2114320Portal ↗ | Issued Jul 7, 2021 6d review | Finaled | $1,000 | EPC - Temporary power permit. Filed as: A P THOMAS CONSTRUCTION INC |
| 2025 19th St City of Sacramento · APN 010-0093-029-0000 | Commercial tenant improvement COM-2016198Portal ↗ | Issued Feb 24, 2021 169d review | Finaled | $6,100,000 | EPC - Exterior renovations and an interior tenant improvement to an existing building and portions of the existing site. The existing building is approximately ±39, 980 SF. Type VB; Occ. B. Application for interior demo under COM-2015046 to be withdrawn as scope will be included in this permit.- PLNG-INSP Filed as: A P THOMAS CONSTRUCTION INC |
| 1 Capitol Mall City of Sacramento · APN 006-0136-022-0000 | Remodel / interior alteration COM-1911299Portal ↗ | Issued Oct 23, 2020 492d review | Finaled | $250,000 | EPC - Voluntary structural upgrades to include Fiber Wrap of 5 existing concrete columns. remove existing precast skin of building to gain access to columns for upgrades. Reinstall new metal stud framing and sheathing to infill locations where precast panels are removed. Install new granite tile on exterior to match existing granite on the precast. Filed as: A P THOMAS CONSTRUCTION INC |
| 1900 T St City of Sacramento · APN 010-0093-029-0000 | Remodel / interior alteration COM-2015046Portal ↗ | Applied Aug 21, 2020 | Withdrawn | $150,000 | EPC - Complete interior demolition of the building shown in preparation for a renovation project (+/- 39,980 SF) including but not limited to non load-bearing wall assemblies, suspended & framed ceiling assemblies, finishes, and MEP ducting & piping systems. Any/all structural building framing shall remain as-is. Future demolition work related to any exterior assemblies or systems shall be included under a separate submittal which will include anticipated remodel work Filed as: A P THOMAS CONSTRUCTION INC |
| 1 Capitol Mall City of Sacramento · APN 006-0136-022-0000 | Commercial tenant improvement COM-2001691Portal ↗ | Issued Aug 11, 2020 193d review | Finaled | $650,000 | EPC - Remodel of Commercial Building - Voluntary structural upgrades to include fiberwrap of interior columns and installation of new structural braces. Removal of precast panels from building exterior to gain access for structural work and then reinstallation/replacement in kind of precast panels. Removal and replacement of interior non-bearing walls to gain access to columns for upgrades. Filed as: A P THOMAS CONSTRUCTION INC |
| 1201 J St City of Sacramento · APN 006-0052-019-0000 | Plan revision / deferred submittal COM-2007425Portal ↗ | Applied May 5, 2020 | Void | — | VOID Filed as: A P THOMAS CONSTRUCTION INC |
| 500 J St 130 City of Sacramento · APN 006-0370-029-0000 | Commercial tenant improvement COM-1923672Portal ↗ | Issued May 5, 2020 151d review | Finaled | $424,500 | EPC - Suite 130, 1st Time Occupancy of Commercial Building - Tenant improvement of a vacant shell space into an aesthetics studio. Filed as: A P THOMAS CONSTRUCTION INC |
| 2930 Freeport Blvd City of Sacramento · APN 012-0142-019-0000 | Plan revision / deferred submittal COM-2007156Portal ↗ | Applied Apr 30, 2020 | Complete | — | EPC - REVISION TO COM-2003754: WALL LAYOUT WITHIN THE BREAK ROOM TO CREATE (1) LARGE AREA TO INCLUDE M-P-E-B CHANGES. Filed as: A P THOMAS CONSTRUCTION INC |
