Sacramento 95814 · Downtown · APN 006-0144-029-0000 · City of Sacramento
Zoned C-3-SPD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $825,000 ($726,000–$924,000).
Public building records show issued construction/renovation work on this parcel (155 total permits, latest Oct 15, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
162 substantial renovation & housing permits over 24 months (114.0 per 1,000 parcels vs. 30.4 citywide baseline) (#33 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Downtown)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$825,000
Benchmark range: $726,000 – $924,000
Closest lead: 27 Story Residential Mixed Use (0.17 mi W, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$821/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 140 homes completed, 373 permitted, 75 proposed or in review (373 of them deed-restricted affordable); 1 demolition.
10 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
468 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-3 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Entitled" for 8.8 yr (since Feb 12, 2018), with no new permit record in 8.8 yr. · 1 unit
In "Entitled" for 8.7 yr (since Feb 21, 2018), with no new permit record in 8.7 yr. · 1 unit
In "Entitled" for 8.7 yr (since Mar 15, 2018), with no new permit record in 8.7 yr. · 1 unit
In "Entitled" for 8.6 yr (since Mar 26, 2018), with no new permit record in 8.6 yr. · 1 unit
In "Entitled" for 8.4 yr (since Jun 21, 2018), with no new permit record in 8.4 yr. · 1 unit
In "Entitled" for 8.3 yr (since Jul 9, 2018), with no new permit record in 8.3 yr. · 1 unit
Nearby permit (92ce9e9971d0e5911950ad803bf38cbff381947a): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (625 S St): First appeared in published agency feed
Record COM-2622257 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (906 2nd St): First appeared in published agency feed
Record COM-2622692 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (405 K St 110): Status changed from Processing to Issued
Record SIG-2618334 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (405 K St 110): Issued date changed from (blank) to 2026-10-19
Record SIG-2618334 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (405 K St 110): Project name changed from SIGN to SIGN - MUSUEM OF ILLUSIONS
Record SIG-2618334 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby fire alarm / sprinkler (1020 7th St): First appeared in published agency feed
Record COM-2623184 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (925 L St): Status changed from Plan Check Target to Issued
Record FPP-2621329 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (925 L St): Issued date changed from (blank) to 2026-10-06
Record FPP-2621329 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby repair tied to a housing/code case (910 2nd St): First appeared in published agency feed
Record COM-2623312 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (501 J St): Status changed from Plan Check Wait to Ready-to-Issue
Record COM-2619121 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (501 J St): Description text was updated
Record COM-2619121 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (660 J St): Status changed from Plan Check Target to Complete
Record COM-2614893 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (405 K St 110): Status changed from Plan Check Wait to Process Wait
Record COM-2620468 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (555 Capitol Mall 1200): Status changed from Plan Check Wait to Issued
Record FPP-2617830 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Fee estimate" for 5.3 yr (since Aug 11, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (231 housing units, $112,000,000 declared valuation across 3 permits).
In "In review" for 8.1 yr (since Oct 2, 2018), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (55 housing units, $90,000,000 declared valuation across 3 permits).
In "Fee estimate" for 3.9 yr (since Jan 3, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (300 housing units, $85,000,000 declared valuation across 1 permit).
In "Entitled" for 7.9 yr (since Jan 3, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (120 housing units across 0 permits).
In "Fee estimate" for 7.8 yr (since Jan 18, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (218 housing units, $49,590,693 declared valuation across 1 permit).
In "Entitled" for 5.5 yr (since May 26, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (10 housing units across 0 permits).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 1,421 parcels
−15.9% YoY
City baseline: 30.4 / 1k
162 in trailing 24m
Includes 3 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS LLC | Commercial tenant improvement | 43 on parcel205 in ½ mi | $31,071,870 | 39 vs 62 prior−37% |
| Marketone Builders | Commercial tenant improvement | 9 on parcel61 in ½ mi | $23,785,801 | 10 vs 13 prior−23% |
| Pacific Ridge Builders | Commercial tenant improvement |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95814
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($8,250/yr) + local voter-approved bond debt ($1,155/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$42,158/yr
Cash needed: $181,500
NOI: $7,902/yr
P&I: $4,172/mo
For $0/mo net cash flow
At $2,125/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,955/mo | −$3,757/mo | -24.8% | $7,200/mo | −$3,753/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,125/mo | −$3,513/mo | -23.2% | $6,664/mo | −$3,388/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,253/mo | −$3,373/mo | -22.3% | $6,509/mo | −$3,111/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Expired / withdrawnApr 29, 2019 – Apr 29, 2019
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
Wells Fargo Center - Fire Alarm Control Panel Replacement
Replace the existing fire alarm control unit (FACU), remote transponders, and Truesite workstation in their existing locations. Consistent with the intent of OSFM interpretation 26-05 regarding the replacement of obsolete fire alarm control equipment, existing field devices are generally intended to remain in service. Replacement devices shall be provided on a like-for-like basis where practicable to maintain the existing system design and operation. Construction Type VB Occupancy B.
Deloitte
EXPEDITED - EPC - Deloitte remodel to the 21st floor (16,848 sf)
REMODEL
EPC - EXPEDITED - Interior improvement of corporate office Including: demolition of existing walls, new walls, doors, finishes lighting and ceilings. Re-worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
400 CAPITOL / EXIT SIGNS
EPC - Updating and modifying the exit signage to align with current egress plan.
