Active in City of Sacramento (58 permits)
Raw permit filing aliases merged: SCHETTER ELECTRIC INC · SCHETTER ELECTRIC LLC
52 issued · 46 parcels
vs 10 prior 24m(−50%)
32 construction/remodel
Sum of permit job values
Application → issuance
Latest: May 14, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 26 | 26 | — | $1,855,252 | 24d (n=26) | 4d (21d p75) | Above 75th pct turnaround | |
| 11 | 11 | — | $592,627 | 0d (n=11) | 0d (0d p75) | Within typical range | |
| 9 | 6 | — | $313,245 | 23d (n=6) | 40d (91d p75) | Faster than peer median | |
| 6 | 6 | — | $608,207 | 27d (n=6) | 63d (119d p75) | Faster than peer median | |
| 3 | 0 | — | $19,655 | — | 41d (93d p75) | — | |
| 2 | 2 | — | $156,225 | 60d (n=2) | 33d (85d p75) | — | |
| 1 | 1 | — | $1,100,000 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 980 9th St City of Sacramento · APN 006-0036-031-0000 | HVAC / heat pump COM-2608879Portal ↗ | Issued May 14, 2026 10d review | Issued | $1,100,000 | EPC - 1.) Remove (1) 2,500A buss duct from switchboard #1 and replace it with 1,000A of temporary power via #4/0 DLO cable from switchboard #1 to a 1,000A temporary distribution board with (4) 400A circuit breakers, then from the 1,000A distribution boards to (4) different 400A panelboards per the drawing. 2.) Remove (1) 4,000A buss duct from switchboard #2 and replace it with 2,000A of temporary power via #4/0 DLO cable from switchboard #2 to distribution board on the Penthouse #1, we will tap the Conductors in the basement per CEC 240.21 (B) (1) and rise them up to the 14th floor to provide temporary power to ATS-2. 3.) After the 2,500A & 4,000A buss duct replacement parts arrive, we will remove the temporary power (switchboard fuses, #4/0DLO cables, distribution boards, panelboards, disconnects and fuses) and re-Install the buss ducts and re-energize the building to its original design. Filed as: SCHETTER ELECTRIC LLC |
| 251 Richards Blvd City of Sacramento · APN 001-0182-005-0000 | Other COM-2525595Portal ↗ | Issued Feb 17, 2026 74d review | Issued | $110,000 | EPC - INSTALLING (2) TWO NEW GATE OPERATORS TO SERVICE (2) TWO PROPOSED VEHICLE SLIDIDING GATES. THE SLIDING GATES WILL BE PART OF A NEW 6 FOOT HIGH WROUGHT IRON SECURITY FENCE LOCATED AT THE EXISTING FRONT PARKING AREA ALONG RICHARDS BLVD. THE BLACK WROUGHT IRON FENCING HAS A TOTAL LENGTH OF +/- 387'-0" LINEAR FEET, WHICH ALSO INCLUDES (1) ONE MAN GATE FOR FIRE DEPARTMENT AND EMPLOYEE ACCESS ALSO, INCLUDED ARE INSTALLATION OF (6) SIX PROPOSED TREES ALONG THE EXISTING PLANTER FACING RICHARDS BLVD AS WELL AS PROPOSED GROUND COVERS AND SHUBS BETWEEN PROPOSED TREES. IMPROVEMENTS TO THE EXISTING IRRIGATION AT EXISTING LANDSCAPE ALONG RICHARDS BLVD WILL ALSO BE INCLUDED IN THE SCOPE OF WORK. Filed as: SCHETTER ELECTRIC LLC |
| 801 J St City of Sacramento · APN 006-0036-038-0000 | EV charger COM-2600454Portal ↗ | Applied Jan 8, 2026 | Plan Check Wait | $75,168 | EPC - Install new 200 amp. feeder form MSB in the basement to 2nd level location. Install fuses if tied into MSB meter area to breaker if tied to other section. Install all conduit supports for the above conduit. Install (1) 223.6 KVA transformer on 2nd level. Install new 4000/3-120-208V panel with breakers. Install all anchors for supports. Install (1) 400 amp. panel to each of the (10) charging stations. Set all owner supplied charging stations. Install all wiring to each of (10) EV stations. Installed designed drawings for permit purposes. Pull permits for new system. Filed as: SCHETTER ELECTRIC LLC |
