Active in City of Sacramento (72 permits)
Raw permit filing name: AMERICAN BUILDING DEVELOPMENT
53 issued · 27 parcels
vs 12 prior 24m(+392%)
Includes 1 ADU permits
Sum of permit job values
Application → issuance
Latest: Oct 16, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 41 | 26 | — | $1,148,167 | 124d (n=26) | 14d (29d p75) | Above 75th pct turnaround | |
| 10 | 8 | — | $193,136 | 1d (n=8) | 1d (3d p75) | Within typical range | |
| 9 | 8 | — | $57,420 | 42d (n=8) | 0d (0d p75) | Above 75th pct turnaround | |
| 3 | 3 | — | $30,000 | 3d (n=3) | 1d (7d p75) | Within typical range | |
| 3 | 3 | — | $89,162 | 15d (n=3) | 0d (0d p75) | Above 75th pct turnaround | |
| 2 | 2 | — | $30,650 | 68d (n=2) | 42d (83d p75) | — | |
| 1 | 1 | — | $81,136 | — | 69d (132d p75) | — | |
| 1 | 0 | 1 | $100,000 | — | 97d (172d p75) | — | |
| 1 | 1 | — | $25,000 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $20,000 | — | 33d (85d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2212 26th St City of Sacramento · APN 010-0173-012-0000 | General repair COM-2612076Portal ↗ | Issued Oct 16, 2026 128d review | Issued | $21,900 | EPC - Deck & Stair Dry rot Repair -Rebuild (e) 138 SF deck -Remove & Replace (e) deck framing on a like for like bases per plan -Remove & Replace (e) railing on like for like bases per plan -Remove & replace (e) deck boards -Remove & replace (e) stair & landing framing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 19 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622811Portal ↗ | Applied Oct 12, 2026 | Plan Check Target | $47,150 | Existing Balcony Dry Rot Repair: BLDG 7146: Unit: 19, 20 & 22(76SF Approx) -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Remove & Replace (E) Guard Railing w/(N) RDI Guard Railingexisting Landing Dry Rot Repair BLDG 7146: Unit: 22 (24sf approx) -Remove & replace (E) Landing Framing w/(N) landing framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Reinstall (E) Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 44 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622798Portal ↗ | Applied Oct 12, 2026 | Plan Check Target | $20,700 | Existing Balcony Dry Rot Repair: BLDG 7144: Unit: 15 &16 (40SF Approx) -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 9 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622717Portal ↗ | Applied Oct 10, 2026 | Plan Check Target | $37,200 | Existing Balcony Dry Rot Repair: BLDG 7166: Unit: 9,10 &12 (40SF Approx) Remove & replace (E) Balcony Framing w/(N) Balcony Framing Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Existing Landing Dry Rot Repair BLDG 7166: Unit: 12 (24sf approx) Remove & replace (E) Landing Framing w/(N) landing framing Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing Reinstall (E) Railing Carbon monoxide & Smoke alarms required. Reference CRC sections R310.1 & R311.1. Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7164 Calvine Rd City of Sacramento · APN 117-0140-020-0000 | General repair COM-2622575Portal ↗ | Applied Oct 8, 2026 | Plan Check Wait | $35,700 | Existing Balcony Dry Rot Repair: BLDG 7164: Unit: 2,5 &6 (40SF Approx) -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Existing Landing Dry Rot Repair BLDG 7164: Unit: 2 (24sf approx) -Remove & replace (E) Landing Framing w/(N) landing framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Reinstall (E) Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7132 Calvine Rd City of Sacramento · APN 117-0140-020-0000 | General repair COM-2622474Portal ↗ | Applied Oct 8, 2026 | Plan Check Target | $35,150 | Existing Balcony Dry Rot Repair: BLDG 7132: Unit: 42,45,46(40SF Approx) -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Existing Landing Dry Rot Repair BLDG 7132: Unit: 42 (24sf approx) -Remove & replace (E) Landing Framing w/(N) landing framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Reinstall (E) Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 1235 Fee Dr City of Sacramento · APN 277-0242-007-0000 | Windows / doors / siding COM-2621537Portal ↗ | Issued Oct 8, 2026 10d review | Issued | $31,320 | The contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to remove the existing decorative CMU wall finish and install a new three-coat cement stucco system on the north and east exterior walls. Work includes substrate preparation, installation of weather-resistant barrier and metal lath where required, application of scratch, brown, and finish coats to match the existing texture, caulking and sealing of all joints, and removal of all construction debris. No structural changes or change of occupancy are proposed. Existing framing is assumed to be structurally sound. Any concealed damage discovered during demolition will be addressed separately if required. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R310 & R311. Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 2 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622442Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $39,850 | 3rd Floor: Unit 22, 23, & 24 2nd Floor: Unit 20 & 21 R & R (e) Balcony Framing w/ (n) Balcony Framing R & R (e) Balcony Sheathing w/ (n) 3/4" Plywood Sheathing R & R (e) Decking w/(n) Westcoat pro Alx Waterproofing Reinstall (e) railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7134 Calvine Rd City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622437Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $18,700 | Existing Balcony Dry Rot Repair: BLDG 7134: Unit: 39 & 40 (40SF Approx) -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 1 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622434Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $29,120 | 3rd Floor: Unit 9, 10 & 11 2nd Floor: Unit 7 & 8 R & R (e) Balcony Framing w/ (n) Balcony Framing R & R (e) Balcony Sheathing w/ (n) 3/4" Plywood Sheathing R & R (e) Decking w/(n) Westcoat pro Alx Waterproofing Reinstall (e) railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 49 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622425Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $37,400 | Existing Balcony Dry Rot Repair: BLDG 7142: Unit: 49,50,53 & 54 (40SF Approx) -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7122 Calvine Rd City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622406Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $38,150 | Existing Balcony Dry Rot Repair: BLDG 7122: Unit: 33,34,36 (40SF Approx.) -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Existing Landing Dry Rot Repair Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 3 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622393Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $31,500 | Existing Balcony Dry Rot Repair:BLDG 7140: Unit: 25,26,29 &30 (76SF Approx)Remove & replace (E) Balcony Framing w/(N) Balcony Framing, Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing, Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing, Remove & Replace (E) Guard Railing w/(N) RDI Guard Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 3 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622392Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $32,850 | Existing Balcony(Approx. 396 SF) Dry Rot Repair: 2nd Floor: Unit 56,57,58,59,60 & 61 -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Reinstall (E) Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 43 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622357Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $128,862 | Balcony(Approx. 500SF) Dry Rot Repair BLDG 4 Units 43,44,45,46,47,48 & 49 -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Deck Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx waterproofing -Reinstall (E) Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 7190 Calvine Rd 3 City of Sacramento · APN 117-0140-016-0000 | General repair COM-2622342Portal ↗ | Applied Oct 7, 2026 | Plan Check Wait | $29,120 | Existing Balcony(Approx 178 SF) Dry Rot Repair: 3rd Floor: Unit 33,34 & 35 2nd Floor: Unit 31 & 32 -Remove & replace (E) Balcony Framing w/(N) Balcony Framing -Remove & replace (E) Balcony Sheathing w/ 3/4'' plywood sheathing -Remove & replace(E) Decking w/(N) westcoat Pro Alx Waterproofing -Reinstall (E) Railing Filed as: AMERICAN BUILDING DEVELOPMENT |
| 6153 2nd Ave City of Sacramento · APN 011-0254-025-0000 | Other RES-2616996Portal ↗ | Issued Oct 5, 2026 60d review | Issued | $20,000 | EPC - -(n) addition of detached patio cover & deck (approx 186 sqft for each one). Filed as: AMERICAN BUILDING DEVELOPMENT |
| 1632 36th St City of Sacramento · APN 007-0372-020-0000 | Roof replacement RES-2619467Portal ↗ | Issued Sep 18, 2026 15d review | Issued | $52,062 | Siding Permit: Remove and replace approximately 16.5 SQ of existing exterior siding with James Hardie 8-inch Cedarmill lap siding. Install 19/32-inch OSB sheathing and weather-resistant barrier as required. Install flashing and trim around existing windows, doors, and corners. Install approximately 115 sq. ft. of James Hardie vented Cedarmill soffit panels beneath existing roof eaves. Paint exterior soffits and overhangs to match. No structural alterations or changes to existing doors or window openings. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: AMERICAN BUILDING DEVELOPMENT |
| 6153 2nd Ave City of Sacramento · APN 011-0254-025-0000 | Windows / doors / siding RES-2617005Portal ↗ | Issued Aug 6, 2026 0d review | Issued | $6,771 | Window/Door Permit-NON-STRUCTURAL-Remove & replace (e) window w/ same size (n)door. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: AMERICAN BUILDING DEVELOPMENT |
| 1509 27th St City of Sacramento · APN 007-0272-002-0000 | Roof replacement COM-2607904Portal ↗ | Issued Jun 17, 2026 57d review | Issued | $33,600 | EPC - Dry Rot Repair: -Remove & replace 3/4 Deck sheathing -Remove & replace Deck flooring with west coat pro alx -Remove & replace 2x Deck framing on a like for like bases per plan -Remove & replace guardrail on a like for like bases per plan. -Remove & replace support post and beam on a like for like bases per plan. -Remove & replace roof framing & roof sheathing on a like for like bases per plan. Filed as: AMERICAN BUILDING DEVELOPMENT |
| 914 26th St City of Sacramento · APN 007-0034-012-0000 | Addition (adds square footage) COM-2607158Portal ↗ | Issued May 29, 2026 48d review | Issued | $15,650 | EPC - Deck & Stair Dry Rot Repair Rebuild EXISTING 74 sf deck Remove & replace (e) deck framing on a like for like bases per plan remove & replace (e) railing on a like for like bases perm plan remove & replace (e) deck boards remove & replace (e) stair framing Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. - PLNG-INSP Filed as: AMERICAN BUILDING DEVELOPMENT |
