Sacramento 95814 · Downtown · APN 006-0106-004-0000 · City of Sacramento
Zoned C-3-SPD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $825,000 ($726,000–$924,000).
Public building records show issued construction/renovation work on this parcel (40 total permits, latest Feb 29, 2024).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
162 substantial renovation & housing permits over 24 months (114.0 per 1,000 parcels vs. 30.4 citywide baseline) (#33 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Downtown)
about 52% of the lot of the parcel intersects Zone X: minimal flood hazard. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$825,000
Benchmark range: $726,000 – $924,000
Closest lead: 1121 I Street Mixed-Use (0.19 mi N, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$821/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 282 homes completed, 62 permitted, 338 proposed or in review (277 of them deed-restricted affordable); 2 commercial or mixed-use projects.
16 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
597 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-3 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "In review" for 8.1 yr (since Oct 2, 2018), with no new permit record in 5.8 yr. · 55 units · $90,000,000 declared valuation
In "Entitled" for 5.8 yr (since Jan 15, 2021), with no new permit record in 5.8 yr. · 1 unit
In "Entitled" for 5.8 yr (since Jan 21, 2021), with no new permit record in 5.8 yr. · 137 units
In "Entitled" for 5.8 yr (since Feb 8, 2021), with no new permit record in 5.8 yr. · 73 units
In "Entitled" for 5.8 yr (since Feb 9, 2021), with no new permit record in 5.8 yr. · 2 units
In "Entitled" for 5.7 yr (since Mar 10, 2021), with no new permit record in 5.7 yr. · 51 units
Nearby permit (92ce9e9971d0e5911950ad803bf38cbff381947a): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (792c1e9607e2695d2e5e168c15ca21d14489474c): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (c81c12e562583fd5031bf5fc1c1b2d3aae7067d0): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (c6ae48b6087da9b5c192cc94ff1dc2e33b894353): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1230 J St): Status changed from Temporary C of O to Expired Permit
Record COM-2508730 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1020 7th St): Status changed from Plan Check Wait to Plan Check Target
Record COM-2617999 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (1214 F St): First appeared in published agency feed
Record COM-2623185 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (1000 J St): Status changed from Issued to Expired Permit
Record COM-2504529 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (1723 J St): Status changed from Issued to Finaled
Record COM-2618926 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (555 Capitol Mall 1090): Status changed from Plan Check Target to Plan Check Wait
Record COM-2616737 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1228 N St): First appeared in published agency feed
Record COM-2621606 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (815 11th St): First appeared in published agency feed
Record COM-2621532 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1000 G St 100): Status changed from Ready-to-Issue to Issued
Record FPP-2619923 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1000 G St 100): Issued date changed from (blank) to 2026-09-30
Record FPP-2619923 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (1024 P St): Status changed from Issued to Expired Permit
Record COM-2521536 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Entitled" for 3.7 yr (since Mar 2, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (204 housing units across 0 permits).
In "Entitled" for 5.5 yr (since May 26, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (10 housing units across 0 permits).
In "In review" for 2.8 yr (since Jan 19, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (206 housing units, $61,800,000 declared valuation across 1 permit).
In "In review" for 8.1 yr (since Oct 2, 2018), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (55 housing units, $90,000,000 declared valuation across 3 permits).
In "Fee estimate" for 3.3 yr (since Jul 13, 2023), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale (28 housing units, $175,000,000 declared valuation across 1 permit).
In "Entitled" for 5.8 yr (since Jan 21, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (137 housing units across 0 permits).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 1,421 parcels
−15.9% YoY
City baseline: 30.4 / 1k
162 in trailing 24m
Includes 3 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| White Star Construction | Commercial tenant improvement | 20 on parcel37 in ½ mi | $23,792,028 | 1 vs 13 prior−92% |
| Turner Construction | Commercial tenant improvement | 1 on parcel6 in ½ mi | $344,380,979 | 0 vs 1 prior |
| Foothill Fire Protection | Fire alarm / sprinkler | 2 on parcel3 in ½ mi |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95814
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($8,250/yr) + local voter-approved bond debt ($1,155/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$42,158/yr
Cash needed: $181,500
NOI: $7,902/yr
P&I: $4,172/mo
For $0/mo net cash flow
At $2,125/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,955/mo | −$3,757/mo | -24.8% | $7,200/mo | −$3,753/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,125/mo | −$3,513/mo | -23.2% | $6,664/mo | −$3,388/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,253/mo | −$3,373/mo | -22.3% | $6,509/mo | −$3,111/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
SUITE 320 - remodel
EPC - SUITE 320 - Demolition of non load bearing partitions, interior modifications of existing office suite 320 area increases to include a portion of suite 340 (1,971 sf) Includes new walls, new and relocated doors, windows, electrical, mech and fire sprinkler distribution. Relocation of plumbing, new fixtures, finishes and cabinetry.
