Active in City of Sacramento (35 permits)
Raw permit filing name: ADAIR GENERAL CONSTRUCTION
34 issued · 17 parcels
vs 7 prior 24m
33 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 15, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 31 | 30 | — | $2,385,755 | 32d (n=30) | 63d (119d p75) | Faster than peer median | |
| 2 | 2 | — | $55,971 | 11d (n=2) | 4d (21d p75) | — | |
| 1 | 1 | — | — | — | 14d (29d p75) | — | |
| 1 | 1 | — | $999 | — | 14d (29d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2379 Gateway Oaks Dr City of Sacramento · APN 274-0630-003-0000 | Commercial tenant improvement COM-2618082Portal ↗ | Issued Oct 15, 2026 58d review | Issued | $14,300 | Infill skylight on roof with decking and roofing to match existing. NOT visible from street Filed as: ADAIR GENERAL CONSTRUCTION |
| 3661 N Freeway Blvd City of Sacramento · APN 225-2110-007-0000 | Commercial tenant improvement COM-2605517Portal ↗ | Issued Apr 13, 2026 25d review | Finaled | $19,120 | EPC - Tenant remodel of #100 for new business Mathnasium. Bathroom upgrade, minor MEP upgrades. Filed as: ADAIR GENERAL CONSTRUCTION |
| 2399 Gateway Oaks Dr City of Sacramento · APN 274-0630-001-0000 | Commercial tenant improvement COM-2521396Portal ↗ | Issued Nov 19, 2025 40d review | Finaled | $223,600 | EPC - EXPEDITED - interior improvement in suite 115 for fitness amenity at Gateway Oaks. The scope of work includes a fitness area with yoga room, locker area, changing rooms and two new restrooms with showers. MEP & FS will be provided to accommodate new layout. Filed as: ADAIR GENERAL CONSTRUCTION |
| 2379 Gateway Oaks Dr 100 City of Sacramento · APN 274-0630-003-0000 | Commercial tenant improvement COM-2519421Portal ↗ | Issued Oct 14, 2025 29d review | Finaled | $184,600 | EPC - EXPEDITED - THIS PROJECT IS A TENANT IMPROVEMENT IN SUITE 100. SCOPE OF WORK INCLUDES REMOVING AND REPLACING ALL EXISTING 2'1\2' AND 2'1\4' LIGHTS WITH NEW LED FIXTURES, REMOVAL OF EXISTING CARPET TILE, BASEBOARDS AND LVT FOR NEW FINISHES, AND DEMO WORK TO EXISTING WALLS AND CEILING FOR NEW OFFICE LAYOUT MECHANICAL, ELECTRICAL AND FIRE SPRINKLERS WILL BE REVISED TO ACCOMMODATE THE NEW CONFIGURATION. Filed as: ADAIR GENERAL CONSTRUCTION |
| 2399 Gateway Oaks Dr 120 City of Sacramento · APN 274-0630-001-0000 | Commercial tenant improvement COM-2511680Portal ↗ | Issued Jul 24, 2025 49d review | Finaled | $191,462 | EPC - EXPEDITED - THIS IS A TENANT IMPROVEMENT TO EXISTING SUITE 120. THE PROJECT IS TO ADD A NEW CONFERENCE ROOM, BREAK-ROOM, AND WELLNESS ROOM ALONG WITH NEW CASEWORK WITH SINKS. SUITE 120 WILL ALSO BE EXPANDING INTO THEREFORE, NO IMPROVEMENTS IN THE SUITE WILL BE MADE UNDER THIS PERMIT. ALL LIGHT FIXTURES IN SUITE 120 WILL BE REPLACED WITH NEW LED FIXTURES. MECHANICAL AND ELECTRICAL WILL BE REVISED TO ACCOMMODATE THE NEW LAYOUT OF THE TENANT IMPROVEMENT. Filed as: ADAIR GENERAL CONSTRUCTION |