400 CAPITOL / REMODEL
EXPEDITED - EPC - Interior improvement for corporate office-Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Re worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
400 CAPITOL / REMODEL
EPC - Interior improvement for corporate office-Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Re worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
REMODEL
EPC - EXPEDITED - Interior improvement for corporate office-Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Re worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
Stair Removal - Suite 2200
EXPEDITED - EPC - Demolition and infill of existing convenience stairwell.
REMODEL
Interior improvement for corporate office-Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Re worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
REMODEL
EPC - EXPEDITED - Interior Improvement for corporate office. Demolition of existing construction and new construction including walls, doors, finishes, lighting and ceilings. Re worked mechanical, electrical and fire protection to accommodate new layout.
Interior Remodel (Suites 2500 / 2580)
EPC - EXPEDITED - Interior improvement for corporate office-Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Re worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
FPP INTERIOR REMODEL - 400 CAPITOL MALL (Ste 1400)
EPC - EXPEDITED - Interior improvement for corporate office-Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Re worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
Interior Remodel (SUITE 1750)
EPC - EXPEDITED - Interior improvement for corporate office-Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Re-worked mechanical, electrical, plumbing and fire protection to accommodate new layout.
REVISON TO FPP-2510760
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
2.39 acres
Assessor's classification for assessment purposes. This is not zoning.
400 CAPITOL MALL; 400 CAPITOL MALL STE 1000 STE 1000; 400 CAPITOL MALL STE 1100 STE 1100
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 006-0144-029-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| 16 on parcel30 in ½ mi |
| $19,131,144 |
| 46 vs 10 prior+360% |
| Ap Thomas Construction | Commercial tenant improvement | 1 on parcel20 in ½ mi | $7,216,722 | 0 vs 3 prior |
| Johnson Controls Fire Protection | Fire alarm / sprinkler | 11 on parcel12 in ½ mi | $1,512,694 | 0 vs 1 prior |
| Schetter Electric Merged: SCHETTER ELECTRIC INC · SCHETTER ELECTRIC LLC | Remodel / interior alteration | 4 on parcel12 in ½ mi | $949,282 | 2 vs 2 prior |
| Rudolph And Sletten | Commercial tenant improvement | 4 on parcel11 in ½ mi | $81,561,754 | 3 vs 3 prior |
| Roebbelen Contracting | Commercial tenant improvement | 1 on parcel10 in ½ mi | $4,730,104 | 8 vs 10 prior−20% |
| Airco Mechanical | Remodel / interior alteration | 4 on parcel8 in ½ mi | $1,660,187 | 1 vs 3 prior |
| Dekreek Construction | Remodel / interior alteration | 5 on parcel7 in ½ mi | $1,674,051 | 6 vs 9 prior−33% |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| DemolitionOn this parcel | 705 | 0d | 1d | 7d | 35d | 2d |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EPC - REVISON TO FPP-2510760- Revised fire sprinkler plan to show reduced scope.
SUITE 2640
EPC - EXPEDITED - SUITE 2640 remodel - Minor Demolition, new interior partitions, related mechanical, electrical, plumbing, fire alarm and fire sprinkler.
REVISION
EPC - EXPEDITED - revision to FPP-2506977 Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Reworked mechanical, electrical, plumbing and fire protection to accommodate new layout.
REVISION - Deloitte Sacramento SPOG Remodel
EPC - REVISION TO COM-2410705. Relocate Fire alarms per inspector.
Interior Remodel (22nd Floor)
EPC - EXPEDITED (10-7-5) - INTERIOR IMPROVEMENT FOR CORPORATE OFFICE –DEMOLITION OF EXISTING CONSTRUCTION AND NEW CONSTRUCTION INCLUDES WALLS, DOORS, FINISHES, LIGHTING AND CEILINGS. REWORKED MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION TO ACCOMMODATE NEW LAYOUT. revision FPP-2513654 Demolition of existing construction and new construction includes walls, doors, finishes, lighting and ceilings. Reworked mechanical, electrical, plumbing and fire protection to accommodate new layout.
Interior Remodel (Suite 2600)
EPC - Tenant improvements to existing 5885-sq ft office space suite.
INTERIOR DEMOLITION FLOORS 21 & 22
EPC - DEMOLITION OF EXISTING NON-BEARING INTERIOR WALLS ON 21ST & 22ND FLOORS FOR FUTURE TENANT IMPROVEMENTS.
400 CAPITAL MALL
EPC - Removal of existing AC unit and installation of new modular self-contained AC unit, of the same capacity, in the same location. Installation of new pair of doors on hallway to access new unit.
remodel
EPC - EXPEDITED - Refresh of elevator lobby on 27th floor.
REMODEL - 400 Capitol Mall Suite 1560
EPC - EXPEDITED - 400 Capitol Mall - Suite 1560 Tenant Improvement, minor demolition, new interior partitions with related electrical, mechanical, plumbing and fire sprinkler/alarm.
