Sacramento 95811 · Southside Park · APN 009-0053-014-0000 · City of Sacramento
Zoned C-2-SPD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $684,000 ($602,000–$766,000).
Public building records show issued construction/renovation work on this parcel (30 total permits, latest Jun 1, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
33 substantial renovation & housing permits over 24 months (47.4 per 1,000 parcels vs. 30.4 citywide baseline) (#18 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Southside Park)
about 4% of the lot of the parcel intersects Zone X: minimal flood hazard. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$684,000
Benchmark range: $602,000 – $766,000
Closest lead: R St Apartments (350 ft W, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$687/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 9 homes completed, 377 permitted, 108 proposed or in review (239 of them deed-restricted affordable); 1 demolition.
19 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
395 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-2 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Entitled" for 5.7 yr (since Mar 4, 2021), with no new permit record in 5.7 yr. · 2 units
In "Entitled" for 6.2 yr (since Sep 3, 2020), with no new permit record in 5.6 yr. · 4 units · $900,000 declared valuation
In "Entitled" for 5.3 yr (since Jul 8, 2021), with no new permit record in 5.3 yr. · 1 unit
In "Entitled" for 5.3 yr (since Aug 5, 2021), with no new permit record in 5.3 yr. · 2 units
In "Fee estimate" for 5.3 yr (since Aug 11, 2021), with no new permit record in 5.3 yr. · 231 units · $112,000,000 declared valuation
In "Entitled" for 5.2 yr (since Aug 18, 2021), with no new permit record in 5.2 yr. · 2 units
Nearby plan revision / deferred submittal (805 R St): First appeared in published agency feed
Record COM-2623129 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (625 S St): Description text was updated
Record COM-2427208 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (400 Capitol Mall 2100): Status changed from Plan Check Target to Process Wait
Record COM-2615991 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (400 Capitol Mall 2100): Contractor changed from (blank) to BCCI CONSTRUCTION LLC
Record COM-2615991 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (625 S St): First appeared in published agency feed
Record COM-2622257 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (2120 10th St): First appeared in published agency feed
Record RES-2622068 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (2200 Front St): Status changed from Plan Check Target to Issued
Record COM-2611633 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (2200 Front St): Issued date changed from (blank) to 2026-10-19
Record COM-2611633 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (2200 Front St): Contractor changed from CONTINENTAL BUILDERS & SERVICE INC to BRUCE CONSTRUCTION
Record COM-2611633 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby fire alarm / sprinkler (2016 9th St): Status changed from Applied to Issued
Record RES-2621240 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby fire alarm / sprinkler (2016 9th St): Issued date changed from (blank) to 2026-09-29
Record RES-2621240 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby fire alarm / sprinkler (2016 9th St): Description text was updated
Record RES-2621240 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Record COM-2606160 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (555 Capitol Mall 1200): Status changed from Plan Check Wait to Issued
Record FPP-2617830 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (555 Capitol Mall 1200): Issued date changed from (blank) to 2026-10-16
Record FPP-2617830 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Fee estimate" for 3.9 yr (since Jan 3, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (300 housing units, $85,000,000 declared valuation across 1 permit).
In "Entitled" for 4.9 yr (since Dec 15, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (72 housing units across 0 permits).
In "Entitled" for 3.9 yr (since Dec 8, 2022), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (227 housing units, $65,000,000 declared valuation across 4 permits).
In "Fee estimate" for 5.3 yr (since Aug 11, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (231 housing units, $112,000,000 declared valuation across 3 permits).
In "Entitled" for 2.7 yr (since Feb 29, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (27 housing units, $7,500,000 declared valuation across 1 permit).