| 2399 Gateway Oaks Dr City of Sacramento · APN 274-0630-001-0000 | Commercial tenant improvement COM-2511686Portal ↗ | Issued Jul 7, 2025 32d review | Finaled | $68,513 | EPC - EXPEDITED - THIS IS A LANDLORD WORK PROJECT TO CONSTRUCT A 0-HR CORRIDOR ON THE FIRST FLOOR OF AN EXISTING TWO-STORY BUIL-DING. THE CORRIDOR WILL RUN THROUGH THE CENTER OF EXISTING VACANT SUITE 110. SUITE 110 WILL BE DIVIDED INTO TWO SUITES AS A RESULT OF THIS NEW CORRIDOR, SUITE 110 AND SUITE 120. FUTURE TENANT IMPROVEMENT OF NEW SUITES 110 AND 120 WILL BE UNDER A SEPARATE PERMIT. AN EXISTING ELECTRICAL ROOM WILL REMAIN. MINOR MODIFICATION TO THE ELECTRICAL ROOM IS TO RELOCATE THE ROOM DOOR TO THE NEW 0-HR CORRIDOR. MECHANICAL AND ELECTRICAL WILL BE REVISED TO ACCOMMODATE THE NEW 0-HR CORRIDOR. Filed as: ADAIR GENERAL CONSTRUCTION |
| 1450 Expo Pkwy City of Sacramento · APN 275-0310-021-0000 | Commercial tenant improvement COM-2507180Portal ↗ | Issued May 8, 2025 29d review | Finaled | $57,002 | EPC - EXPEDITED - MAKE 3 CUT OPENINGS BETWEEN SUITE C & D FOR SHARED TENANT SPACE. CONSTRIUCT TWO INTERIOR PARTITION WALLS AND DOOR FOR A NEW OFFICE, ADD ADDITIONAL MAN DOOR LEADING TO WAREHOUSE SPACE. Filed as: ADAIR GENERAL CONSTRUCTION |
| 2399 Gateway Oaks Dr 210 City of Sacramento · APN 274-0630-001-0000 | Commercial tenant improvement COM-2501717Portal ↗ | Issued Mar 25, 2025 57d review | Finaled | $65,466 | EPC - TENANT IMPROVEMENT OF EXISTING SUITE 210. WORK TO INCLUDE A NEW PARTITON WALL, REPLACING CASEWORK, AND MINOR MECHANICAL, PLUMBING AND ELECTRICAL WORK. Filed as: ADAIR GENERAL CONSTRUCTION |
| 3980 Research Dr City of Sacramento · APN 250-0025-048-0000 | Commercial tenant improvement COM-2420790Portal ↗ | Issued Nov 20, 2024 61d review | Finaled | $55,829 | EPC - This project is to renovate the restrooms to achieve accessibility compliance with some plumbing. (No fire sprinkler or fire alarm work needed.) Filed as: ADAIR GENERAL CONSTRUCTION |
| 191 Lathrop Way D City of Sacramento · APN 275-0300-028-0000 | Commercial tenant improvement COM-2402350Portal ↗ | Issued Apr 16, 2024 76d review | Finaled | $196,291 | EPC - EXPEDITED - TENANT IMPROVEMENT; SCOPE TO INCLUDE MECHANICAL, ELECTRICAL, PLUMBING,FIRE ALARM & FIRE SPRINKLER WORK. A large portion of the included work is accessibility improvements. Reconfiguring the restrooms, exterior concrete repairs etc. Filed as: ADAIR GENERAL CONSTRUCTION |
| 2349 Gateway Oaks Dr 210 City of Sacramento · APN 274-0630-004-0000 | Commercial tenant improvement COM-2402213Portal ↗ | Issued Mar 4, 2024 34d review | Finaled | $278,457 | EPC - EXPEDITED - remodel of suites 100,110,210 & 250. In#100 the break room will be split to become a coffee room and meeting room. In #110. the break room will be enlarged and some casework will be removed and replaced with new casework and modular furniture will be removed for new furniture or open collaboration space. Mechanical, Electrical, Plumbing and Fire work. SEE REVISION COM-2411783 REVISED SPRINKLER PLANS Filed as: ADAIR GENERAL CONSTRUCTION |
| 2379 Gateway Oaks Dr 120 City of Sacramento · APN 274-0630-003-0000 | Commercial tenant improvement COM-2402017Portal ↗ | Issued Feb 16, 2024 19d review | Finaled | $43,991 | EPC - REMOVE EXISTING CASEWORK AT THE OPEN OFFICE AND BREAK ROOM AND REPLACE THEM WITH NEW CASEWORK. MODULAR FURNITURE WILL BE REMOVED TO CREATE AN OPEN COLLABORATION WORKSPACE. A NEW PASS-THROUGH OPENING WILL BE MADE BETWEEN AN EXISITNG SUPPLY ROOM AND STORGE. CEILING MODIFICATION. PLUMBING & ELECTRICAL Filed as: ADAIR GENERAL CONSTRUCTION |