Deloitte Sacramento SPOG Remodel
EXPEDITED - EPC - PROJECT IS INTERIOR TENANT IMPROVEMENT OF LEVEL 27 IN A 30-STORY EXISTING BUILDING. NEW CONSTRUCTION INCLUDES NEW OPEN OFFICE, ENCLOSED OFFICES, MEETING ROOMS, CONVENIENCE ALL-GENDER RESTROOM, AND A PANTRY WITH SEATING. NEW PROJECT SCOPE IS APPROXIMATELY 16,948 SQUARE FEET. NO EXTERIOR WORK. SCOPE OF WORK DOES NOT ALTER EXISTING BUILDING EXTERIOR SKIN, EXISTING BUILDING HEIGHT, EXISTING BUILDING AREA, EXISTING BUILDING EXIT ACCESS / EXIT STAIRS / EXIT DISCHARGE CONFIGURATION OR CAPACITY. PROJCT DOES NOT CHANGE OCCUPANCY CLASSIFICTION AND USE GROUP. INCLUDES STRUCTURAL SUPPORT FOR OPERABLE DOORS AND WINDOWS.
REVISION - Ceiling Hanger - 400 Capitol Mall, Ste 1200 Remodel
EPC - REVISION TO COM-2404754. Revised ceiling hanger wire detail from drilled anchors to shot pins. Sheet A9.5.1
bathroom remodel
EPC - EXPEDITED - TENANT IMPROVEMENT ON THE 27TH FLOOR. WORK INCLUDES PLUMBING FIXTURES, LIGHTING, AND FINISHES IN EXISTING COMMON AREA RESTROOMS. NO CHANGE TO EXISTING CONSTRUCTION TYPE, OCCUPANCY OR EGRESS
400 Capitol Mall Building - Suite 1200 Remodel
EPC - EXPEDITED - SCOPE OF WORK INCLUDES CUSTOM INTERIOR IMPROVEMENTS FOR CALIFORNIA EARTHQUAKE AUTHORITY OFFICE - DEMOLITION OF EXISTING CONSTRUCTION. INSTALLATION OF NEW WALLS, GLAZED PARTITIONS, DOORS, FINISHES, LIGHTING AND DRYWALL AND T-BAR CEILINGS. CUSTOM RECEPTION AND CAFE WITH NEW MILLWORK. MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION REWORKED TO ACCOMMODATE NEW LAYOUT.
Revision to COM-2406184
EPC - Revision to COM-2406184 Summary of Changes: 1.) Changed names of Transformer TB1 & Panel LB1 to Transformer TEV1 & Panel EV1. 2.) Shifted XFMR TEV1 & PNL EV1 East aprox 5ft. REF Delta 1.
EV CHARGER
EPC - DEMO EXISTING SMUD EV CHARGER. INSTALL NEW CLIPPER CREEK EV CHARGER IN EXISTING SMUD EV CHARGER LOCATION. See Revision COM-2410200; Summary of Changes: 1.) Changed names of Transformer TB1 & Panel LB1 to Transformer TEV1 & Panel EV1. 2.) Shifted XFMR TEV1 & PNL EV1 East aprox 5ft. REF Delta 1.
HHW PUMP REPLACEMENT
EPC - Replacement two (2) existing HHW pumps / VFDs with associated components and reconnect to existing piping. Area of room is 555sqft.
Fire Alarm Upgrade
EPC - Add smoke detectors in beam pockets as needed; add (3) relays in each elevator machine room for Mid-rise, Freight and Parking elevators for recall and firemen's hat.
SUITE 2060 REMODEL
EXPEDITED - EPC - SUITE 2060 - Remodel to include new walls, doors, finishes, mechanical, electrical, lighting, fire protection reworked to accommodate new layout.
400 CAPITOL MALL 14TH FLOOR - FIRE ALARM
EPC - Modify existing fire alarm system. Upgrade existing fire alarm transponder to a new network node 4. Network to the 9th floor node 3 and connect the 18th floor fire alarm transponder to new 14th floor network node 4 as shown on plans.
400 Capitol Mall HVAC
EPC - Demolition and disposal of the two existing units, and installation of two new like for like Daikon water source heat pumps.
400 CAPITOL MALL #2800 - TENANT SPACE REMODEL
EPC - EXPEDITED - SUITE #2800 REMODEL - Demo non-structural partitions, ceilings, and finishes. Rebuild new non-structural partitions, new and revised HVAC, electrical, plumbing.
28TH FLOOR COMMON AREA/RESTROOM - REMODEL
EPC - EXPEDITED - TENANT IMPROVEMENT ON THE 28TH FLOOR. WORK INCLUDES FIXTURES AND FINISHES IN EXISTING COMMON AREA RESTROOMS. NO CHANGE TO EXISTING CONSTRUCTION TYPE, OCCUPANCY OR EGRESS
ACUMEN - SUITE 2000 REMODEL
EPC - EXPEDITED - FPP - STE 2000 - demise suite, minor int. demo, new int partitions w/related elec, mech, sprinkler, alarm
fire equipment
EPC - MODIFY EXISTING FIRE ALARM SYSTEM: PROVIDE (4) NEW CONTROL RELAYS TO RELEASE (4) DELAY EGRESS DOORS INSTALLED BY OTHERS. Suite #2400
REVISION TO FPP-2300803
EPC - EXPEDITED - REVISION TO FPP-2300803- RELOCATE EXISTING FIRE DAMPER- PER FIELD CORRECTION NOTICE
Suite 2150
EPC - EXPEDITED - TENANT IMPROVEMENT - NEW WALLS, DOORS, FINISHES, MECHANICAL,ELECTRICAL, PLUMBING,FIRE PROTECTION REWORKED TO ACCOMMODATE NEW LAYOUT SEE REVISION FPP-2306590-RELOCATE EXISTING FIRE DAMPER
suite 2400-remodel
EPC - EXPEDITED - 400 Capital Mall Suite 2400 - Interior tenant improvements on floor 24 of an existing 30 story high rise building. Reconfiguration of space. The addition of partition and doors and the reconfiguration / extension of mechanical, electrical and plumbing systems. Construction of new partitions, ceilings, finishes, mechanical, electrical and plumbing.
