Sacramento 95828 · Morrison Creek · APN 064-0020-097-0000 · City of Sacramento
Zoned M-2S-R in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $433,000 ($381,000–$485,000).
Public building records show issued construction/renovation work on this parcel (10 total permits, latest Apr 14, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
24 substantial renovation & housing permits over 24 months (89.2 per 1,000 parcels vs. 30.4 citywide baseline) (#2 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Morrison Creek)
all of the lot of the parcel intersects Zone X: 0.2% annual chance flood hazard (shaded X). Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$433,000
Benchmark range: $381,000 – $485,000
Plumbing / water heater / sewer (COM-2607306): Pending in review for 7 mo — slower than 90% of plumbing / water heater / sewer permits in City of Sacramento (median 0d, 90th pct 1d, n=18,112).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$449/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 2 commercial or mixed-use projects.
2 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
52 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of M-2 as industrial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
Nearby commercial tenant improvement (8535 Morrison Creek Dr): Status changed from Applied to Plan Check Wait
Record COM-2620610 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (8451 Rovana Cir): Status changed from Plan Check Wait to Issued
Record SIG-2618188 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (8451 Rovana Cir): Issued date changed from (blank) to 2026-10-21
Record SIG-2618188 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (8451 Rovana Cir): Declared valuation changed from 3500 to 5200
Record SIG-2618188 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (8371 Rovana Cir): Status changed from Plan Check Target to Plan Check Wait
Record COM-2619216 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (8451 Rovana Cir): Status changed from Issued to Safe to Stock
Record COM-2615096 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Latest published Zillow Home Value Index (ZHVI) update
Changed from $449,112 in September 2025 to $449,666 in September 2026.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95828 (not a parcel appraisal)
8610 Elder Creek Rd · $2,339,123 valuation
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Plumbing / water heater / sewer permit application filed (COM-2607306)
storage tank related equpment
EPC - Installation of an 3,000 Gallon liquid oxygen tank, vaporizer, and pump on a new concrete pad. · Declared valuation: $125,000
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
8376 Rovana Cir · $72,632 valuation
Records span Jun 16, 2025 to Feb 26, 2026 (1 permit).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Annual ZIP 95828 home-value index checkpoint
Changed from $462,484 in September 2024 to $449,112 in September 2025.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95828 (not a parcel appraisal)
Annual ZIP 95828 home-value index checkpoint
Changed from $449,718 in September 2023 to $462,484 in September 2024.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95828 (not a parcel appraisal)
Annual ZIP 95828 home-value index checkpoint
Changed from $475,401 in September 2022 to $449,718 in September 2023.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95828 (not a parcel appraisal)
8642 Elder Creek Rd · $150,000 valuation
Records span Dec 10, 2021 to Nov 1, 2022 (3 permits).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Annual ZIP 95828 home-value index checkpoint
Changed from $422,855 in September 2021 to $475,401 in September 2022.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95828 (not a parcel appraisal)
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →Pending in review for 7 mo — slower than 90% of plumbing / water heater / sewer permits in City of Sacramento (median 0d, 90th pct 1d, n=18,112).
Issued after 4 mo — slower than 90% of electrical / panel permits in City of Sacramento (median 0d, 90th pct 5d, n=11,023).
Issued after 4 mo (8.3× the 14d median) — slower than 90% of fire alarm / sprinkler permits in City of Sacramento (median 14d, 90th pct 71d, n=2,312).
Pending in review for 9.9 yr — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Issued after 5 mo (3.5× the 40d median) — above the 75th percentile for ev charger permits in City of Sacramento (median 40d, 75th pct 91d, n=225).
Issued after 4 mo (2.1× the 63d median) — above the 75th percentile for commercial tenant improvement permits in City of Sacramento (median 63d, 75th pct 119d, n=2,366).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 269 parcels
+40.0% YoY
City baseline: 30.4 / 1k
24 in trailing 24m
Includes 0 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Mark Iii Construction | Remodel / interior alteration | 6 on parcel6 in ½ mi | $500,000 | 2 vs 4 prior |
| Green Water And Power | EV charger | 1 on parcel1 in ½ mi | $65,000 | 0 vs 0 prior |
| Dynamic Trades Recent nearby: 8500 Morrison Creek Dr 200 (Dec 16, 2025) | Commercial tenant improvement | 10 in ½ mi | $4,631,919 |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95828
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($4,350/yr) + local voter-approved bond debt ($609/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$14,279/yr
Cash needed: $95,700
NOI: $12,116/yr
P&I: $2,200/mo
For $0/mo net cash flow
At $2,100/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,932/mo | −$1,431/mo | -17.9% | $3,930/mo | −$1,398/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,100/mo | −$1,190/mo | -14.9% | $3,637/mo | −$1,037/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,226/mo | −$1,051/mo | -13.2% | $3,553/mo | −$763/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
storage tank related equpment
EPC - Installation of an 3,000 Gallon liquid oxygen tank, vaporizer, and pump on a new concrete pad.