| 191 Lathrop Way D City of Sacramento · APN 275-0300-028-0000 | Commercial tenant improvement COM-2327454Portal ↗ | Applied Dec 28, 2023 | Estimate | $153,000 | Modify existing restrooms for ADA compliance, add another single use restroom. Install new fire alarm to accommodate I-4. Install new finishes. Filed as: ADAIR GENERAL CONSTRUCTION |
| 3800 Pell Cir City of Sacramento · APN 237-0400-010-0000 | Commercial tenant improvement COM-2324020Portal ↗ | Issued Dec 19, 2023 40d review | Finaled | $18,200 | EPC - EXPEDITED - INSTALLATION OF 4 NEW WAREHOUSE FANS. Filed as: ADAIR GENERAL CONSTRUCTION |
| 191 Lathrop Way D City of Sacramento · APN 275-0300-028-0000 | General repair COM-2321627Portal ↗ | Issued Oct 11, 2023 1d review | Finaled | $999 | NO WORK BEING PERFORMED. PERMIT TO FIELD VERIFY EXISTING 1HR DEMISING WALL BETWEEN SUITES A & D AND D & G. Filed as: ADAIR GENERAL CONSTRUCTION |
| 0 Unknown City of Sacramento | Fire alarm / sprinkler CF-2221654Portal ↗ | Issued Jan 12, 2023 93d review | Finaled | — | Tenant, exterior, and site improvements to include the following: 1. (n) tenant improvement work on interior to include demolition and new walls, ceilings for (n) offices, reception and two all-gender r.r. facilities. 2. (n) exterior work on building to include (n) facade and soffit treatment w/ plaster, (n) parapet, (n) double pane glazing to replace (3) single pane (n) highg roof structure, (n) roofing material w/ (n) mechanical curbs, and (n) associated mechanical, plumbing, electrical, fire sprinkler and Fire Alarm Work 3. (n) and modified site work to include a (n) patch of travel to a public way ((n) concrete sidewalks as indicated, (n) accessible parking and ramps (n) bicycle parking accessories, (n) metal fencing and manual gate to replace (e). Filed as: ADAIR GENERAL CONSTRUCTION |
| 2349 Gateway Oaks Dr 200 City of Sacramento · APN 274-0630-004-0000 | Commercial tenant improvement COM-2214706Portal ↗ | Issued Aug 3, 2022 22d review | Finaled | $17,288 | EPC - Minor TI to an existing suite #200. An existing copy room will be converted into a lactation room. Existing casework will be removed from the copy room and replaced with new casework which consists of a new sink. New electrical outlets will also be added in the room. Plumbing and Electrical are included to accommodate for the new outlets and sink. Upgrades to accessibility items are included for accessibility compliance. Filed as: ADAIR GENERAL CONSTRUCTION |
| 1500 W El Camino Ave 10 City of Sacramento · APN 274-0060-035-0000 | Commercial tenant improvement COM-2205709Portal ↗ | Issued Jul 20, 2022 126d review | Finaled | $80,000 | EPC - Suite #10 - Tenant finish out for a Rent-A-Center furniture store. Scope of work includes installing mechanical, electrical and plumbing (drinking fountain, water closet and lavatory). Install new interior walls. The storage room will have extra merchandise (appliances, bedroom furniture, dining etc.) within the space. There will not be any high pile storage. Filed as: ADAIR GENERAL CONSTRUCTION |