Remodel Suites 260/270
EPC - Construction of spec TI within existing suite on the second floor of an existing 6 story office building located at 1130 K Street. Tenant improvement will include the construction of a single office and kitchennete within suite 260/270 along with new flooring and paint. Mechanical, plumbing and lighting will be designed to relate to new layout. Modifications to fire sprinkler will performed as required.
EPC - REMODEL STE 240
EPC - REMODEL STE 240-Construction of spec TI within existing suite on the second floor of an existing 6 story office building located at 1130 K Street. Tenant improvement will include the construction of a single office and kitchenette within suite 240 along with new flooring and paint. Mechanical, plumbing and lighting will be designed to relate to new layout. Modifications to fire sprinklers will be performed as required.
SUITE 210-215 AND 220-230 REMODEL
EPC - Remodel within existing suites on the second floor of an existing 6 story office building. Remodel will include the construction of a single office and kitchenette within suite 220-230 and flooring and paint in suites 210 and 215. Mechanical, plumbing and lighting will be designed to relate to new layout. Modifications to existing fire sprinklers will be performed as required.
1130 K Street Four Floor Fire Alarm
EPC - PROVIDE MODIFICATION TO THE EXISTING SPRINKLER MONITORING SYSTEM WITH FULL OCCUPANT NOTIFICATION IN COMMON AREAS ON THE FOURTH FLOOR OF THE PROJECT. FLOORS LOWER LEVEL THROUGH THIRD, AND FIFTH-SIXTH ARE UNDER SEPARATE PERMITS. NOTIFICATION DEVICES IN VACANT TENANT SPACE ON THE FOURTH FLOOR ARE FOR GENERAL NOTIFICATION IN THE CURRENT LAYOUT CONFIGURATION AND TO BE MODIFIED UNDER SEPARATE PERMIT WHEN TENANT IMPROVEMENT(S) OCCUR
1130 K Street 5th & 6th Floor Fire Alarm Revision
EPC - Revision to COM-2118249 for MODIFICATION TO THE EXISTING SPRINKLER MONITORING SYSTEM WITH FULL OCCUPANT NOTIFICATION. SYSTEM SHALL MONITOR ALL FIRE ALARM INITIATING DEVICES AS INDICATED ON THE DESIGN PLANS. SYSTEM SHALL MONITOR ALL SUPERVISORY DEVICES AS INDICATED ON DESIGN PLAN
Revision - Fire Pump Power
EPC - Revision to COM-2017330; showing updates to power requirements for new fire pump being installed.
MEP, Fire and Lighting Modifications
EPC - Added scope of work to COM-2104400; Additional tenant improvement work has been added to suites 205 and 280, including MEP, fire sprinklers, and alarm.
Revision - 1130 K St. - Rating Steel & Shafts
EPC - Revision to COM-2017330; Method for rating structural steel that is acting as the supporting construction for 2hr fire rated shafts has been revised to add the option of utilizing a gyp bd system to achieve the required rating.
Revision - Mechanical Duct
EPC - Revision to COM-2106221; New mechanical duct above gyp. board ceiling in 4th floor women's restroom has been added to plans.
1130 K ST - FIRE ALARM REVISION
EPC - Revision to COM-2023745 - Change to fire alarm plans as a result of new interior walls in lower level corridors 005 and 008.
Revision - Plumbing - 1130 K St.
EPC - Revision to COM-2017330; Plumbing revisions to water heating, condensate piping, deck drainage and gas lines.
Revision - As builts
EPC - Revision to COM-2017330; Plan updates being provided to align with existing conditions, and to reflect a revision to the roof assembly. Removal of deferred items from the cover sheet: Steel Stairs, Roof Tie-backs, and equipment anchorage. Life safety modifications.
Revision - HVAC
EPC - Revision to COM-2104029; HVAC revisions to 1st floor shower rooms and generator room.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
0.73 acres
Assessor's classification for assessment purposes. This is not zoning.