FPP-400 CAPITOL MALL SUITE 32400 REMODEL
EPC - EXPEDITED - 400 Capital Mall Suite 2400 - Interior tenant improvements on floor 24 of an existing 30 story high rise building. Reconfiguration of space. The addition of partition and doors and the reconfiguration / extension of mechanical, electrical and plumbing systems. Construction of new partitions, ceilings, finishes, mechanical, electrical and plumbing.
STAIR DEMO
EXPEDITED - EPC - Demo common staircase between the 27th and 28th floor suites and performing deck infill work to allow both floors to be leased separately.
24th Floor
EPC - EXPEDITED - 24TH FLOOR COMMON AREA RESTROOMS REMODEL. NEW FLOOR AND WALL FINISHES, LIGHTING AND PLUMBING FIXTURES
400 Capitol Mall 15th & 25th Floor REMODEL
EPC - EXPEDITED - TENANT IMPROVEMENT IN 15TH AND 25TH FLOORS. WORK INCLUDES FIXTURES AND FINISHES IN EXISTING COMMON AREA RESTROOMS, ELEVATOR LOBBY, AND CORRIDORS. NO CHANGE TO EXISTING CONSTRUCTION TYPE, OCCUPANCY OR EGRESS
fire equipment
Demo existing fire alarm devices; add smoke detectors in beam pockets s needed; add (3) relays in each Elevator Machine room for Midrise, Freight and Parking elevators for recall primary, alternate and fireman's hat.
fire equipment
EPC - Demo existing fire alarm devices; add smoke detectors in beam pockets s needed; add (3) relays in each Elevator Machine room for Midrise, Freight and Parking elevators for recall primary, alternate and fireman's hat.
remodel
EPC - ENCLOSE EXISTING STAIRCASE BETWEEN THE 28TH AND 29TH FLOORS
400 Capitol Mall - Install Sign (Wells Fargo)
Installation of window sign to be installed at the entrance - Wells Fargo
FPP-400 Capitol Mall REMODEL
EPC - EXPEDITED - Tenant Improvement Remodel, new millwork, sheetrock ceiling in Lobby, electrical, FS
POOL HEATER
EPC - Replacing the existing gas fired pool heater with an equivalent, current model.
Fire Alarm System 7th Floor
EPC - Install new fie alarm devices and relocate existing devices to accommodate remodel on the 7th floor
Fire Alarm Modification (Floor 27)
EPC - Fire equipment only modify existing fire alarm system: Demo existing devices located in demo area and install a backbone with addressable notification / smoke coverage for open space whitebox. Replace devices with addressable in common areas as shown on drawings. All new wiring to be class B the existing fire alarm system shall not be disconnected or taken out of service without written permission from the owner.
FPP - 400 Capitol Mall #1500
EPC - EXPEDITED - Suite #1500 Construction of 2 New Non-Bearing Walls and Removal of Non-Bearing Walls. Scope Includes New Cosmetic Finishes, 1 New Door, and Minor Alterations to Existing Electrical, Mechanical, and Plumbing Systems to Suit New Layout Design. No Change of Use, Construction Type or Egress.
EOTC interior demo
EXPEDITED - EOTC interior demo 27th Floor
Fire Alarm Modification (Floors 9, 14, 18)
EPC - Floors - 9, 14, 18 - Modify Existing Fire Alarm System: Upgrade existing Fire Alarm Transponder to a New Network Node 4. Network to the 9th Floor Node 3, and Connect the 18th Floor Fire Alarm Transponder to New 14th Floor Network Node 4. No New Devices. All New Wiring to be Class B.
CA STATE TRANSPORTATION AGENCY - REMODEL
EPC - CONSTRUCTION OF 3 NEW NON BEARING WALLS, AND REMOVAL OF 1 NON BEARING WALL. SCOPE INCLUDES NEW COSMETIC FINISHES THROUGHOUT TENANT SUITE, 2 NEW DOORS, NEW PLASTIC LAMINATE MILLWORK, AND MINOR MODIFICATIONS TO ELECTRICAL, MECHANICAL, AND PLUMBING SYSTEMS TO SUIT NEW LAYOUT. NO CHANGE OF EXISTING CONSTRUCTION TYPE, OCCUPANCY GROUP, OR EGRESS
REVISION TO COM-2117230
EPC - REVISION TO COM-2117230: CLARIFICATION #1R-REMODEL OF EXISTING MEETING ROOMS AND "CONVERSION" OF OFFICES TO MEETING ROOMS. LED LIGHTING UPGRADES AND MECHANICAL AND ELECTRICAL WORK IN AFFECTED AREAS ONLY. (2,458 S.F.)
remodel
EPC - 7th floor Interior Remodel of existing meeting rooms, conversion of few offices to meeting rooms, breakroom remodel. Affected rooms only: LED lighting upgrades and mechanical, electrical, plumbing and fire equiopment revision COM-2200511: CLARIFICATION #1R-REMODEL OF EXISTING MEETING ROOMS AND "CONVERSION" OF OFFICES TO MEETING ROOMS. LED LIGHTING UPGRADES AND MECHANICAL AND ELECTRICAL WORK IN AFFECTED AREAS ONLY. (2,458 S.F.)
