Active in City of Sacramento (89 permits)
Raw permit filing name: TURNER CONSTRUCTION COMPANY
22 issued · 6 parcels
vs 1 prior 24m
9 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jul 18, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 65 | 2 | — | — | — | 41d (93d p75) | — | |
| 11 | 10 | — | $5,520,593 | 36d (n=10) | 33d (85d p75) | Within typical range | |
| 6 | 4 | — | $8,039,393 | 57d (n=4) | 63d (119d p75) | Within typical range | |
| 2 | 2 | — | $351,000 | 24d (n=2) | 0d (0d p75) | — | |
| 1 | 1 | — | $338,117,717 | — | 241d (334d p75) | — | |
| 1 | 1 | — | $18,054 | — | 42d (83d p75) | — | |
| 1 | 1 | — | $22,000 | — | 4d (21d p75) | — | |
| 1 | 1 | — | $80,000 | — | 3d (8d p75) | — | |
| 1 | 0 | — | $20,000 | — | 0d (0d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-050-0000 | Commercial tenant improvement COM-2305034Portal ↗ | Issued Jul 18, 2023 124d review | Finaled | $1,023,993 | EPC - Size- 43,289 SF. Construction type- IIA. Occupancy- A3 & B. The following are components needed for the replacement. Architectural scope consisting of identification of existing rated walls. Structural scope consisting of identification of existing frame type, and rework of existing framing for new fire alarm control panel (FACP). Electrical scope consisting of demolition of existing FACP 120V circuit, and new 120V circuits for new FACP and fire alarm booster panels. Note: Fire alarm drawings are included for reference only. Filed as: TURNER CONSTRUCTION COMPANY |
| 1130 K St City of Sacramento · APN 006-0106-004-0000 | Commercial tenant improvement COM-2118433Portal ↗ | Issued Oct 26, 2021 63d review | Finaled | $750,000 | EPC - EXPEDITED - Improvement of existing office space. Addition of several small offices, a large conference room, medium conference room, and small conference room. New ductwork, electrical outlets, and sprinklers modifications. Majority of the space to remain open with furniture cubicles. Filed as: TURNER CONSTRUCTION COMPANY |
| 246 6th St City of Sacramento | Plan revision / deferred submittal COM-2113966Portal ↗ | Issued Aug 4, 2021 37d review | Expired Permit | — | EPC - PHASED PERMIT for rough grading associated with COM-1924719 [409,664 gross sf, Type-IIB, 20,136 capacity MLS Stadium (A-5)] - PLNG-INSP Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | New commercial / non-residential building COM-1408554Portal ↗ | Issued May 17, 2019 | Certificate of Occupancy | $338,117,717 | EPC - EXPEDITED - NEW ARENA AND PRACTICE FACILITY - construction of 754,509 (64,245 existing parking to remain at parking levels 1 & 2) sqft arena and practice facility on 6.8 acres in the downtown plaza. - PLNG-INSP Filed as: TURNER CONSTRUCTION COMPANY |
| 2500 Venture Oaks Way 200 City of Sacramento · APN 274-0320-039-0000 | Commercial tenant improvement COM-1802930Portal ↗ | Issued Mar 23, 2018 36d review | Finaled | $770,192 | EXPEDITED 15,10,10 - EPC Submittal - Remodel of Commercial Building - 7600 Square Feet of renovation, demo permit issued under permit COM-1800739. remodel to include fire, mechanical, electrical, plumbing, finishes and reconfiguring the interior layout. (See attached reference plan for existing Accessible Parking from permit COM-1508093 SMB 6/6/18) Filed as: TURNER CONSTRUCTION COMPANY |
| 2500 Venture Oaks Way 200 City of Sacramento · APN 274-0320-039-0000 | Remodel / interior alteration COM-1800739Portal ↗ | Issued Jan 17, 2018 5d review | Finaled | $22,000 | EXPEDITED - Suite 200 interior demolition per approved plans. Filed as: TURNER CONSTRUCTION COMPANY |
| 246 6th St City of Sacramento | Plumbing / water heater / sewer COM-1720672Portal ↗ | Issued Nov 7, 2017 0d review | Finaled | $1,000 | Install temporary water service approximately 200 ft of 3" PVC for construction purposes. (See ENC17-0234 for Backflow) Filed as: TURNER CONSTRUCTION COMPANY |