1130 K ST; 1130 K ST STE 100 STE 100; 1130 K ST STE 101 STE 101
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 006-0106-004-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| $27,286 |
| 1 vs 1 prior |
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS LLC Recent nearby: 925 L St (Oct 6, 2026) | Commercial tenant improvement | 201 in ½ mi | $33,962,274 | 39 vs 62 prior−37% |
| Browning Construction Recent nearby: 555 Capitol Mall 1200 (Oct 16, 2026) | Commercial tenant improvement | 66 in ½ mi | $6,475,040 | 5 vs 9 prior−44% |
| Bt Builders Recent nearby: 1201 K St 1615 (Sep 4, 2026) | Commercial tenant improvement | 59 in ½ mi | $12,723,347 | 10 vs 12 prior−17% |
| Jones And Lamberti Builders Recent nearby: 621 Capitol Mall 1525 (Oct 20, 2026) | Commercial tenant improvement | 55 in ½ mi | $13,636,908 | 28 vs 33 prior−15% |
| Marketone Builders Recent nearby: 660 J St (May 24, 2024) | Commercial tenant improvement | 40 in ½ mi | $29,302,473 | 10 vs 13 prior−23% |
| Pacific Ridge Builders Recent nearby: 1215 K St 1930 (Sep 22, 2026) | Commercial tenant improvement | 24 in ½ mi | $18,948,136 | 46 vs 10 prior+360% |
| Tnt Industrial Contractors Recent nearby: 1325 J St (Oct 14, 2026) | Commercial tenant improvement | 23 in ½ mi | $3,737,877 | 4 vs 4 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage)On this parcel | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Fire alarm / sprinklerOn this parcel | 2,312 | 8d | 14d | 29d | 71d | 13d(vs 15d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
Remodel - First Floor
EPC - EXPEDITED - Improvement of existing office space. Addition of several small offices, a large conference room, medium conference room, and small conference room. New ductwork, electrical outlets, and sprinklers modifications. Majority of the space to remain open with furniture cubicles.
Deferred - Metal panel system - 1130 K St.
EPC - Deferred to COM-2017330; Installation of metal panel system
Deferred - Storefront Calculation - 1130 K St.
Deferred to COM- ; storefront calculations
Revision - HVAC equipment - 1130 K St.
EPC - REVISION to COM-2017330; HVAC equipment anchorage.
Revision: Lower Level Corridor New Walls and Doors
EPC. Revision to COM-2023745. New walls are being added in corridor 005 and corridor 008. Existing office suite entry will be relocated to accommodate the new wall in corridor 008. New wall locations are located to prevent dead end corridors in excess of 50 feet per 2019 CBC section 1020.4 exception 2. Changes under this revision are identified with a Delta 4.
Deferred Stairs - 1130 K St.
EPC - Revision to COM-2017330; Steel stairs for 5th & 6th floor structure
Deferred - Elevator 1130 K St.
EPC - Deferred to COM-2017330; Modernization of existing elevator 1 & 2. Extend Car 2 to reach new 5th & 6th floor
Deferred - Fire (5th & 6th)
EPC - Deferred to COM-2017330; Provide modification to the existing sprinkler monitoring system with full occupant notification. System shall monitor all fire alarm initiating devices as indicated on the design plans. System shall monitor all supervisory devices as indicated on design plan. HVAC equipment shall shut down as required. Elevator recall shall be provided with shunt trip and cab warning indicator. System shall have the ability to be monitored remotely with full point id. System shall have a system annunciator and manual pull at the main entrance.
Deferred - Fire Alarm ( 5th & 6 Floor)
Revision to COM-2017330; Provide modification to the existing sprinkler monitoring system with full occupant notification. System shall monitor all fire alarm initiating devices as indicated on the design plans. System shall monitor all supervisory devices as indicated on design plan. HVAC equipment shall shut down as required. Elevator recall shall be provided with shunt trip and cab warning indicator. System shall have the ability to be monitored remotely with full point id. System shall have a system annunciator and manual pull at the main entrance.
Deferred - Storefront Shop Drawings
EPC - Deferred to COM-2017330; Storefront shop drawings and material for aluminum frames entrances and storefronts for the new 5th and 6th floor addition.
ELEVATOR SEPARATION WALL
EPC - installation of new 2-hr wall to separate elevator cab 1 from cab 2 to create (2) hoistways to allow for the reactivation of cab 1 while work is completed on the second elevator cab that will be providing service to new floors 5 and 6. - PLNG-INSP
Deferred - Two Way Communication System
EPC - Deferred to COM-2017330; New 2-Way Communication System
Revision - Shifting - 1130 K St.