REVISION TO COM-2200678
EPC - relocating 2 chargers to the main building, new trenching, 2 new sub panels and new meter location
EV Charging Stations
EPC - Installation of 10 Level 2 EV chargers on existing service. revision COM-221254 relocating 2 chargers to the main building, new trenching, 2 new sub panels and new meter location
Analyzing room for helium filing facilty, BLDG 6
Construct walls and ceiling in existing warehouse for analyzing room, 96 square feet, BLDG 6. Work includes the creation of a new 3-0 x 7-0 door to exterior.
Air Gas Campus / Helium Storage Tanks
North Side of Bldg 4, Install a set of 9 High Pressure Helium storage Tubes , Install bollards around the entire assembly, Install small control panel inside building 4 , supplied with 120V Power from existing sub panel in building and construct concrete footings for tube rack assembly.
Airgas Helium Filling Station
Construction of a freestanding ,1794SF metal canopy structure, immediately adjacent but not attached to Building 6, use of which shall be to house equipment and machinery used for helium tank operation. Providing Seismic anchorage for selected equipment, Providing Electrical for equipment and installing dry well and pit scale.( Fire Sprinkler Submittal to be deferre10-18-17 dsp). See Com-1719332 for deferred fire sprinkler submittal.
Deferred Submittal
Deferred submittal of fire sprinklers for Com-1714160
Air Gas Campus Bldg 6- 96SF Remodel
Construction of a new 96SF Conditioned room within the interior footprint of Bldg 6. Mixed use within warehouse still appears to be under 25%. Work includes the creation of a new 3-0x7-0 door to exterior.
REMODEL
REMOVAL OF EXSITING EXTERIOR, OPEN AIR LIQUID PROPANE TANK, FILLING STATION AND ASSOCIATED CONTROLS. INSTALLATION OF LIQUID HYDROGEN TANK, FILLING STATIONS AND ASSOCIATED CONTROLS RELOCATED FROM OWNER'S UNION CITY FACILITY WHERE IIT IS IN OPERATION. INSTALLATION OF STEEL PROTECTION BOLLARDS AROUND WORK AREA. CONSTRUCTION OF CONCRETE PEDESTAL TO SUPPORT TANK. ALL WORK IS OUTDOORS IN OPEN AIR NOT IN BUILDING.
Estimate
Estimate for installation of a 9000 gallon hydrogen tank, associated controls and filling stations.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
14.38 acres
Assessor's classification for assessment purposes. This is not zoning.
6725 FLORIN PERKINS RD; 6801 FLORIN PERKINS RD
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 064-0020-097-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| 1 vs 4 prior |
| S And S Construction Merged: S & S Construction · S & S CONSTRUCTION Recent nearby: 8540 Morrison Creek Dr (May 22, 2025) | Commercial tenant improvement | 6 in ½ mi | $2,852,400 | 0 vs 3 prior |
| Amazza Construction Recent nearby: 8610 Elder Creek Rd (May 8, 2018) | Commercial tenant improvement | 5 in ½ mi | $94,700 | 1 vs 0 prior |
| Rc Pacific Construction Recent nearby: 8372 Rovana Cir (Nov 18, 2020) | Addition (adds square footage) | 2 in ½ mi | $1,101,199 | 2 vs 2 prior |
| Deacon Construction Recent nearby: 8451 Rovana Cir (Jun 11, 2026) | Commercial tenant improvement | 2 in ½ mi | $1,045,000 | 12 vs 11 prior+9% |
| Buzz Oates Construction Recent nearby: 8581 Morrison Creek Dr (May 12, 2016) | Commercial tenant improvement | 2 in ½ mi | $200,000 | 9 vs 5 prior |
| Icon General Contractors Recent nearby: 8440 Rovana Cir (Jun 11, 2020) | Commercial tenant improvement | 2 in ½ mi | $106,016 | 39 vs 62 prior−37% |
| Platinum Finishing Recent nearby: 8409 Rovana Cir (Jun 2, 2021) | Commercial tenant improvement | 2 in ½ mi | $90,000 | 0 vs 0 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| EV chargerOn this parcel | 225 | 17d | 40d | 91d | 190d | 40d(vs 45d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.