Sacramento 95815 · Old North Sacramento · APN 277-0081-001-0000 · City of Sacramento
Zoned RMX in City of Sacramento with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $373,000 ($328,000–$418,000).
Zone RMX allows residential use qualifying for ministerial ADU review under state law (5 ADU permits permitted within ¼ mile in 36 months).
Source: City of Sacramento zoning · CA Gov. Code 66314
Public building records show issued construction/renovation work on this parcel (50 total permits, latest Sep 9, 2025).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
about 56% of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$373,000
Benchmark range: $328,000 – $418,000
Commercial tenant improvement (COM-1824443): Issued after 2 yr (11.8× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Closest lead: Darina Apartments (0.35 mi W, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$392/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 6 homes completed, 11 permitted, 11 proposed or in review; 2 commercial or mixed-use projects.
18 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
283 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of RMX as mixed use, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 9.5 yr (since May 9, 2017), with no new permit record in 9.5 yr. · 2 units · $200,000 declared valuation
In "Fee estimate" for 9.2 yr (since Aug 14, 2017), with no new permit record in 9.2 yr. · $21,439,420 declared valuation
In "Entitled" for 7.1 yr (since Oct 8, 2019), with no new permit record in 5.9 yr. · 14 units · $1,500,000 declared valuation
In "Entitled" for 5.4 yr (since Jun 15, 2021), with no new permit record in 5.4 yr. · 2 units
In "Entitled" for 5.3 yr (since Aug 13, 2021), with no new permit record in 5.3 yr. · 1 unit
In "Entitled" for 5.2 yr (since Aug 30, 2021), with no new permit record in 5.2 yr. · 1 unit
Nearby permit (86457a761aea4f82ba29c9575bd83c613ae1aa04): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (78fda7e92ad7594510f5796fea1ed91fa97d3a01): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (84fa2a98045bd964b9f39f55a036b0e3aa90e810): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby electrical / panel (2560 Selma St): Status changed from Issued to Finaled
Record RES-2620704 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (2440 Beaumont St): Status changed from Issued to Finaled
Record RES-2618901 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (2455 Ben Ali Way): First appeared in published agency feed
Record RES-2621911 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (2021 Del Paso Blvd): Status changed from Issued to Expired Permit
Record COM-2521400 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby electrical / panel (1026 Macarlen Way): First appeared in published agency feed
Record RES-2623600 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (1109 Frienza Ave): Status changed from Issued to Expired Permit
Record RES-2522254 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Record RES-2405528 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (2512 Rio Linda Blvd): Status changed from Issued to Finaled
Record COM-2620058 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (2021 Del Paso Blvd 100): Status changed from Plan Check Target to Verify Wait
Record COM-2620638 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (2387 Erickson St): First appeared in published agency feed
Record RES-2621694 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (2150 Harvard St): Status changed from Plan Check Target to Plan Check Wait
Record COM-2620426 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby pool / spa (2453 Empress St): Status changed from Ready-to-Issue to Issued
Record RES-2621300 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Entitled" for 7.1 yr (since Oct 8, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (14 housing units, $1,500,000 declared valuation across 1 permit).
In "Fee estimate" for 5 yr (since Oct 29, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (300 housing units, $75,000,000 declared valuation across 1 permit).
In "Fee estimate" for 9.2 yr (since Aug 14, 2017), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($21,439,420 declared valuation across 3 permits).
In "In review" for 21 mo (since Jan 31, 2025), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (8 housing units, $374,500 declared valuation across 2 permits).
Issued after 2 yr (11.8× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Issued after 8 mo (4.0× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 1,263 parcels
−8.3% YoY
City baseline: 30.4 / 1k
23 in trailing 24m
Includes 11 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Read Construction | Commercial tenant improvement | 30 on parcel32 in ½ mi | $2,008,500 | 0 vs 0 prior |
| Hall Enterprises | Roof replacement | 11 on parcel11 in ½ mi | $85,800 | 0 vs 0 prior |
| Phe | EV charger | 1 on parcel1 in ½ mi | $115,482 | 1 vs 52 prior |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95815
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($3,750/yr) + local voter-approved bond debt ($525/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$12,277/yr
Cash needed: $82,500
NOI: $10,478/yr
P&I: $1,896/mo
For $0/mo net cash flow
At $1,850/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,702/mo | −$1,236/mo | -18.0% | $3,427/mo | −$1,207/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,850/mo | −$1,023/mo | -14.9% | $3,172/mo | −$890/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $1,961/mo | −$901/mo | -13.1% | $3,098/mo | −$648/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
1048 Dixieanne Ave FOR UNITS 15-16-com dry rot repair permit minor
Dry Rot Repair Permit: Repair (2) 4x4 dry rot damaged wood posts at exterior walk way deck. Posts to be removed and replaced with pressure treated material. Posts are able to slide into existing brackets and post base without modification. Work to be done at Units 15-18.