In "Fee estimate" for 4.3 yr (since Jul 27, 2022), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (23 housing units, $9,000,000 declared valuation across 1 permit).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 696 parcels
−5.9% YoY
City baseline: 30.4 / 1k
33 in trailing 24m
Includes 9 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS LLC | Commercial tenant improvement | 5 on parcel88 in ½ mi | $14,986,447 | 39 vs 62 prior−37% |
| Jones And Lamberti Builders | Commercial tenant improvement | 1 on parcel39 in ½ mi | $13,917,351 | 28 vs 33 prior−15% |
| Marketone Builders |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95811
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($6,850/yr) + local voter-approved bond debt ($959/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$29,745/yr
Cash needed: $150,700
NOI: $11,820/yr
P&I: $3,464/mo
For $0/mo net cash flow
At $2,375/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $2,185/mo | −$2,752/mo | -21.9% | $6,026/mo | −$2,726/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,375/mo | −$2,479/mo | -19.7% | $5,577/mo | −$2,319/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,518/mo | −$2,322/mo | -18.5% | $5,448/mo | −$2,008/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
REVISION TO COM-2513551
EPC - revision COM-2513551 The Electrical scope has been revised from 250v 3 Phase to 250v single phase and NEMA L15 to Nema L6 on page 8S84010.
CA Privacy Protection Agency
EPC - EXPEDITED - Demise Suite 350, tenant improvement with interior demo and new interior partitions w/related electrical, mechanical, plumbing, sprinkler and alarm. Also creates new suite 340.
Remodel Suite 310
EPC - EXPEDITED - Remodel of Suite 310 with new electrical and finishes. No new plumbing, or fire sprinkler work required.
CA Privacy Protection Agency
Demise Suite 350, tenant improvement with interior demo and new interior partitions w/related electrical, mechanical, plumbing, sprinkler and alarm.
Spec Suite Remodel (SUITE 355)
EPC - EXPEDITED - Tenant Improvement for spec suite with new interior partitions, related electrical, mechanical, plumbing and fire sprinklers.
SUITE 100 & 105 - REMODEL
EPC - EXPEDITED - SUITE 100 & 105 - Demolition of existing walls or portion of existing walls, casework, sinks, soffits, accessories and flooring to create two vacant suites. Install new interior door, new partitions, storage, telecom rooms, and associated plumbing and electrical work.
400 R Street Suite #140 REMODEL
EPC - EXPEDITED - 1. DEMOLITION OF (E) WALLS OR PORTION OF (E) WALLS. 2. REMOVE (E) ACOUSTIC T-BAR CEILING AT LOCATIONS FOR FUTURE SOFFITS. 3. INSTALL (N), EXIT ONLY, EXTERIOR DOOR WITHIN EAST STOREFRONT SYSTEM. 4. (N) FIRE RATED WALL AT LOBBY AND CORRIDOR ENTRANCES TO SUITE. (N) DEMISING WALL TO DIVIDE SPACE FROM ADJACENT SUITE. (N) INTERIOR PARTITION WALLS THROUGHOUT FOR PROPOSED LAYOUT. 5. (N) FINISHES THROUGHOUT THE SUITE. 6. (N) CASEWORK FOR RECEPTION COUNTER, WELLNESS ROOM AND BREAK AREA. 7. ASSOCIATED MECHANICAL, PLUMBING, ELECTRICAL FIRE SPRINKLER AND FIRE ALARM WORK.
fpp remodel
EPC - EXPEDITED - 1)Add demising wall to divide the existing suite into two suites. 2) Demo of interior walls, doors, electrical, and data. Reusing power & data where possible. 3) Construction of new interior walls, casework, electrical and data. 4) Reuse (E) doors from landlord inventory for new door locations. 5) corresponding MEP & Fire Protection work
400 R Street Suites 355 & 370 Interior Demolition
EXPEDITED - DEMOLITION OF WALLS, CASEWORK, SINKS, SOFFITS, ACCESSORIES AND FLOORING TO CREATE TWO "WHITE BOX" UNIMPROVED VACANT SUITES. SUITES ARE NOT FOR OCCUPANCY.
