Active in City of Sacramento (87 permits)
Raw permit filing name: DEACON CONSTRUCTION LLC
61 issued · 32 parcels
vs 29 prior 24m(−45%)
44 construction/remodel
Sum of permit job values
Application → issuance
Latest: Sep 3, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 31 | 25 | — | $28,138,713 | 83d (n=25) | 63d (119d p75) | Within typical range | |
| 23 | 18 | 1 | $666,450 | 14d (n=18) | 14d (29d p75) | Within typical range | |
| 15 | 1 | — | — | — | 41d (93d p75) | — | |
| 5 | 5 | 674 | $128,544,421 | 467d (n=5) | 210d (365d p75) | Above 75th pct turnaround | |
| 5 | 5 | — | $438,426 | 32d (n=5) | 4d (21d p75) | Above 75th pct turnaround | |
| 3 | 2 | — | $3,480,400 | 125d (n=2) | 42d (83d p75) | — | |
| 2 | 2 | — | $97,641 | 104d (n=2) | 0d (0d p75) | — | |
| 2 | 2 | — | $1,242,950 | 129d (n=2) | 33d (85d p75) | — | |
| 1 | 1 | — | $10,000 | — | 14d (29d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
65 units · 98 affordable · $13,500,000 · 36 permits
43 units · 42 affordable · $13,000,000 · 15 permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2801 K St City of Sacramento · APN 007-0450-002-0000 | Commercial tenant improvement COM-2619466Portal ↗ | Applied Sep 3, 2026 | Applied | $1,581,780 | SHARED PLANS / OSHPD 3 project. To replacement and upgrade of the existing Westcom nurse call to Rauland Responder 5 within the Sutter Sacramento Medical Campus: Fort Sutter Building that remodels Level 1: 1,182sqft. Construction type IA, Occupancy B. Shared plans reviewed under COM-2619465 Filed as: DEACON CONSTRUCTION LLC |
| 2800 L St City of Sacramento · APN 007-0450-002-0000 | Commercial tenant improvement COM-2619465Portal ↗ | Applied Sep 3, 2026 | Plan Check Wait | $1,802,931 | SHARED PLANS / OSHPD 3 project (MAIN). To replacement and upgrade of the existing Westcom nurse call to Rauland Responder 5 within the Sutter Sacramento Medical Campus: Buhler Building that remodels Level 2: 2,312sqft and Level 3: 2,626sqft. Construction type IIA, Occupancy B. Shared plans reviewed under COM-2619465 Filed as: DEACON CONSTRUCTION LLC |
| 6366 Mack Rd City of Sacramento · APN 117-0012-019-0000 | Commercial tenant improvement COM-2606155Portal ↗ | Issued Jun 26, 2026 91d review | Issued | $500,000 | EPC - Area of work- 58,165 SF. Remodel of existing building front canopy, addition of trash enclosure, and parking lot lighting upgrade. - PLNG-INSP Filed as: DEACON CONSTRUCTION LLC |
| 8451 Rovana Cir City of Sacramento · APN 064-0010-135-0000 | Remodel / interior alteration COM-2605447Portal ↗ | Issued Jun 11, 2026 84d review | Finaled | $250,000 | EPC - SITE WORK TO INCLUDE DEMO, RELOCATED PARKING, EXPANDED DEPRESSED DOCK, NEW STAIRS AT DOORS, AND NEW GATES. ALL BUILDING TENANT IMPROVEMENT AND EXTERIOR WORK UNDER PERMIT COM-2526267. Filed as: DEACON CONSTRUCTION LLC |
| 8451 Rovana Cir City of Sacramento · APN 064-0010-135-0000 | Commercial tenant improvement COM-2526267Portal ↗ | Issued May 12, 2026 152d review | Finaled | $795,000 | EPC - OFFICE TI TO INCLUDE DEMO, NEW WALLS, AND FINISHES. UPGRADES TO MECHANICAL, ELECTRICAL, AND SPRINKLER SYSTEM. EXTERIOR BUILDING WORK TO INCLUDE DEMO, NEW DOORS, NEW ROLL UP DOORS AND INFILLING EXTERIOR WALLS. SITE WORK WILL BE A SEPARATE PERMIT. - PLNG-INSP SEE REVISION COM-2613011, Electrical and Structural for SMUD Room Requirements. SEE REVISION COM-2615334 REVISED ELECTRICAL DRAWINGS AS DESCRIBED ON NARRATIVE TO ADDRESS INSPECTION COMMENTS, CLARIFY INTENT, AND PROVIDE OWNER REVISIONS. Filed as: DEACON CONSTRUCTION LLC |
| 6350 Mack Rd City of Sacramento · APN 117-0012-019-0000 | Remodel / interior alteration COM-2602785Portal ↗ | Issued Mar 16, 2026 32d review | Finaled | $30,000 | EPC - NON-STRUCTURAL INTERIOR DEMOLITION WORK OF EXISTING RESTAURANT SPACE FOR FUTURE BAKERY. - INTERIOR DEMOLITION ONLY - NO STRUCTURAL ELEMENTS OF BUILDING WILL BE ALTERED OR DEMOLISHED. BAKERY REMOLDING UNDER SEPARATE PERMIT (SUB-2601669) Filed as: DEACON CONSTRUCTION LLC |