| 0 Unknown City of Sacramento | Other COM-1712081Portal ↗ | Issued Oct 17, 2017 99d review | Expired Permit | $4,500,000 | ROUGH GRADING ONLY of 637,217 sf gross site development area for future 19,621 seat outdoor soccer stadium in The Railyards - NO BUILDING or PLANNING INPECTIONS, Final grading certificate shall be provided to Utilities. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1719041Portal ↗ | Applied Oct 13, 2017 | Complete | — | REVISION TO COM-1512181 - FIRE ALARM Revision to the approved fire alarm system to remove a beam detector on the catwalk level inside of the G1C due to new signage installed above the video board.. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1710884Portal ↗ | Applied Jun 22, 2017 | Complete | — | EPC - Revision to (main permit COM-1504712) approved fire sprinklers for the G1C to add additional sprinkler coverage to retractable seating (to allow storage) currently located below the precast stadia at Event Level (sheets FP EL 03, 04 & 05). Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1620141Portal ↗ | Applied Dec 13, 2016 | Withdrawn | — | EPC - Revision (COM-1415518) to update drawings for the 18" storm and 10" sewer lines for cleanouts beneath the Plaza at the G1C site. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1619698Portal ↗ | Applied Dec 7, 2016 | Complete | — | EPC - Revision to (COM-1415518) add "standing room only" capacity (648 additional ticketed patrons) at the letter box end of the Bridge Level (upper concourse) in the Golden 1 Center. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1616111Portal ↗ | Applied Oct 6, 2016 | Complete | — | EPC - Revision (COM-1415518) to modify the occupant load at the Box Office Lobby in the Arena Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Commercial tenant improvement COM-1616109Portal ↗ | Applied Oct 6, 2016 | Complete | — | EPC - Revision (COM-1415518) to add support framing for artwork at upper concourse in the Arena Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Other COM-1615430Portal ↗ | Applied Sep 23, 2016 | Withdrawn | $755,593 | EPC - Bridge Lift Support System (rigging/truss) for the installation of lapidaries above the halo in the upper bowl of the Arena Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1615420Portal ↗ | Applied Sep 23, 2016 | Complete | — | EPC - Revision (COM-1512181) to fire alarm to install fire alarm aspiration systems in the Arena. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Solar / battery storage COM-1612811Portal ↗ | Issued Sep 23, 2016 43d review | Finaled | $80,000 | EXPEDITED - EPC - Installation of Wireless Verizon equipment: to include radio cabinet, remote radio heads, battery and power bay and GPS installation with the required RF,DC and Data Cabling - PLNG-INSP Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1615162Portal ↗ | Applied Sep 21, 2016 | Expired Application | — | EPC - Revision (COM-1508618) to Plaza work immediately in front of 630 K to relocate stairs constructed by Turner Construction. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1614819Portal ↗ | Applied Sep 15, 2016 | Complete | — | EPC - Revision (COM-1508618) to Plaza work to remove Phases 3 and 7 construction from the overall Plaza work. This permit re-defines the actual Plaza area to be constructed by Turner. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1614818Portal ↗ | Applied Sep 15, 2016 | Complete | — | EPC - REVISION (COM-1508618) to Plaza work for Phase 7 work to be constructed by Swinerton Builders as part of mixed use commercial/hotel work currently under construction. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Electrical / panel COM-1614296Portal ↗ | Applied Sep 7, 2016 | Void | $20,000 | EPC - Installation of (12) DAS equipment racks in the DAS Headend Comm. Room as well as coax cable support structure. Adding thirteen (14) 20A breaks to the existing 400A panel and pull electrical to feed thirteen (13) 20A outlets for powering the equipment racks. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Other COM-1602844Portal ↗ | Issued Sep 1, 2016 189d review | Finaled | — | EPC - Signage Support systems for interior way finding signage only (anchorage with engineering calculations) for the Arena and Practice Facility. Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1613686Portal ↗ | Applied Aug 25, 2016 | Void | — | EPC - Revision to (COM-1415518) mechanical systems in two concession areas in the Arena Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Plan revision / deferred submittal COM-1613586Portal ↗ | Applied Aug 24, 2016 | Complete | — | EPC - Revision to (COM-1603994) the Clean Agent Fire Extinguishing Systems (to reflect as-built dimensions & locations) at the Arena/Practice Facility Filed as: TURNER CONSTRUCTION COMPANY |
| 500 David J Stern Walk City of Sacramento | Other COM-1613348Portal ↗ | Issued Aug 23, 2016 4d review | Finaled | $9,000 | EPC - Installation of conduit (1 - 4" run) only for speaker wires to be located in parking level 2 for the Fontana sound art in the Plaza. The conduit will be exposed on the garage ceiling Filed as: TURNER CONSTRUCTION COMPANY |