Sacramento 95814 · Downtown · APN 006-0097-013-0000 · City of Sacramento
Zoned C-3-SPD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $735,000 ($647,000–$823,000).
Public building records show issued construction/renovation work on this parcel (41 total permits, latest Oct 20, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
162 substantial renovation & housing permits over 24 months (114.0 per 1,000 parcels vs. 30.4 citywide baseline) (#33 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Downtown)
all of the lot of the parcel intersects Zone X: minimal flood hazard. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$735,000
Benchmark range: $647,000 – $823,000
Closest lead: Canopy Hotel (440 ft S, in review). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$736/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 139 homes completed, 59 permitted, 56 proposed or in review (236 of them deed-restricted affordable).
9 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
561 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-3 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Entitled" for 7.8 yr (since Jan 7, 2019), with no new permit record in 7.8 yr. · 1 unit
In "Fee estimate" for 7.8 yr (since Jan 18, 2019), with no new permit record in 7.8 yr. · 218 units · $49,590,693 declared valuation
In "Fee estimate" for 7.6 yr (since Apr 10, 2019), with no new permit record in 7.6 yr. · $5,628,365 declared valuation
In "Entitled" for 7.3 yr (since Jul 31, 2019), with no new permit record in 7.3 yr. · 4 units
In "Fee estimate" for 7.2 yr (since Sep 13, 2019), with no new permit record in 7.2 yr. · $83,000,000 declared valuation
In "Entitled" for 6.9 yr (since Dec 9, 2019), with no new permit record in 6.9 yr. · 150 units
Nearby permit (92ce9e9971d0e5911950ad803bf38cbff381947a): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (c81c12e562583fd5031bf5fc1c1b2d3aae7067d0): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (c6ae48b6087da9b5c192cc94ff1dc2e33b894353): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1230 J St): Status changed from Temporary C of O to Expired Permit
Record COM-2508730 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1020 7th St): Status changed from Plan Check Wait to Plan Check Target
Record COM-2617999 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (1214 F St): First appeared in published agency feed
Record COM-2623185 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Status changed from Plan Check Target to Issued
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Issued date changed from (blank) to 2026-10-20
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Project name changed from 500 CAPITOL MALL - SUITE 1150, TENAN IMPROVEMENT to 500 CAPITOL MALL - SUITE 1050, TENANT IMPROVEMENT
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Contractor changed from (blank) to J SUTTER BUILDERS
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (909 3rd St): Status changed from Plan Check Wait to Verify
Record COM-2604549 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (1000 J St): Status changed from Issued to Expired Permit
Record COM-2504529 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (405 K St 170): Status changed from Plan Check Target to Ready-to-Issue
Record SIG-2619002 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (405 K St 170): Project name changed from SIGN to SIGN - SACRAMENTO KINGS TEAM STORE
Record SIG-2619002 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (555 Capitol Mall 1090): Status changed from Plan Check Target to Plan Check Wait
Record COM-2616737 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "In review" for 8.1 yr (since Oct 2, 2018), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (55 housing units, $90,000,000 declared valuation across 3 permits).
In "Entitled" for 5.5 yr (since May 26, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (10 housing units across 0 permits).
In "Fee estimate" for 7.8 yr (since Jan 18, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (218 housing units, $49,590,693 declared valuation across 1 permit).
In "Entitled" for 3.7 yr (since Mar 2, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (204 housing units across 0 permits).
In "In review" for 2.8 yr (since Jan 19, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (206 housing units, $61,800,000 declared valuation across 1 permit).