| 2505 Riverside Blvd City of Sacramento · APN 009-0291-020-0000 | Commercial tenant improvement COM-2526573Portal ↗ | Issued Feb 11, 2026 58d review | Finaled | $150,000 | EPC - EXPEDITED - installation of new exterior employee entrance directly adjacent to customer entry. Interior demo of non-bearing walls, and installation of interior non-bearing walls and doors. Restroom updates for accessibility requirements. 724 sf area of work on interior of structure. Site/parking lot: includes removal of cart rails, additional tow away signage, and slope corrections, 2000 sq. Ft. Existing Target store, drive-up order fulfilment improvements. Filed as: DEACON CONSTRUCTION LLC |
| 6366 Mack Rd City of Sacramento · APN 117-0012-019-0000 | Remodel / interior alteration COM-2524188Portal ↗ | Issued Dec 30, 2025 41d review | Issued | $3,500 | EPC - INTERIOR DEMO OF NON LOAD BEARING WALLS ON MEZZANINE LEVEL ONLY. REMOVE ALL FIXTURES AND FINISHES. Filed as: DEACON CONSTRUCTION LLC |
| 4850 Duckhorn Dr City of Sacramento · APN 225-0080-070-0000 | Fire alarm / sprinkler COM-2523581Portal ↗ | Issued Dec 2, 2025 22d review | Finaled | $650,000 | EPC - Scope of work: Repair water damaged rooms and corridors caused by a sprinkler head discharge. Repairs include installation of new drywall, new insulation, painting, new carpet flooring, wall finishes, electrical fixtures/devices, wallpaper, bathroom finishes and acoustic ceiling repairs. Filed as: DEACON CONSTRUCTION LLC |
| 3401 Stockton Blvd City of Sacramento · APN 015-0181-052-0000 | New multifamily / condos / mixed-use COM-2426948Portal ↗ | Issued Jul 18, 2025 219d review | Issued | $13,500,000 65 units | MULTI-FAMILY HOUSING. Affordable. - EPC. Type VA, OCC: R2, B, A2, S2. 47,714 sqare feet. 3 story mixued use building. 65 100% affordable dwelling units. Ground floor retail, and amenity space. 55 parking stalls, utility taps, and site work. 58 studio/one bedroom 7 two bedroom 52 units: < 750sqft 13 units: 750 sqft-2000 sqft A-2: 1,345 sqf; B:2,787 sqft; S-2: 1,118 sqft; R-2: 42,464 sqft. - PLNG-INSP Filed as: DEACON CONSTRUCTION LLC |
| 1201 Alhambra Blvd 110 City of Sacramento · APN 007-0183-008-0000 | Remodel / interior alteration COM-2510215Portal ↗ | Issued May 23, 2025 4d review | Finaled | $116,000 | EOTC - Minor electrical- Add 7 duplex receptacles to existing Dr. office Job Value $116,000.00 Filed as: DEACON CONSTRUCTION LLC |
| 6366 Mack Rd City of Sacramento · APN 117-0012-019-0000 | Fire alarm / sprinkler COM-2505192Portal ↗ | Issued Mar 28, 2025 14d review | Finaled | $16,450 | EPC. Installation of New UL300 Hood and Duct Fire Suppression System. Filed as: DEACON CONSTRUCTION LLC |
| 6366 Mack Rd City of Sacramento · APN 117-0012-019-0000 | Plan revision / deferred submittal COM-2503608Portal ↗ | Applied Feb 21, 2025 | Complete | — | EPC. Revision to COM-2323448 interior demo of mezzanine and first floor: Clarification of interior demolition per inspector correction notice. Filed as: DEACON CONSTRUCTION LLC |
| 1900 K St City of Sacramento · APN 007-0084-023-0000 | Commercial tenant improvement COM-2421894Portal ↗ | Issued Jan 7, 2025 95d review | Finaled | $20,000 | EPC - Remodel of men's restroom (144 sq. ft.) on the first floor of a commercial building to create an all-gender family restroom. Filed as: DEACON CONSTRUCTION LLC |
| 6366 Mack Rd City of Sacramento · APN 117-0012-019-0000 | Commercial tenant improvement COM-2323448Portal ↗ | Issued Dec 10, 2024 404d review | Issued | $5,000,000 | EXPEDITED - EPC. OCC: M, A-2, S-2; Type V-B. Sprinklered. 58,165 sqft grocery exterior and interior remodel. Separate permits: racking; exterior signage. - PLNG-INSP Filed as: DEACON CONSTRUCTION LLC |