| 150 Commerce Cir City of Sacramento · APN 275-0270-018-0000 | Commercial tenant improvement COM-2524841Portal ↗ | Issued Dec 29, 2025 33d review | Finaled | $202,000 | EPC - EXPEDITED - INSTALL AND ANCHOR (5) PIECES OF EQUIPMENT IN EXISTING WAREHOUSE SPACE WITH REQUIRED ELECTRICAL, WATER, AND COMPRESSED AIR HOOKUPS. ROUGHLY 875 SF. This project involves the furnishing and installation of supply/return process cooling water and compressed air distribution piping from existing points of connection to four relocated owner furnished pieces of equipment. Also, furnish and install local isolation at each new connection to equipment and provide anchors to the equipment to the slab. No other changes or additions to the existing building. PC Cycle days 10, 5, 5, 5. Filed as: SCHETTER ELECTRIC LLC |
| 801 14th St City of Sacramento · APN 006-0055-001-0000 | Remodel / interior alteration COM-2508086Portal ↗ | Issued May 19, 2025 27d review | Finaled | $212,000 | EPC - Install Park Assist channel system; Install provided M5 cameras per drawings; Install provided PC's and Servers; Install 120v power for PCs; Run conduit and cords between floors for PCs; Run conduit to 1st connection point on channel system for each floor; Install Belden 1309A and 2146A or equal cable to each camera; Install provided CAT6A Cable between cameras; Install (2) provided fish eye cameras on top floor. Filed as: SCHETTER ELECTRIC LLC |
| 151 Commerce Cir City of Sacramento · APN 275-0251-035-0000 | Remodel / interior alteration COM-2404761Portal ↗ | Issued Aug 29, 2024 177d review | Finaled | $25,000 | EPC - Various electrical feeds to equipment Filed as: SCHETTER ELECTRIC LLC |
| 400 Capitol Mall City of Sacramento · APN 006-0144-029-0000 | EV charger COM-2406184Portal ↗ | Issued Apr 8, 2024 17d review | Finaled | $5,825 | EPC - DEMO EXISTING SMUD EV CHARGER. INSTALL NEW CLIPPER CREEK EV CHARGER IN EXISTING SMUD EV CHARGER LOCATION. See Revision COM-2410200; Summary of Changes: 1.) Changed names of Transformer TB1 & Panel LB1 to Transformer TEV1 & Panel EV1. 2.) Shifted XFMR TEV1 & PNL EV1 East aprox 5ft. REF Delta 1. Filed as: SCHETTER ELECTRIC LLC |
| 1527 N C St City of Sacramento · APN 001-0142-014-0000 | Electrical / panel COM-2319791Portal ↗ | Issued Oct 10, 2023 22d review | Finaled | $14,275 | EPC - Remove and replace the existing 100 amp 240 volt Main disconnect with new Main Breaker enclosure, Also, remove & replace (2) sub panels and (1) 30 amp disconnect with (1) 32 circuit sub panel. revision COM-2402316 SMUD meter to now be replaced with new. Filed as: SCHETTER ELECTRIC LLC |
| 1108 C St City of Sacramento · APN 002-0075-006-0000 | EV charger COM-2317482Portal ↗ | Issued Sep 22, 2023 36d review | Finaled | $57,926 | EPC - Install 2 new 200A metered panels to support 4 new 60A level 2 chargers & 2 new EV Charging posts. Filed as: SCHETTER ELECTRIC LLC |
| 1927 13th St City of Sacramento · APN 009-0084-015-0000 | Electrical / panel COM-2317941Portal ↗ | Issued Aug 23, 2023 0d review | Finaled | $11,349 | Electrical Permit: Replace one damaged 1600 amp 120/208 V breaker with exact working replacement. Filed as: SCHETTER ELECTRIC LLC |
| 8181 Cucamonga Ave City of Sacramento · APN 079-0430-039-0000 | Electrical / panel COM-2223580Portal ↗ | Issued Mar 8, 2023 124d review | Finaled | $339,400 | EPC. Install soccer field lighting based on 30 foot candle average including the below: MUSCO light structure system with total light control, four 70' galvanized steel poles and four pre cast concrete bases with integrated lighting grounding; control link and monitoring system to provide remote on/off and dimming control and performance monitoring with 24/7 customer support. Filed as: SCHETTER ELECTRIC LLC |
| 6045 Midway St City of Sacramento · APN 062-0010-040-0000 | Plan revision / deferred submittal COM-2303844Portal ↗ | Applied Feb 27, 2023 | Complete | $19,655 | EPC- REVISION TO COM-2226966- Provide connection of owner supplied dual head EV charger. Filed as: SCHETTER ELECTRIC LLC |
| 1010 8th St City of Sacramento · APN 006-0094-009-0000 | Electrical / panel COM-2302069Portal ↗ | Issued Feb 3, 2023 1d review | Finaled | $11,411 | SMUD electrical shut down to verify function of main breaker. SMUD electricity to be turned back on same day. Work to take place on Saturday, 2/4/23 @6:00 am. Filed as: SCHETTER ELECTRIC LLC |