In "Entitled" for 6.9 yr (since Dec 9, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (150 housing units across 0 permits).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 1,421 parcels
−15.9% YoY
City baseline: 30.4 / 1k
162 in trailing 24m
Includes 3 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS LLC | Commercial tenant improvement | 21 on parcel254 in ½ mi | $42,091,233 | 39 vs 62 prior−37% |
| Marketone Builders | Commercial tenant improvement | 2 on parcel52 in ½ mi | $22,092,578 | 10 vs 13 prior−23% |
| Ap Thomas Construction | Commercial tenant improvement |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95814
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($7,350/yr) + local voter-approved bond debt ($1,029/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$35,671/yr
Cash needed: $161,700
NOI: $8,928/yr
P&I: $3,717/mo
For $0/mo net cash flow
At $2,125/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,955/mo | −$3,217/mo | -23.9% | $6,445/mo | −$3,205/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,125/mo | −$2,973/mo | -22.1% | $5,966/mo | −$2,841/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,253/mo | −$2,832/mo | -21.0% | $5,827/mo | −$2,563/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
SIGN MS
Fabricate & Install Face Lit, raceway mounted, Pan Channel Letter Sign "Parking"
REVISION TO FPP-2302573
EPC - EXPEDITED - REVISION TO FPP-2302573: Modify the perimeter walls that access the main suite with furred walls to enclose the FLS conduits that run vertically north/south through the elevator lobby. The FLS conduits have also been moved closer to the corner of the lobby to minimize the depth of the furred wall.
801 K Street REMODEL
EPC - EXPEDITED - TENANT IMPROVEMENT: ELEVATOR LOBBY. DEMO OF (E) FURRED CEILING, FLOOR FINISH,ELEVATOR DOOR FRAME AND REMOVAL OF EXISTING LIGHT FIXTURES. PROVIDE NEWLY ADDED WALL FINISH W/ REVEALS OVER EXISTING RATES WALLS, TIEL & CARPET AND NEW TRIM FOR ELEVATOR DOORS SEE REVISION FPP-2311380: Modify the perimeter walls that access the main suite with furred walls to enclose the FLS conduits that run vertically north/south through the elevator lobby. The FLS conduits have also been moved closer to the corner of the lobby to minimize the depth of the furred wall.
22nd Floor Remodel
EPC - EXPEDITED - MODIFYING MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE SPRINKLER AS NEEDED T0 ACCOMODATE NEW LAYOUT
FPP-801 K Street REMODEL
EPC - EXPEDITED - REMOVING (E) NON-LOAD BEARING CONSTRUCTION AND CONSTRCTION OF (N) NON-LOAD BEARING PARTITIONS. EXISTING CEILING, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE SPRINKLER ARE TO BE MODIFIED AS NEEDED TO ACCOMODATE FOR NEW TENANT'S LAYOUT.
801 K Street - Lobby Remodel
EPC - 3819 sf lobby renovation and expansion including new public restrooms at ground level and accessible path of travel upgrades for parking on level 3 in office building
FPP-801 K Street 13th Floor REMODEL
EXPEDITED - EPC - EXISTING TELECOM ROOM ON THE 14TH FLOOR TO BE RELOCATED TO THE EXISTING TELECOM ROOM ON THE 13TH FLOOR. EXISTING LAB ON THE 12TH FLOOR TO BE RELOCATED TO THE 13TH FLOOR.
REVISION TO FPP-2022546
EPC - REVISION TO FPP-2022546-TENANT REQUESTED CHANGES,Updated plan to show removal of (E) Storage room adjacent to the NW elevator. Removal, safe off and patch of all (E) electrical outlet throughout the floor Demolition RCP, Updated plan to indicate removal of existing ceiling as required to get a 9’ high ceiling in new corridor. ? All other ceiling removal is per the original permit documents (i.e., removal of all hard lid ceilings adjacent to perimeter windows and grid ceiling system in affected areas as shown).Update corridor due to removal of existing storage room. ? Derating the corridor ? Removal of office floor core electrical on RMR suite and replacing them with wall mounted outlets. ? Add electrical and telco board on Telco 2519. ? Provide notation to patch and repair any rated condition. ? Provide new huddle room (Huddle room 2511) with new millwork on RMR suite. ? Office walls where the ceiling will be reconfigured to align with the exterior window will be +6” above ceiling. New ceiling header at Huddle Room 2501 and Open Office 2522 ? Updated gypsum soffit detail. ? Office and conference rooms ceilings to be reconfigured to align to the exterior window line for new HVAC and Lighting layout. Provide glass door header for sliding barn door in offices. ? Noted that the door hardware for the office barn door will be lock ladder pulls. FIRE SPRINKLER to match
electrical
EPC - Install (46) CREE-ZR24 building standard fixture as per attached cut sheet on (1) D2 dimmer so lights can be controlled. This will give you the capability to split the lighting into (2) zones or every other fixture.