WELLS FARGO ADVISORS - REMODEL
EXPEDITED - EPC - FPP - STE 2100 DEMISE, MINOR DEMO, NEW INTERIOR PARTITIONS, W/RELATED ELEC, MECH, FIRE SPRINKLER, & FIRE ALARM.
FPP-400 CAPITOL MALL Suite #2550 REMODEL
EPC - FPP - TI- DEMISE SUITE 2550, NEW DEMISING WALL W/RELATED MECH, FIRE. NO PLUMBING. NO ELEC. - ELEC SPLIT IS EXISTING.
400 CAPITOL MALL #2340
EPC - EXPEDITED - FPP - DEMO PERMIT - STE 2340 - REMOVE INTERIOR PARTITIONS FLOORING AND MILLWORK
400 CAPITOL MALL #1260 REMODEL
EPC - FPP - STE 1260 - EXPANSION W/NEW INTERIOR PARTITIONS W/RELATED ELEC, MECH, FIRE
FPP REVISION TO APPROVED PERMIT FPP1925451
EXPEDITED - EPC - FPP REVISION TO APPROVED PERMIT FPP1925451. NEW SCOPE INCLUDES Removing all previous scope of work except for the 23rd floor Restroom and Suite 2340 double entry doors.
Fire Equipment Installation
EPC - Remove (1) existing smoke detector; replace (1) existing notification device with (1) new notification device; add (1) new smoke detector & base and (3) new control relays to recall elevator.
400 Capitol Mall 23rd floor elevator lobby remodel
EPC - Electrical Permit only: installing 5 can lights into the 23rd floor elevator lobby.
SUITE 2640
EPC - REVISION TO FPP-2005068, LEAVE THE EXISTING WALL 1/2 INCH BELOW THE EXISTING T BAR, NEW FIRE SPRINKLER DRAWING (DIFFERENT ENGINEER) SAME SCOPE. CHANGED CEILING TO INCLUDE ALL NEW TILE IN EXPANSION AREA
Suite 2640
EXPEDITED - EPC - Suite 2640, Interior tenant remodel: Demolition, new partitions, related electrical, mechanical, fire alarm, sprinkler,
Revision Suite 650
EPC - Revision to FPP-2005581, All new HVAC ducting to be of rigid duct with a maximum of 5 foot of flexible duct to register.
Suite 650
EXPEDITED - EPC - Suite 650, EXPANSION OF EXISTING SUITE. REMODEL OF EXPANSION SPACE SHALL INCLUDE:NEW WALLS; DOORS; CEILING; FINISHES; AND MECHANICAL,ELECTRICAL, PLUMBING, AND FIRE PROTECTION TO ACCOMMODATE NEW LAYOUT
26Th Floor
EXPEDITED - EPC - 26Th Floor, Remodel of Commercial Building - UPDATE EXISTING RESTROOMS FOR ACCESSIBILITY: INCLUDING DEMO, NEW INFILL PARTITIONS, ELECTRICAL & FIRE SPRINKLER. NO MODIFICATIONS FOR HVAC
23RD FLOOR FIRE ALARM
EPC Submittal - Remodel of Commercial Building - 23RD FLOOR: Replace or add (12) new smoke sensors, (1) new relay, (18) new speaker/strobes and (2) door holders.
26Th Floor
26Th Floor, Remodel of Commercial Building - UPDATE EXISTING RESTROOMS FOR ACCESSIBILITY: INCLUDING DEMO, NEW INFILL PARTITIONS, ELECTRICAL & FIRE SPRINKLER. NO MODIFICATIONS FOR HVAC
Suite 2340
EXPEDITED - EPC - Remodel of Commercial Building - RESTROOM REMODEL WITH RELATED DEMO, ELECT, HVAC, LOBBY & SUITE 2340- ADD DOUBLE DOOR ENTRY, DEMO, INFILL PARTITIONS, ELECT & HVAC. SEE REVISION FPP-2021148- NEW SCOPE INCLUDES Removing all previous scope of work except for the 23rd floor Restroom and Suite 2340 double entry doors.
REVISION TO FPP-1916544 - Suite 600
EXPEDITED - REVISION TO FPP-1916544 to remove panic hardware
EPC Submittal - Remodel of Commercial Building - Replace or add (12) new smoke sensors, (1) new relay, (18) new speaker/strobes and (2) door holders.
Suite 2340
EPC Submittal - Remodel of Commercial Building - FPP- RESTROOM REMODEL WITH RELATED DEMO, ELECT, HVAC LOBBY & SUITE 2340- ADD DOUBLE DOOR ENTRY, DEMO, INFILL PARTITIONS ELECT & HVAC
Suite 2350
EXPEDITED - EPC - Suite 2350, Remodel of Commercial Building - Non-structural tenant improvement project in a fully sprinklered high-rise building. The work involves the demolition of existing partitions, new partitions, flooring, paint, and ceiling work.