| 6045 Midway St City of Sacramento · APN 062-0010-040-0000 | EV charger COM-2226966Portal ↗ | Issued Jan 5, 2023 20d review | Finaled | $19,655 | EPC - Provide connection to owner dual head EV charger. charger requires (2) 100/2 circuits. Provide connection from existing 112.5KVA transformer as indicated on plans. ** SEE REVISION COM-2303844- Provide connection of owner supplied dual head EV charger.** Filed as: SCHETTER ELECTRIC LLC |
| 1201 K St City of Sacramento · APN 006-0111-013-0000 | Remodel / interior alteration COM-2218259Portal ↗ | Issued Dec 29, 2022 125d review | Expired Permit | $40,000 | EPC - INSTALL (5) DUAL ELECTRIC VEHICLE CHARGING STATIONS AND (1) SINGLE CHARGING STATION IN SPECIFIED PARKING SPOTS · INSTALL NEW 75 KVA TRANSFORMER FED FROM EXISTING BREAKER IN EXISTING PANEL TO FEED NEW EV CHARGING PANELBOARD · RUN NEW CONDUIT AND WIRE TO EACH EV CHARGING STATION Filed as: SCHETTER ELECTRIC LLC |
| 1028 7th St City of Sacramento · APN 006-0087-071-0000 | Electrical / panel COM-2221548Portal ↗ | Issued Oct 10, 2022 0d review | Finaled | $16,850 | Ground Fault Testing / Certification. SMUD to shut off power to building to allow testing of systems by Apparatus." See attached detailed scope of work. Site address corrected 11-22-2022. Filed as: SCHETTER ELECTRIC LLC |
| 1931 E St City of Sacramento · APN 003-0123-008-0000 | EV charger COM-2219185Portal ↗ | Issued Oct 3, 2022 25d review | Finaled | $40,184 | EPC - INSTALL EV CHARGERS with associated equipment Filed as: SCHETTER ELECTRIC LLC |
| 1802 C St City of Sacramento · APN 003-0022-019-0000 | Remodel / interior alteration COM-2209872Portal ↗ | Issued Sep 30, 2022 142d review | Finaled | $157,745 | EPC - Rehabilitation of existing failed pavement and concrete, striping, and adding LED wall pack lighting. CYCLE 2: SCOPE REVISED TO REMOVE VEHICLE GATE Filed as: SCHETTER ELECTRIC LLC |
| 1510 16th St City of Sacramento · APN 006-0232-019-0000 | Remodel / interior alteration COM-2212627Portal ↗ | Issued Sep 1, 2022 78d review | Finaled | $6,580 | EPC - Add (2) accent light fixtures on exterior to light up wall art Filed as: SCHETTER ELECTRIC LLC |
| 222 20th St City of Sacramento · APN 003-0072-040-0000 | EV charger COM-2208066Portal ↗ | Applied Apr 15, 2022 | Expired Application | $40,184 | EPC - Provide and install EV Chargers Filed as: SCHETTER ELECTRIC LLC |
| 4701 Beloit Dr City of Sacramento · APN 238-0011-035-0000 | Other COM-2201682Portal ↗ | Issued Mar 10, 2022 45d review | Expired Permit | $46,225 | EPC - Installing 2 Motorized Gate Openers. Filed as: SCHETTER ELECTRIC LLC |
| 830 K St City of Sacramento · APN 006-0098-010-0000 | Commercial tenant improvement COM-2123051Portal ↗ | Issued Mar 3, 2022 128d review | Expired Permit | $18,375 | EPC - 3rd floor remodel work is new office furniture tables, chairs and desks. electrical run 10 new circuits for office equipment Filed as: SCHETTER ELECTRIC LLC |
| 2525 Natomas Park Dr City of Sacramento · APN 274-0042-025-0000 | EV charger COM-2121974Portal ↗ | Issued Oct 22, 2021 10d review | Expired Permit | $7,900 | EPC - Adding new SMUD meter for EV Chargers Filed as: SCHETTER ELECTRIC LLC |
| 400 Bannon St City of Sacramento · APN 001-0052-024-0000 | Electrical / panel COM-2117215Portal ↗ | Issued Aug 9, 2021 0d review | Finaled | $3,000 | Replace damaged service conductors from SMUD pull box to Buildings Main Service. Filed as: SCHETTER ELECTRIC LLC |
| 315 16th St City of Sacramento · APN 002-0094-008-0000 | Electrical / panel COM-2100396Portal ↗ | Issued Jul 7, 2021 181d review | Finaled | $76,242 | EPC - Provide security pole lighting to lot area which recently had the existing building demolished down to the foundation. wrecking permits issued under sperate permits. - PLNG-INSP Filed as: SCHETTER ELECTRIC LLC |