801 K Street Remodel to 25th floor.
EXPEDITED - EPC - tenant improvement consisting of new office remodel, tenant lounge and conference room including demolition and construction of non-load bearing partitions, reconfiguration of existing ceiling, new light fixtures, HVAC grills, new outlets and finishes. The existing mechanical, electrical and fire sprinkler are to be modified as needed to accommodate new layout. SEE REVISION FPP-2105284-TENANT REQUESTED CHANGES, Updated plan to show removal of (E) Storage room adjacent to the NW elevator. Removal, safe off and patch of all (E) electrical outlet throughout the floor Demolition RCP, Updated plan to indicate removal of existing ceiling as required to get a 9’ high ceiling in new corridor. ? All other ceiling removal is per the original permit documents (i.e., removal of all hard lid ceilings adjacent to perimeter windows and grid ceiling system in affected areas as shown).Update corridor due to removal of existing storage room. ? Derating the corridor ? Removal of office floor core electrical on RMR suite and replacing them with wall mounted outlets. ? Add electrical and telco board on Telco 2519. ? Provide notation to patch and repair any rated condition. ? Provide new huddle room (Huddle room 2511) with new millwork on RMR suite. ? Office walls where the ceiling will be reconfigured to align with the exterior window will be +6” above ceiling. New ceiling header at Huddle Room 2501 and Open Office 2522 ? Updated gypsum soffit detail. ? Office and conference rooms ceilings to be reconfigured to align to the exterior window line for new HVAC and Lighting layout. Provide glass door header for sliding barn door in offices. ? Noted that the door hardware for the office barn door will be lock ladder pulls. FIRE SPRINKLER to match
HVAC -Split System (2) -IT ROOM
EPC - Install two (2) new 3Ton ductless split units to server room with associated piping connections.
EXPEDITED - EPC - TI CONSISTS OF THE REMOVAL OF EXISITNG GUARD DESK/STATION AND CONSTRUCTION AND INSTALLATION OFNEW GUARD DESK/STATION WITH REVISED ELECTRICAL PER UPDATED GUARD STATION REQUIREMENTS. ADDITION OF TURNSTILES.
Remodel
EPC - TI CONSISTS OF THE REMOVAL OF EXISITNG GUARD DESK/STATION AND CONSTRUCTION AND INSTALLATION OFNEW GUARD DESK/STATION WITH REVISED ELECTRICAL PER UPDATED GUARD STATION REQUIREMENTS. ADDITION OF TURNSTILES.
Vehicle Barrier System
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
0.72 acres
Assessor's classification for assessment purposes. This is not zoning.
801 K ST; 801 K ST FL 22ND FL 22ND
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 006-0097-013-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| 3 on parcel19 in ½ mi |
| $8,256,722 |
| 0 vs 3 prior |
| Schetter Electric Merged: SCHETTER ELECTRIC INC · SCHETTER ELECTRIC LLC | Remodel / interior alteration | 1 on parcel15 in ½ mi | $1,076,300 | 2 vs 2 prior |
| Airco Mechanical | Remodel / interior alteration | 1 on parcel11 in ½ mi | $2,313,162 | 1 vs 3 prior |
| Ti Builders | Commercial tenant improvement | 2 on parcel8 in ½ mi | $1,227,820 | 0 vs 5 prior |
| Modern Building | Commercial tenant improvement | 2 on parcel2 in ½ mi | $290,000 | 0 vs 1 prior |
| Tecta America Sacramento | General repair | 2 on parcel2 in ½ mi | $24,500 | 0 vs 0 prior |
| Capitol Neon | Sign | 1 on parcel1 in ½ mi | $25,950 | 0 vs 0 prior |
| Viking Sign Installations | Sign | 1 on parcel1 in ½ mi | $4,975 | 0 vs 0 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Fire alarm / sprinklerOn this parcel | 2,312 | 8d | 14d | 29d | 71d | 13d(vs 15d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EPC - Revision to FPP-1816938 - modification of design at 8 locations due to existing conditions that were not allowing contractor to successfully install the auto restraints with the prior scope.