REVISION TO FPP-1919519
EXPEDITED - REVISION TO FPP-1919519: UPDATE PLANS TO REFLECT FIELD CONDITIONS (AS BUILTS)
23rd Floor
EXPEDITED - EPC - 23rd Floor, Remodel of Commercial Building - FPP SUBMITTAL NEW DEMISING WALL INCLUDING DEMO, NEW PARTITIONS, RELATED ELECT, FIRE SPRINKLER, & FIRE ALARM. NO HVAC MODIFICATIONS
23rd Floor
23rd Floor, Remodel of Commercial Building - FPP SUBMITTAL NEW DEMISING WALL INCLUDING DEMO, NEW PARTITIONS, RELATED ELECT, FIRE SPRINKLER, & FIRE ALARM. NO HVAC MODIFICATIONS
REVISION TO FPP-1907717
EXPEDITED - REVISION TO FPP-1907717: Removal of Single Water Closet in Women's Restroom
Suite 2650
EXPEDITED - EPC - Suite 2650, Remodel of Commercial Building - FPP- MINOR TENANT IMPROVEMENT, INCLUDING DEMO, NEW INTERIOR PARTITIONS, RELATED ELEC, MECH AND SPRINKLER. SEE REVISION COM-1923956: UPDATE PLANS TO REFLECT FIELD CONDITIONS (AS BUILTS)
Suite 2650
Suite 2650, Remodel of Commercial Building - FPP- MINOR TENANT IMPROVEMENT, INCLUDING DEMO, NEW INTERIOR PARTITIONS, RELATED ELEC, MECH AND SPRINKLER.
Suite 2350
Suite 2350, Remodel of Commercial Building - Non-structural tenant improvement project in a fully sprinklered high-rise building. The work involves the demolition of existing partitions, new partitions, flooring, paint, and ceiling work.
Suite 600
EXPEDITED - EPC - Suite 600, Remodel of Commercial Building - INCLUDES CONSTRUCTION OF NEW NON-BEARING PARTITION AND ADDITION OF A NEW DOOR WITHIN EXISTING SUITE ON THE 6TH FLOOR. NO CHANGE IN USE AND OCCUPANCY (see revision FPP-2000491 to remove panic hardware - 1/10/20 - NCB)
Suite 600
Suite 600, Remodel of Commercial Building - INCLUDES CONSTRUCTION OF NEW NON-BEARING PARTITION AND ADDITION OF A NEW DOOR WITHIN EXISTING SUITE ON THE 6TH FLOOR. NO CHANGE IN USE AND OCCUPANCY
Suite 1700
EPC - Revision to Issued Permit COM-1906788 - OLD ELECTRICAL SHEETS DID NOT SHOW LIGHTING LAYOUT, NEW REVISED ELECTRICAL SHEETS NOW SHOW LIGHTING LAYOUT
Suite 1700
Revision to Issued Permit COM-1906788 - OLD ELECTRICAL SHEETS DID NOT SHOW LIGHTING LAYOUT, NEW REVISED ELECTRICAL SHEETS NOW SHOW LIGHTING LAYOUT
8TH & 9TH FLOOR
EPC - Revision to permit #FPP-1907717. remodel sprinkler and alarm layout. Change to Fire Sprinkler Contractor
8TH & 9TH FLOOR
Revision to permit #FPP-1907717. remodel sprinkler and alarm layout. Change to Fire Sprinkler Contractor
Suite 1700
EXPEDITED 5,5,5,5, - EPC - Suite 1700, Minor tenant remodel, with minor demo, new interior partitions with related electrical, mechanical and fire.
8TH & 9TH FL STAIRS
EXPEDITED - EPC Submittal - Installation of (N) interior connecting stair between 8th and 9th floor only. Remodel to include, structural work, stairs, railings, furnishings and finishes. No change to other floors in building or existing egress path to street. All MEP, fire alarm and structural work shall be under separate permit. No changes to exterior facade.
8TH & 9TH FLOOR
EXPEDITED - EPC - 8TH & 9TH FLOOR, Remodel of Commercial Building - Interior tenant improvement to an existing office spaces on the 8th floor (22,151sf) and 9th floor (22,,198sf) for tenant, We Work. Remodel to include new partitions, lighting, Finishes and furnishing, mechanical, electrical, and plumbing. (SEE REVISION FPP-1921569: Removed Single Water Closet from Women's Restroom)
Suite 2060
EXPEDITED - EPC - Suite 2060, Remodel of Commercial Building - INTERIOR IMPROVEMENTS ON THE 20TH FLOOR WITHIN AN EXISTING BUILDING OFFICE SUITE INCLUDING BREAK ROOM REMODEL
Interior demolition
EXPEDITED - Interior demolition of the 8th and 9th floors limited to demolition of all non structural partitions, flooring, ceilings, furnishings and finishes. No other work to be done with this permit.