| 1015 Rio Ln City of Sacramento · APN 016-0161-035-0000 | General repair COM-2603325Portal ↗ | Issued Mar 30, 2026 38d review | Finaled | $60,000 | EPC - Deck Dry Rot Repair (Unit 212, 213, 214, 215) -Remove & replace (e) deck sheathing w/ (n) 23/32'' Plywood sheathing. -remove & replace (e) deck waterproof w/(n) west coat pro alx. -remove & replace (e) 2x Deck Framing on a like for like bases per plan. -remove & replace (e) guardrail on like for like bases per plan. Filed as: AMERICAN BUILDING DEVELOPMENT |
| 2426 P St City of Sacramento · APN 007-0331-027-0000 | General repair COM-2526423Portal ↗ | Issued Mar 18, 2026 96d review | Issued | $21,600 | EPC - 2 SHARED PLANS -Landings Repair: Redwood Decking on the Walkways- Redwood decking Option Disconnect any affected utilities and reconnect it, if applicable. Carefully dismantle and remove the existing deck boards. Install framing and joists per the approved design and Redwood installation guidelines. Securely install Redwood deck boards, ensuring proper spacing, alignment, and required ventilation. Prime and paint new materials. New Redwood Handrailing on Stairs and Landings- Install vertical posts at designated intervals (typically every 6-8 feet) around the deck perimeter. Ensure posts are anchored securely in concrete footings or attached to the deck frame, as per design specifications. Attach a top rail along the perimeter of the deck, ensuring it is level and securely fastened to the posts. Install a bottom rail (if required by design) to provide additional stability and support for the balusters. Install balusters and securely fastened to both the top and bottom rails, maintaining uniform spacing. Sand any rough edges on the railings and posts to ensure safety and a smooth finish. Install post caps or decorative elements if specified in the design.-Grab bar to stairway railing per code.-Install new posts at bottom of stair railings to meet building code, as shown on page 4.-Prime and paint new materials. Dry Rot Repair- Dry Rot Repair-Provide and replace damaged 6x6 support posts (6 EA)-Provide and replace damaged fascia boards with new primed materials.-Lattice to cover the hold on stairway-Replace bumper on back wall .- Repair fire escape ladder.- Prime and Paint new materials. Support Posts & Stringers Installation- -Add new concrete footings and metal support post at bottom of stairs.-Install additional 2 stringers to each stairs.-Provide and install plastic spacers and sleeper boards between concrete and stairs stringers. Shared plans reviewed under COM-2526420 Filed as: AMERICAN BUILDING DEVELOPMENT |
| 2424 P St City of Sacramento · APN 007-0331-027-0000 | General repair COM-2526420Portal ↗ | Issued Mar 18, 2026 96d review | Issued | $21,600 | EPC - 2 SHARED PLANS -Landings Repair: Redwood Decking on the Walkways- Redwood decking Option Disconnect any affected utilities and reconnect it, if applicable. Carefully dismantle and remove the existing deck boards. Install framing and joists per the approved design and Redwood installation guidelines. Securely install Redwood deck boards, ensuring proper spacing, alignment, and required ventilation. Prime and paint new materials. New Redwood Handrailing on Stairs and Landings- Install vertical posts at designated intervals (typically every 6-8 feet) around the deck perimeter. Ensure posts are anchored securely in concrete footings or attached to the deck frame, as per design specifications. Attach a top rail along the perimeter of the deck, ensuring it is level and securely fastened to the posts. Install a bottom rail (if required by design) to provide additional stability and support for the balusters. Install balusters and securely fastened to both the top and bottom rails, maintaining uniform spacing. Sand any rough edges on the railings and posts to ensure safety and a smooth finish. Install post caps or decorative elements if specified in the design.-Grab bar to stairway railing per code.-Install new posts at bottom of stair railings to meet building code, as shown on page 4.-Prime and paint new materials. Dry Rot Repair- Dry Rot Repair-Provide and replace damaged 6x6 support posts (6 EA)-Provide and replace damaged fascia boards with new primed materials.-Lattice to cover the hold on stairway-Replace bumper on back wall .- Repair fire escape ladder.- Prime and Paint new materials. Support Posts & Stringers Installation- -Add new concrete footings and metal support post at bottom of stairs.-Install additional 2 stringers to each stairs.-Provide and install plastic spacers and sleeper boards between concrete and stairs stringers. Shared plans reviewed under COM-2526420 Filed as: AMERICAN BUILDING DEVELOPMENT |
| 209 Belfont Cir City of Sacramento · APN 201-0490-105-0000 | Windows / doors / siding RES-2524488Portal ↗ | Issued Dec 8, 2025 17d review | Finaled | $18,000 | EPC - EXPEDITED - Remove & Replace a balcony dry rotted beam. Install new beam and stucco patching.Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: AMERICAN BUILDING DEVELOPMENT |