| 3011 39th St City of Sacramento · APN 014-0172-032-0000 | Plan revision / deferred submittal COM-2425561Portal ↗ | Applied Nov 20, 2024 | Complete | — | EXPEDITED - EPC - REVISION TO PLANS FOR PERMIT: COM-2315053 CORRECTING ADDRESS & REMOVING ERRC MONITORING POINTS. Filed as: DEACON CONSTRUCTION LLC |
| 8470 Belvedere Ave 2 City of Sacramento · APN 061-0140-057-0000 | Commercial tenant improvement COM-2408635Portal ↗ | Issued Jul 19, 2024 88d review | Finaled | $7,000 | EPC - Project is located within Unit 2 of existing building. Addition of (12) rack shelving at 8' high and outlets for forklifts. Filed as: DEACON CONSTRUCTION LLC |
| 1707 J St City of Sacramento · APN 006-0066-017-0000 | Commercial tenant improvement COM-2409188Portal ↗ | Issued Jun 18, 2024 50d review | Finaled | $12,500 | EPC - REMODEL WORK IS LIMITED TO MINOR INTERIOR DEMOLITION AND REPAIR/REPLACEMENT OF FINISHES. Filed as: DEACON CONSTRUCTION LLC |
| 3011 39th St City of Sacramento · APN 014-0172-032-0000 | Plan revision / deferred submittal COM-2412684Portal ↗ | Applied Jun 10, 2024 | Complete | — | EPC. Type VA, OCC R-2. Revision to COM-2221219. Relocation of trellis, increase in size of trellis and the addition of lights and fans to the trellis. New HVAC units to the 2nd floor corridor and maintenance room. See attached narrative. Filed as: DEACON CONSTRUCTION LLC |
| 3900 Broadway City of Sacramento · APN 014-0172-032-0000 | Plan revision / deferred submittal COM-2412321Portal ↗ | Applied Jun 5, 2024 | Complete | — | EPC. Deferred from COM-2221219 Broadway 39 Affordable Apartments. Filed as: DEACON CONSTRUCTION LLC |
| 1400 P St City of Sacramento · APN 006-0286-025-0000 | Remodel / interior alteration COM-2408722Portal ↗ | Issued May 13, 2024 20d review | Finaled | $38,926 | EOTC- THE PROPOSED BUILDING ENCLOSURE REPAIR IS TO BE CONSIDERED 'LIKE FOR LIKE' AND TO INCLUDE EXTERIOR WALL CLADDINGS, AND METAL TRANSITION/SADDLE FLASHING, AND WATERPROOF PEDESTRIAN TRAFFIC COATING. WORK TO BE LIMITED TO BUILDING 'A' UNITS 227, 234, 327, 334. REFER TO DESIGN DOCUMENTS AND PROJECT MANUAL FOR FULL DESCRIPTION OF WORK. Filed as: DEACON CONSTRUCTION LLC |
| 3011 39th St City of Sacramento · APN 014-0172-032-0000 | Plan revision / deferred submittal COM-2406965Portal ↗ | Applied Apr 2, 2024 | Complete | — | EPC Deferred from COM-2221219. Type VA; R-2 Occupancy. Filed as: DEACON CONSTRUCTION LLC |
| 3011 39th St City of Sacramento · APN 014-0172-032-0000 | Plan revision / deferred submittal COM-2405998Portal ↗ | Applied Mar 20, 2024 | Complete | — | EPC. Type: VA; OCC: R-2. Removal of water submeters that are not required to be installed. See attached narrative in app file. Filed as: DEACON CONSTRUCTION LLC |
| 8470 Belvedere Ave City of Sacramento · APN 061-0140-057-0000 | Commercial tenant improvement COM-2320799Portal ↗ | Issued Mar 1, 2024 154d review | Finaled | $120,000 | EXPEDITED 10,5,5- EPC - Project is located within Unit B of existing building, 11,060 SF tenant improvement for Tesla semi/auto-service repair use with ancillary office. Use is not open for public/customers, only employee are allowed. Addition of (1) new high speed fabric door to interior of (1 of 2) existing roll-up door. 4 parking spaces are being relocated from being in front of Unit B to Unit A, net 0 changes to total number of parking spaces for parcel. Filed as: DEACON CONSTRUCTION LLC |
| 2951 Benefit Way City of Sacramento · APN 225-1960-034-0000 | Commercial tenant improvement COM-2327088Portal ↗ | Issued Jan 26, 2024 36d review | Finaled | $220,000 | EPC - EXPEDITED - Remodel for Dermatology Suite. Demo interior walls, build new interior walls, new lighting, new electrical receptacles, new plumbing, new supply & returns for remodel of existing office space. Filed as: DEACON CONSTRUCTION LLC |