Suite 2060
Suite 2060, Remodel of Commercial Building - INTERIOR IMPROVEMENTS ON THE 20TH FLOOR WITHIN AN EXISTING BUILDING OFFICE SUITE INCLUDING BREAKROOM REMODEL
Interior demolition
Interior demolition on 8th and 9th floors. Demolition limited to non structural partitions, flooring, ceilings, furnishings, and finishes. No other work to be done with this permit.
Suite 1700
EPC Submittal - Remodel and Change of Use of Commercial Building - Minor tenant remodel, with minor demo, new interior partitions with related electrical, mechanical and fire
8TH & 9TH FLOOR STAIR
Remodel of Commercial Building - Proposed staircase going from the 8th to the 9th floor for new tenant, We Work.
8TH & 9TH FLOOR
8TH & 9TH FLOOR, Remodel of Commercial Building - Interior tenant improvement to an existing office spaces on the 8th floor (22,151sf) and 9th floor (22,,198sf) for tenant, We Work. Remodel to include new partitions, lighting, Finishes and furnishing, mechanical, electrical, and plumbing.
6th Floor
EXPEDITED - EPC Submittal - Remodel of Commercial Building - 6TH FLOOR COMMON AREA RESTROOMS REMODEL. NEW FLOOR AND WALL FINISHES, LIGHTING, AND FIXTURES
EPC Submittal - Remodel of Commercial Building - 6TH FLOOR COMMON AREA RESTROOMS REMODEL. NEW FLOOR AND WALL FINISHES, LIGHTING, AND FIXTURES
Revision to FPP-1818790
Revision to fire alarm reference to CSG-18F-4421
Suite 1560
Revision to Issued Permit FPP-1812441 - ADA improvements included framing, plumbing, and restroom accessories
Suite 1560
EXPEDITED - EPC - Revision to Issued Permit FPP-1812441 - ADA improvements included framing, plumbing, and restroom accessories
BRANCH CIRCUIT FOR UPS
EXPEDITED - Install new dedicated branch circuit from existing sub panel to Data room down the hall from electrical room. Connect to existing UPS.
Suite 750
EXPEDITED - EPC - Suite 750, Tenant improvement, including demo, new partitions, electrical, related HVAC and fire sprinkler.
Suite 650
EXPEDITED - EPC - Suite 650, REMODEL AND EXPANSION OF EXISTING SUITE. WORK SHALL INCLUDE: NEW WALLS; DOORS; CEILING; FINISHES; AND MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION TO ACCOMMODATE NEW LAYOUT
EPC Submittal - Remodel of Commercial Building - Revised plans showing required 30th floor structural beams to accommodate existing conditions. Revision to Com-1811673
Orrick Herrinton Revision
EPC Submittal - Remodel of Commercial Building - Revised plans showing required 30th floor structural beams to accommodate existing conditions. Revision to Com-1811673
Suite 750
Suite 750, Tenant improvement, including demo, new partitions, electrical, related HVAC and fire sprinkler.
Suite 1560
EPC - Provide temporary compliant restroom access from 15th Floor to 7th Floor restrooms. Revision to FPP-1812441, tenant improvement including new interior partitions and relocating existing electrical, mechanical, plumbing, fire alarm, and fire sprinklers.
Suite 1560
EPC Submittal - Deferred/Revision to Issued Permit FPP-1812441 - Revision to show nearest compliant restroom
Suite 650
Suite 650, REMODEL AND EXPANSION OF EXISTING SUITE. WORK SHALL INCLUDE: NEW WALLS; DOORS; CEILING; FINISHES; AND MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION TO ACCOMMODATE NEW LAYOUT
Suite 670
EXPEDITED - EPC - SUITE 670 SCOPE: NEW REMODEL TO INCLUDE NEW PARTITIONS, FLOOR AND WALL FINISHES, NEW LIGHTING, ELECTRICAL, PLUMBING, HVAC AND FIRE PROTECTION. FITNESS CENTER SCOPE: NEW FLOORING AND WALL FINISHES. NEW LIGHTING AND HVAC IN NEW GROUP-WORKOUT ROOM. See revision COM-1824129 change to fire alarm
Suite 670
SUITE 670 SCOPE: NEW REMODEL TO INCLUDE NEW PARTITIONS, FLOOR AND WALL FINISHES, NEW LIGHTING, ELECTRICAL, PLUMBING, HVAC AND FIRE PROTECTION. FITNESS CENTER SCOPE: NEW FLOORING AND WALL FINISHES. NEW LIGHTING AND HVAC IN NEW GROUP-WORKOUT ROOM.
Orrick, Herrington, And Sutcliffe Remodel
EXPEDITED 15,10,10- EPC Submittal - Suite 3000 Remodel of Commercial Building - Tenant improvement for Orrick, Herrington and Sutcliffe on floors 28 (partial), 29 and 30 of 400 Capital Mall. See revision Com-1821598
Suite 1560
EXPEDITED - EPC - Suite 1560, tenant improvement including new interior partitions and relocating existing electrical, mechanical, plumbing, fire alarm, and fire sprinklers
Suite 2640
EXPEDITED - EPC - Suite 2640, MINOR T.I. INCLUDING DEMOLITION, NEW INTERIOR PARTITIONS WITH RELATED ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLERS
Suite 1560
Suite 1560, tenant improvement including new interior partitions and relocating existing electrical, mechanical, plumbing, fire alarm, and fire sprinklers
EPC Submittal - Remodel of Commercial Building - Tenant improvement for Orrick, Herrington and Sutcliffe on floors 28 (partial), 29 and 30 of 400 Capital Mall.