400 R St - FIRE ALARM
EPC - THREE EXISTING STROBES SHALL BE REMOVED, TWO EXISTING STROBES SHALL BE RELOCATED AND THREE EXISTING SPEAKER STROBES SHALL BE RELOCATED.
REVISION TO FPP-2203622
EPC - REVISION TO FPP-2203622 Revision for added panel 3F4, 3F2 and loads.
FPP-400 R Street Suite #360 REMODEL
EPC - 1.DEMOLITION OF (E) WALLS OR PORTION OF (E) WALLS. 2. WALL FRAMING FOR (N) OFFICE CONFIGURATION. 3. REMOVE (E) G. WB. CEILING AT LOCATIONS OF (E) ELECTRICAL ROOM, (E) FIRE RISER. ROOM, AND (E) STORAGE ROOM. 4. NEW CEILING GRID AND TILE AT (E) STORAGE ROOM AND (N) NON RATED CORRIDOR (5. N) DEMISING WALL TO SEPARATE FROM ADJACENT SUITE.6. (N) FINISHES THROUGHOUT THE SUITE. 7. (N) CASEWORK FOR RECEPTION COUNTER, COFFEE BAR AREA AND MAIL ROOM. 8. ASSOCIATED MECHANICAL, PLUMBING, ELECTRICAL FIRE SPRINKLER AND FIRE ALARM WORK
EOTC interior demo
EXPEDITED - EPC - EOTC removal of 185LF of interior partitions in an office for Suit 140
Revision to FPP-1901933
EPC - Revision to FPP-1901933-No longer doing work in the Breakroom. Revised detail F6 for casework in the hearing room.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
0.73 acres
Assessor's classification for assessment purposes. This is not zoning.
400 R ST; 400 R ST STE 100 STE 100; 400 R ST STE 105 STE 105
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 009-0053-014-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| Commercial tenant improvement |
| 9 on parcel32 in ½ mi |
| $8,428,054 |
| 10 vs 13 prior−23% |
| Pacific Ridge Builders | Commercial tenant improvement | 4 on parcel26 in ½ mi | $7,728,896 | 46 vs 10 prior+360% |
| D 7 Roofing Services | Roof replacement | 1 on parcel1 in ½ mi | $114,600 | 0 vs 0 prior |
| Mc Carthy Building Companies | Commercial tenant improvement | 1 on parcel1 in ½ mi | $56,800 | 0 vs 0 prior |
| Sacramento Control | Fire alarm / sprinkler | 1 on parcel1 in ½ mi | $13,750 | 0 vs 2 prior |
| Browning Construction Recent nearby: 555 Capitol Mall 1200 (Oct 16, 2026) | Commercial tenant improvement | 49 in ½ mi | $5,729,857 | 5 vs 9 prior−44% |
| Bt Builders Recent nearby: 555 Capitol Mall (Jun 9, 2022) | Commercial tenant improvement | 21 in ½ mi | $4,661,401 | 10 vs 12 prior−17% |
| J Sutter Builders Recent nearby: 500 Capitol Mall 1050 (Oct 20, 2026) | Commercial tenant improvement | 21 in ½ mi | $3,926,765 | 17 vs 18 prior−6% |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Roof replacementOn this parcel | 19,072 | 0d | 0d | 0d | 2d | 0d |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
4th Floor Revision
EPC - Revision to FPP-1901935, Minor tenant field revision: Add one demising wall; remove two office spaces from original permit.
2ND Floor
EXPEDITED - EPC - 2ND Floor, Remodel of Commercial Building - NEW TENANT IMPROVEMENT WORK IN EXISTING SUITE. WORK TO INCLUDE MECHANICAL, ELECTRICAL, FIRE SPRINKLERS AND FIRE ALARM UPGRADES. MINOR DEMOLITION OF PART. WALLS, DOORS AND CASEWORK. (N) PART. WALLS, DOORS AND CASEWORK AND ACCESSIBILITY UPGRADES WITHIN SUITE SPACE.