EPC - EV Chargers
EPC - EV Chargers- Installation of 5 EV charging stations
1048 Dixieanne Ave. SIGN (MUTUAL HOUSING AT DIXIEANNE)
Install one (1) detached non-illuminated monument sign.
Dixieanne Apartments Remodel - Bldg 3
EPC - SHARED PLANS - Bldg 3 (units 47-50): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
7.71kw PV Solar
EPC - 7.71kw Solar PV System, and 0gal Solar WH System (water heater installed null).
Shared Plans (14) Replace Stairs
Shared Plans (14), Bldg 13 / Unit 7-8, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs
Shared Plans (14), Bldg 11 / Unit 15-18, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs
EPC - Shared Plans (14), Bldg 10 Unit 19-22, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs Bldg
Shared Plans (14), Bldg 8 / Unit 27-30, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs Bldg 7 / 31-34 SHARED PLANS WITH 13 OTHER APPLICATIONS
EPC - Shared Plans (14), Bldg 7 / 31-34, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs Bldg 5 / 39-42 SHARED PLANS WITH 13 OTHER APPLICATIONS
Shared Plans (14), Bldg 5 / 39-42, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs Bldg 4 / 43-46 SHARED PLANS WITH 13 OTHER APPLICATIONS
Shared Plans (14), Bldg 4 / 43-46, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs Bldg 2 / 51-54 SHARED PLANS WITH 13 OTHER APPLICATIONS
Shared Plans (14), Bldg 2 / 51-54, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans with Com-2002181 (14) Stair Replacement
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
1.90 acres
Assessor's classification for assessment purposes. This is not zoning.
1048 DIXIEANNE AVE; 1048 DIXIEANNE AVE # 10 # 10; 1048 DIXIEANNE AVE # 1 # 1
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 277-0081-001-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| Grid Alternatives | Solar / battery storage | 1 on parcel1 in ½ mi | $28,659 | 14 vs 1 prior |
| Liebig Construction | Windows / doors / siding | 1 on parcel1 in ½ mi | $28,000 | 0 vs 0 prior |
| Ew Carroll And Sons | Plumbing / water heater / sewer | 1 on parcel1 in ½ mi | $17,373 | 0 vs 0 prior |
| Illuminated Creations | Sign | 1 on parcel1 in ½ mi | $12,000 | 0 vs 0 prior |
| Mobile Certified Welders | Roof replacement | 1 on parcel1 in ½ mi | $7,800 | 0 vs 0 prior |
| Graves 7 | Plumbing / water heater / sewer | 1 on parcel1 in ½ mi | $1,850 | 0 vs 0 prior |
| Tricorp Group | General repair | 1 on parcel1 in ½ mi | $1,800 | 4 vs 2 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Solar / battery storageOn this parcel | 3,950 | 0d | 3d | 8d | 27d | 2d |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EPC - Shared Plans with Com-2002181 (14) Stair Replacement . 2 distinct configurations Stairway configuration 2 consisting of remove and replace of 2 stairways like for like . Shared Plans with Com-2002181 (14) All plan review to be completed under this activity ( total of 14 )
Shared Plans with Com-2002181 (14)
Shared Plans with Com-2002181 (14) Stair Replacement. 2 distinct configurations Stairway configuration 2 consisting of remove and replace of 2 stairways like for like . ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans with Com-2002181 (14) Stair Replacement
Shared Plans with Com-2002181 (14) Stair Replacement. 2 distinct configurations Stairway configuration 2 consisting of remove and replace of 2 stairways like for like . ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs Bldg 1 / 55-57 SHARED PLANS WITH 13 OTHER APPLICATIONS
Shared Plans (14), Bldg 1 / 55-57, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs. ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans with Com-2002181 (14) Stair Replacement
Shared Plans with Com-2002181 (14) Stair Replacement Stairway configuration 2 consisting of remove and replace of 2 stairways like for like ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Stair Replacement
EPC - Shared Plans (14) Stair Replacement . 2 distinct configurations Stairway configuration 2 consisting of remove and replace of 2 stairways like for like . ALL PLAN REVIEW TO BE COMPLETED UNDER COM-2002194- TOTAL OF 14
Shared Plans (14) Replace Stairs Bldg 2 / 51-54 SHARED PLANS WITH 13 OTHER APPLICATIONS
EXPEDITED - Shared Plans (14), Bldg 2 / 51-54, 2 Distinct Configurations. Remove existing stairways and replace with new like for like stairs.