Suite 2640
Suite 2640, MINOR T.I. INCLUDING DEMOLITION, NEW INTERIOR PARTITIONS WITH RELATED ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLERS
INTERIOR DEMO ONLY
EXPEDITED - DEMOLITION OF EXISTING FINISHES BACK TO CORE/ SHELL FOR FUTURE TI.
REVISION TO COM-1803655
**SEE COM-1803655** Fire Sprinkler Revisions
Wells Fargo Building
Disconnect existing lobby furniture systems for removal and reconnect new furniture system. Revision to FPP-1723105. Lobby remodel. Built in reception desk, built in seating, new ceiling and lighting features.
C/O Heat Pump
Replace WSHP LIKE FOR LIKE NO DUCT WORK
PARKING GARAGE SIGNS
REPLACE EXPIRED SIGN PERMIT SIG-1704719 : INSTALL (2) BUILDING MOUNTED "P" SIGNS AT PARKING GARAGE ENTRANCES. (ILLUMINATED ) LIGHTING CIRCUIT BY OTHERS.
28th Floor
EXPEDITED - 28th Floor, tenant improvement including demo, new partitions, related electrical, and fire sprinklers
Wells Fargo Building
EXPEDITED - Lobby remodel. Built in reception desk, built in seating, new ceiling and lighting features.
Suite 900
EXPEDITED - Interior demolition suite 900 SEE REVISION COM-1807778
Suite 2550
EXPEDITED - Interior remodel of suite 2550. New partitions with associated electrical, mechanical, fire sprinklers and alarm.
Suite 1600
EXPEDITED - Suite 1600 interior remodel. Demo some existing partitions, New partitions with electrical and fire sprinklers.
Suite 700
EXPEDITED - Suite 700, 7,288 sq. ft. remodel, Work to include demolition, new partitions, finishes, electrical and plumbing
wells fargo center, orrick
re face existing sign pylon with wells fargo center, orrick
Suite 2640
EXPEDITED - Suite 2640, New interior partitions with related electrical, mechanical and sprinkler
Suite 2600
EXPEDITED - Suite 2600, New interior partitions with related electrical, mechanical, plumbing and sprinkler
revision Electrical Only
EXPEDITED - revision to COM-1708690 replaced panel to add a circuit
Electrical Only
EXPEDITED - Provide (2) circuits for exterior parking signs. This permit for electrical only sign to be on a separate permit. (Revision to COM-1712415 replace panel CRF 7-13-2017)
Suite 2520
EXPEDITED - Suite 2520, Interior demo, New interior walls, new electrical receptacles, new supply and return, remodel 3181 sq. ft.
Hines/Wells Fargo HVAC
remove 4 existing heat pump and install 4 new units like for like, interior work only in the mechanical room. New units provide for wells fargo which is the whole bldg.
PARKING GARAGE SIGNS
INSTALL 2 ATTACHED ILLUMINATED SIGNS.
electrical work
EXPEDITED - 28TH FLOOR- add 5 power wall outlets, add 2 exhaust fans in in 2 server #1 & #2 closets, add 1 20 amp dedicated power outlet to server closet #2, add 1 30 amp dedicated power outlet to server closet # 2
EVC in Parking Garage
EXPEDITED - Install 5 new EVC's in Parking Garage. Install new 75KVA Transformer & new 200A panel.
Suite 700
EXPEDITED - Suite 700, Interior demo, New interior walls, new electrical receptacles, new supply and return
Fire Alarm
Fire alarm project scope is adding 8 duct smoke detectors for HVAC shutdown
Economic and Planning Systems, 28th floor
EXPEDITED - Interior remodel of 28th floor: new partition walls, new electrical receptacles, new supply and returns. Economic and Planning Systems
EPC Submittal - Remodel of Commercial Building - FIRE ALARM PROJECT SCOPE INVOLVES ADDING (8) DUCT SMOKE DETECTORS FOR HVAC UNIT SHUTDOWN.
OTC REMODEL W/ PLANS
EXPEDITED - INSTALLATION OF OPERABLE PARTITIONS.
Suite 1200
EXPEDITED - Suite 1200 interior remodel to include: Demolition of interior partitions, new partitions, with associated plumbing/mechanical, electrical and fire sprinklers and alarm.
CUSHMAN & WAKEFIELD
EXPEDITED - Suite 1800 interior remodel to include demolition of existing partitions, new partitions with associated plumbing/mechanical, electrical, fire sprinklers and alarm.
Suite 1500
EXPEDITED - Suite 1500 Interior remodel. Demo interior partitions, new partitions with associated mechanical, electrical and fire sprinklers.
Suite 1260
EXPEDITED - Suite 1260 interior remodel. Demolition of existing partitions new partitions with associated electrical, plumbing/mechanical and fire sprinklers.
Interior Remodel
EXPEDITED - Suite 1500 interior remodel. Demo existing interior partitions new interior partitions and associated plumbing/mechanical, electrical and fire sprinklers.
Suite 1450
EXPEDITED - Suite 1450 Interior Remodel to include new partitions, electrical, plumbing, mechanical and fires sprinklers.