2nd Level Restroom Remodel
EXPEDITED - Accessibilty & finish upgrades to 2nd level restrooms to inclue minor removal of partition walls, minor plumbing, casework, doors, and accessibilty upgrades.
Floors 1, 3, & 4
EXPEDITED - EPC - Finish upgrades to the 2nd floor restroom, Revision to FPP-1904924, Remodel of Commercial Building - Restroom ADA upgrades at 1st, 3rd, & 4th floors. Includes rework of existing partitions and plumbing.
2ND Floor
2ND Floor, Remodel of Commercial Building - NEW TENANT IMPROVEMENT WORK IN EXISTING SUITE. WORK TO INCLUDE MECHANICAL, ELECTRICAL, FIRE SPRINKLERS AND FIRE ALARM UPGRADES. MINOR DEMOLITION OF PART. WALLS, DOORS AND CASEWORK. (N) PART. WALLS, DOORS AND CASEWORK AND ACCESSIBILITY UPGRADES WITHIN SUITE SPACE.
Suite 310
EXPEDITED - EPC - Suite 310, Remodel of Commercial Building - Wall framing to create new offices and new hearing room, new full height sound wall to separate the suites. New rated wall & door assemblies for new hearing room. Associated electrical and mechanical work. INSPECTION AND PLAN REVIEW IS BY THE SFM SEE REVISION FPP-2102900-No longer doing work in the Breakroom. Revised detail F6 for casework in the hearing room.
Suite 320
EXPEDITED - EPC - Suite 320, Remodel and Change of Use of Commercial Building - Wall framing to separate suites. New rated wall & door assemblies. As well as associated electrical & mechanical work. State Fire Marshal is plan checking the plans & alarms
Suite 350
EXPEDITED - EPC - Suite 350, Remodel of Commercial Building - Existing cubicles to be removed, modifications to demising wall, installation of new coffee bar casework, & associated electrical & mechanical work. State Fire Marshal is plan checking the plans & alarms
4TH Floor
EXPEDITED - EPC - 4Th Floor, Remodel of Commercial Building - New tenant improvement work in existing suites. Work to include mechanical, electrical, plumbing, fire sprinklers, and fire alarm upgrades. Minor demolition of partitions walls, doors, and casework. INSPECTED AND PLAN REVIEWED BY THE SFM
Floors 1, 3, & 4
EXPEDITED - EPC - Remodel of Commercial Building - Restroom ADA upgrades at 1st, 3rd, & 4th floors. Includes rework of existing partitions and plumbing.
Reroof-TPO Overlay.
E-Permit: Tear Off - No, Resheet - No, 2 layer(s), 382 squares of TPO Single Ply. CRRC: 0608-0008
Floors 1, 2, & 4
Remodel of Commercial Building - Restroom ADA upgrades at 1st, 3rd, & 4th floors. Includes rework of existing partitions and plumbing.
Suite 310
Suite 310, Remodel of Commercial Building - Wall framing to create new offices and new hearing room, new full height sound wall to separate the suites. New rated wall & door assemblies for new hearing room. Associated electrical and mechanical work. INSPECTION AND PLAN REVIEW IS BY THE SFM
Suite 350
Suite 350, Remodel of Commercial Building - Existing cubicles to be removed, modifications to demising wall, installation of new coffee bar casework, & associated electrical & mechanical work. State Fire Marshal is plan checking the plans & alarms
4TH Floor
4Th Floor, Remodel of Commercial Building - New tenant improvement work in existing suites. Work to include mechanical, electrical, plumbing, fire sprinklers, and fire alarm upgrades. Minor demolition of partitions walls, doors, and casework. INSPECTED AND PLAN REVIEWED BY THE SFM
Suite 320
Suite 320, Remodel and Change of Use of Commercial Building - Wall framing to separate suites. New rated wall & door assemblies. As well as associated electrical & mechanical work. State Fire Marshal is plan checking the plans & alarms