Replace Stairs Bldg 1 / 55-57 SHARED PLANS WITH 13 OTHER APPLICATIONS
EXPEDITED - Remove existing stairways and replace with new like for like stairs.
Dixieanne Apartments Remodel - Bldg 14
EPC - SHARED PLANS - Bldg 14 (units 1-6): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units/ full kitchen and bath remodel in unit 5 for accessibility [Building Area = 4830 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 13
EPC - SHARED PLANS - Bldg 13 (units 7, 8): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units/ full kitchen and bath remodel in unit 7 for accessibility [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 12
EPC - SHARED PLANS - Bldg 12 (units 11-14): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 11
EPC - SHARED PLANS - Bldg 11 (units 15-18): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 10
EPC - SHARED PLANS - Bldg 10 (units 19-22): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 9
EPC - SHARED PLANS - Bldg 9 (units 23-26): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 8
EPC - SHARED PLANS - Bldg 8 (units 27-30): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 7
EPC - SHARED PLANS - Bldg 7 (units 31-34): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units/ full kitchen and bath remodel in unit 33 for accessibility [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 6
EPC - SHARED PLANS - Bldg 6 (units 35-38): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 5
EPC - SHARED PLANS - Bldg 5 (units 39-42): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units/ full kitchen and bath remodel in unit 41 for accessibility [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 4
EPC - SHARED PLANS - Bldg 4 (units 43-46): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 2
EPC - SHARED PLANS - Bldg 2 (units 51-54): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units/ full kitchen and bath remodel in unit 53 for accessibility [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422
Dixieanne Apartments Remodel - Bldg 1
EPC - SHARED PLANS {14 Buildings} - Bldg 1 (units 55-57): Replace hvac units, water heaters, plumbing fixtures, interior light fixtures for all units/ full kitchen and bath remodel in unit 55 for accessibility/ Site improvements: Enlarge trash enclosure/ partial paving replacement for accessibility/ replace landscape [Building Area = 3220 sf] ALL REVIEWS UNDER COM-1824422 FOR COM-18244(28)/(43)/(44)/(45)/(46)/(47)/(48)/(49)/(50)/(51)/(52)/(53)/(54)
EPC Submittal - Remodel of Commercial Building - Replace HVAC units, water heaters, plumbing fixtures, interior light fixtures for all units. Full kitchen and bath remodel for disabled accessibility in 6 units. Enlarge trash enclosure, partial paving replacement for disabled accessibility; enhance landscaping.
Change-out installation of Gas - 050 gallon to Gas - 050 gallon, located outside building, within Existing Exterior Enclosure.
Sewer Line Replacement
Sewer Main: Replacing 200 Feet of 6" Sewer Main line via TRENCHLESS technology under driveway of property. NO work being done in public right away.
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0890-0005
EVERGREEN HOUSING ASSOCIATES bldg 10
Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater. New Gutters
EVERGREEN HOUSING ASSOCIATES BLDG 6
Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater. New gutters
EVERGREEN HOUSING ASSOCIATES BLDG
Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater. new gutters, felt, and shingles
1048 Dixieanne Ave BLDG 5
Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.
BLDG 7/8 STUCCO REPAIR/WINDOWS
BLDG 7/8 REMOVE AND REPLACE STUCCO/DRYWALL TO MATCH EXISTING AT ENDS OF THE BUILDINGS. RETROFIT WINDOWS AT BUILDING ENDS TO MATCH EXISTING WITH NO LITES OR GRIDS.