| 2399 Gateway Oaks Dr 200 City of Sacramento · APN 274-0630-001-0000 | Commercial tenant improvement COM-2126388Portal ↗ | Issued Jan 10, 2022 26d review | Finaled | $38,709 | EXPEDITED - EPC - Suite #200 - Commercial Remodel to Include: Removing two existing partition walls to increase area of the open office and file room. Tenant will provide new modular system furniture and base cabinets in the breakroom. New floor finishes, will replace some existing carpet. Mechanical and Electrical updated to accommodate new changes. Filed as: ADAIR GENERAL CONSTRUCTION |
| 1500 W El Camino Ave 10 City of Sacramento · APN 274-0060-035-0000 | Commercial tenant improvement COM-2123106Portal ↗ | Issued Dec 21, 2021 55d review | Finaled | $54,794 | EPC - Suite #10 Remodel to Restore to Vanilla Shell to Include: Mechanical and Electrical Improvements. Area of work is unoccupied and shall remain vacant. Future occupancy to be obtained under separate permit. Filed as: ADAIR GENERAL CONSTRUCTION |
| 1500 W El Camino Ave 5 City of Sacramento · APN 274-0060-035-0000 | Commercial tenant improvement COM-2111998Portal ↗ | Issued Jul 8, 2021 34d review | Finaled | $50,392 | EPC - Interior Demolition and Remodel (Suite #5- 928 SF) {B-M-E--F } TO RESTORE VACANT SUITE BACK TO VANILLA SHELL CONDITIONS. SCOPE OF WORK INCLUDED MECHANICAL AND ELECTRICAL IMPROVEMENTS. AREA OF WORK IS UNOCCUPIED AND SHALL REMAIN VACANT. ANY FUTURE OCCUPANCY SHALL BE OBTAINED THROUGH A SEPARATE PERMIT. Filed as: ADAIR GENERAL CONSTRUCTION |
| 1530 W El Camino Ave City of Sacramento · APN 274-0060-033-0000 | Commercial tenant improvement COM-2106534Portal ↗ | Issued May 7, 2021 39d review | Finaled | $47,519 | EPC - 1) INSTALL NEW FLOOR AND WALL FINISHES. 2) CONSTRUCT NEW ALL GENDER RESTROOM, BREAKROOM, AND (2) new offices. 3) INSTALL NEW DOORS AND FRAMES Filed as: ADAIR GENERAL CONSTRUCTION |
| 4720 Freeport Blvd 110 City of Sacramento · APN 017-0121-067-0000 | Commercial tenant improvement COM-2015814Portal ↗ | Issued Oct 27, 2020 56d review | Certificate of Occupancy | $121,456 | EPC - FIRST TENANT IN A NEW BUILDING. INTERIOR WORK INCLUDES:NEW OFFICES, CONFERENCE ROOMS AND COPY ROOM · NEW TOILET ROOM · NEW LIGHTING AND HVAC SYSTEM ·EXISTING SPRINKLER SYSTEM MODIFICATIONS Filed as: ADAIR GENERAL CONSTRUCTION |
| 1450 Expo Pkwy City of Sacramento · APN 275-0310-021-0000 | Commercial tenant improvement COM-1900213Portal ↗ | Issued Feb 4, 2019 31d review | Finaled | $127,552 | EXPEDITED - Remodel, 1) create 1st floor lobby space to divide (E) 2- floor suite in to (2) separate suites, 2) divide an existing office into a conference room and waiting room. 3) remove and relocate (E) entry doors. 4) install a new pair of entrance doors. 5) create 3 office rooms and a break room within an (E) open office space. 6) adding signage to existing toilet room, 7) new electrical mechanical and plumbing Filed as: ADAIR GENERAL CONSTRUCTION |
| 1500 W El Camino Ave 1 City of Sacramento · APN 274-0060-035-0000 | Commercial tenant improvement COM-1820831Portal ↗ | Issued Nov 26, 2018 32d review | Finaled | $81,330 | EXPEDITED - construction of new demising wall to divide existing single commercial suite into two suites addition of new storefront door at suite 1 addition of new storefront entry doors at suite 2. demolition of non-compliant toilet rooms and addition of an accessible toilet room in suite 2extension of existing gas, sewer, and water lines to service suite 1 "Permit not for occupancy" Filed as: ADAIR GENERAL CONSTRUCTION |