| 2930 Freeport Blvd City of Sacramento · APN 012-0142-019-0000 | Commercial tenant improvement COM-2003754Portal ↗ | Issued Apr 9, 2020 37d review | Certificate of Occupancy | $109,248 | EPC - SUITE A***1,556 square foot tenant improvement of existing warm shell into pharmacy to include new partitions, finishes, lighting, and power, reuse of existing HVAC unit with new distribution, reuse of existing plumbing with new sinks, and reuse of existing restroom.****EPC - REVISION TO COM-2003754: WALL LAYOUT WITHIN THE BREAK ROOM TO CREATE (1) LARGE AREA TO INCLUDE M-P-E-B CHANGES.**** Filed as: A P THOMAS CONSTRUCTION INC |
| 1201 J St City of Sacramento · APN 006-0052-019-0000 | Plan revision / deferred submittal COM-2005301Portal ↗ | Applied Mar 27, 2020 | Complete | — | EPC - REVISION TO COM-1910678. Various mechanical, and fire protection revisions. CYC2 submittal removed fire alarm and electrical from this plan revision activity. Filed as: A P THOMAS CONSTRUCTION INC |
| 8351 Rovana Cir City of Sacramento · APN 064-0010-065-0000 | Plan revision / deferred submittal COM-2004396Portal ↗ | Applied Mar 11, 2020 | Complete | — | EXPEDITED - REVISION TO COM-1909168-re-locate sprinkler main supply Filed as: A P THOMAS CONSTRUCTION INC |
| 1201 J St City of Sacramento · APN 006-0052-019-0000 | Plan revision / deferred submittal COM-2003199Portal ↗ | Applied Feb 24, 2020 | Complete | — | EPC - REVISION TO COM-1910678. Design for soffit / lid above Lobby Cafe 101 has been revised. Structural engineer notes transcribed onto architectural drawings. Revision to a2.15b; 6, 7, 8, 9/a7.11; 10/a8.04. Filed as: A P THOMAS CONSTRUCTION INC |
| 1201 J St City of Sacramento · APN 006-0052-019-0000 | Commercial tenant improvement COM-2000583Portal ↗ | Applied Jan 13, 2020 | Complete | — | EPC - REVISION TO COM-1910678. Based on existing site conditions, level 1, level 2, and level 3 restroom layouts need to be modified. The same number of fixtures - WC's, urinals, and lavatories - will be maintained, but the configuration will change somewhat. Revision to 4/a.702; 6/a7.02; 1/a7.03; and corresponding elevations. Filed as: A P THOMAS CONSTRUCTION INC |
| 7919 Folsom Blvd City of Sacramento · APN 079-0200-060-0000 | Commercial tenant improvement COM-1925176Portal ↗ | Issued Jan 2, 2020 10d review | Withdrawn | $99,050 | TO COMPLETE WORK TO EXPIRED COM-1720126 - Interior remodel new stair from 2nd to 3rd floor with associated electrical and fire sprinkler. Filed as: A P THOMAS CONSTRUCTION INC |
| 875 University Ave City of Sacramento · APN 295-0030-020-0007 | Commercial tenant improvement COM-1919286Portal ↗ | Issued Dec 9, 2019 63d review | Finaled | $162,693 | EPC Submittal - Remodel of an existing office space including restroom and break room renovations. Demo portion of existing soffit, demo interior walls, accessibility upgrades, new casework & finishes. Minor adjustments to existing electrical, plumbing & mechanical systems. Filed as: A P THOMAS CONSTRUCTION INC |
| 500 J St 130 City of Sacramento · APN 006-0370-029-0000 | Plan revision / deferred submittal SUB-1923608Portal ↗ | Applied Dec 5, 2019 | Abandoned | $424,500 | Suite 130, 1st Time Occupancy of Commercial Building - Tenant improvement of a vacant shell space into an aesthetics studio. Filed as: A P THOMAS CONSTRUCTION INC |
| 875 University Ave City of Sacramento · APN 295-0030-020-0007 | Plan revision / deferred submittal SUB-1919242Portal ↗ | Applied Oct 7, 2019 | Abandoned | $162,693 | EPC Submittal - Remodel of Commercial Building - Remodel of an existing office space including restroom and break room renovations. Filed as: A P THOMAS CONSTRUCTION INC |