EPC - Revision to COM-2017330; The restrooms along the alley on floors 5 and 6 are shifting a few feet to the west. Each of these restrooms has a clerestory window that is shifting as well.
remodel
EPC - A remodel of the second floor level in an existing multi story building located at 1130 K Street. work will include a remodel of the mens and womens restrooms, installation of new flooring and repainting of walls throughout the common area corridors and upgrading of lighting to LED fixtures in second floor common areas. Additional levels of fire protection will be added to existing second floor framing and fire alarm and sprinkler system. no work is being performed in occupied tenant suites under this permit.
Commercial Remodel (4th Floor)
EPC - Remodel of the fourth floor level in an existing multi story building located at 1130 K Street. Work includes the remodel of men's and women's restrooms, installation of new flooring and repainting of walls throughout the common areas corridors and upgrading of lighting to LED fixtures in fourth floor common areas. No work is being performed in vacant tenant suite under this permit. 2-way communication system deferred to cycle 2 per email from Bradley Marchetti from Jason Lee.
1130 K ST - 3RD FLOOR REMODEL
EPC - Remodel of the third floor level in an existing multi story building located at 1130 K Street. Work will include a remodel of the men's and women's restrooms, installation of new flooring and repainting of walls throughout the common area corridors and upgrading of lighting to LED fixtures in third level common areas. No work is being performed in occupied tenant suites under this permit
1130 K Street
EPC - (2) STORY OFFICE ADDITION OF (43,200 sf) TYPE 2B CONSTRUCTION OVER EXISTING (4) STORY TYPE 1A OFFICE BUILDING (135,580 sf). EXISTING BUILDING RETROFIT WORK UNDER SEPARATE PERMIT. - PLNG-INSP see revision com-COM-2123585
1130 k Street - Remodel (1st Floor)
EPC - first floor remodel in an existing multi story building. work will include a remodel of the men's and women's restrooms, installation of new flooring and repainting of walls throughout the common area corridors, and upgrading of existing lighting to new fixtures in first floor common areas. no work is being performed in occupied tenant suites under this permit. mechanical, plumbing, and lighting will be modified as required. modifications to existing fire sprinklers will be performed as required.
Revision - New Smoke Containment Curtain
EPC - Revision to COM-2023745; New smoke containment curtain has been added to lower level freight elevator hoist-way door to meet code requirement.
Phased Permit - 1130 K Street - Revision
EPC - Revision to Phased Permit COM-2100245 to include rebuild of elevator machine room as part of scope.
Phased Permit - 1130 K Street
EPC - PHASED PERMIT TO COM-2017330; Re-build of the elevator machine room platform to replace the existing wood platform with a steel and concrete platform at the top of the existing elevator shaft. This work is the first phase of work associated with the project under plan review.
1130 K Remodel
EPC - Remodel of the lower level in an existing multi story building located at 1130 K Street. Work will include a remodel of the men's and women's restrooms, installation of new flooring and repainting of walls throughout the common area corridors, and upgrading of existing fluorescent lighting to new LED fixtures in lower level common areas. no work is being performed in occupied tenant suites under this permit. See COM-2124250 - Revision to fire alarm plans as a result of new interior walls in lower level corridors 005 and 008.
Phased Permit - 1130 K Street
EPC - (2) STORY OFFICE ADDITION OF (43,200 sf) TYPE 2B CONSTRUCTION OVER EXISTING (4) STORY TYPE 1A OFFICE BUILDING (135,580 sf). EXISTING BUILDING RETROFIT WORK UNDER SEPARATE PERMIT. - PLNG-INSP
Seismic Upgrade
EPC - Introduce new lateral system to existing 145,975 sf, 4-story building. New lateral force resisting system is combination of concrete shear walls and concentric steel brace frame in each direction. New lateral system designed to resist 100% of design seismic loads for entire structure. Proposed retrofit in preparation for two additional levels being added to top of existing building. Upper portion addition will be laterally braced by 2-way steel moment frame system. The two story addition will be performed under a separate permit. THE DEMO PERMIT IS COM-2011015.
Interior Demolition
EPC - Removal of existing interior non-structural walls, windows, doors, ceilings and finishes on floors 1 through 4. - PLNG-INSP
New lateral system to the existing 145,975 SF, 4-story building. the new lateral force resisting system consists of a combination of concrete shear walls and a concentric steel brace frame in each direction. the new lateral system is designed to resist 100% of the design seismic loads for the entire structure.;