Vehicle Barrier System
Revision to FPP-1816938 - modification of design at 8 locations due to existing conditions that were not allowing contractor to successfully install the auto restraints with the prior scope.
Vehicle Barrier System
EXPEDITED - EPC Submittal - Remodel of Commercial Building - New vehicle barrier system will be provided at various locations along the perimeter of the parking levels within the existing garage. The system will consist of wires and poles.
Vehicle Barrier System
EPC Submittal - Remodel of Commercial Building - New vehicle barrier system will be provided at various locations along the perimeter of the parking levels within the existing garage. The system will consist of wires and poles.
EPC Submittal - Remodel of Commercial Building - New vehicle barrier system will be provided at various locations along the perimeter of the parking levels within the existing garage. The system will consist of wires and poles.
Revision To COM-1720217 : Adding missed section of Retractable Railing System
Revision To COM-1720217 : Adding missed section of Retractable Railing System-Retractable Railing system servicing the staircase that accesses the helipad yet can be retracted during window washing activity.
Revision
EXPEDITED - Revision to Com-1721503 revised electrical to provide door openers.
Level 2-7
EXPEDITED - New vehicle barrier system consisting of poles and wire rope. This barrier will only be provided at selected perimeter locations within the parking garage in levels 2-7
Guard Rail
EXPEDITED 7,3,3- Install retractable guard rail system at perimeter of existing helipad.
bathroom remodels
EXPEDITED - restroom upgrades new fixtures and finishes
fire sprinklers
reroute fire sprinkler line through beam stiffners and add sprinkler head due to obstruction by new stiffners
reinforcing slab
EXPEDITED 10-5-5 - structural work only to reinforce slab only for safe
25th and 26th Floor
EXPEDITED - 25th and 26th Floor, Infill existing openings at the 25th and 26th Floor
Tri Counties Bank SIGN PERMIT
Tri Counties Bank SIGN PERMIT: Install (2) Attached / illuminated LED Channel Letter Wall Displays
INTERIOR REMODEL
Interior Ten
revision 10Th and 11Th Floor
revision to FPP-1617387 revising interior wall layout, mechanical, electrical and fire.
EPC Submittal - Remodel of Commercial Building - Interior Tenant Improvement including mechanical, electrical and plumbing
10Th and 11Th Floor
EXPEDITED - 10Th and 11Th Floor, Interior remodel-Demo interior walls, new interior walls, new electrical receptacles, new supply and returns (revision FPP-1703620 changes to interior layout CRF 3-10-2017)
28TH Floor
EXPEDITED - 28TH Floor, Remove non bearing walls, ceiling grid to remain, lighting to be installed per new layout
DEPT OF CONSERVATION EXPANSION
LOCAL FIRE AUTHORITY ACCESS
24Th Floor
EXPEDITED - 24Th Floor, Demo walls and ceiling to accommodate new office layout, New walls, electrical, data, and new lighting layout. Ceiling grid and tiles to be replaced only if stained or damaged. Department of Conservation Expansion (SFM) to do the plan review and inspection
Accessibility Upgrades
EXPEDITED - Accessibility upgrades to East and West Stair enclosures from first floor to roof level. Remove and replace guard rails and hand rails. Re-stripe treads.
21st Floor Suite 2024
EXPEDITED 10,5,5 - Suite 2024 Adding steel beams to strengthen 21st floor for file storage.
Accessibility Upgrades
EXPEDITED - Accessibility upgrades limited to interior modification to restrooms in floors 8, 21, and 23. Accessibility upgrade for common areas only.
Department of Conservation, Suite 1401
EXPEDITED - Suite 1401, Interior office remodel for Department of Conservation: Minimal wall demo, construct new walls, new electrical and data locations, new lighting layout. New Ceiling t-bar at new wall locations. Replace ceiling tile only if damaged or stained. (State Agency: No City fire review or inspections).
Revision
Revision to FPP-1600689. Adding lost sheets back to approved set.
Interior Remodel 8th, 21st, 23rd
EXPEDITED - Interior remodel floors 8, 21, and 23. Department of Water Resources (Fire By State Fire Marshall). New partitions, with associated electrical, plumbing mechanical. Interior demolition of partitions is on a separate permit.
Interior Demo