Sacramento 95823 · Valley Hi / North Laguna · APN 117-0170-086-0000 · City of Sacramento
Zoned H-R in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $662,000 ($583,000–$741,000).
Public building records show issued construction/renovation work on this parcel (138 total permits, latest Jun 3, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
all of the lot of the parcel intersects Zone X: 0.2% annual chance flood hazard (shaded X). Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Commercial tenant improvement (COM-2526614): Pending in review for 11 mo (5.3× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$662,000
Benchmark range: $583,000 – $741,000
Closest lead: La Quinta Inn on Stockton Blvd (0.37 mi N, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$666/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 1 demolition.
1 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
242 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of H as public / institutional, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 8.8 yr (since Jan 10, 2018), with no new permit record in 8.5 yr. · $7,000,000 declared valuation
In "Approved" for 6.7 yr (since Feb 20, 2020), with no new permit record in 6.4 yr.
Permit issued and active for 4.5 yr (first record May 24, 2022), with no completion or new permit record in 2.7 yr. · 2 units · $204,609 declared valuation
Nearby permit (c8854f4d37a765c82eb14f3f2f64d7011ccdbd98): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (8057 Arroyo Vista Dr): First appeared in published agency feed
Record RES-2621623 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (6366 Mack Rd): Status changed from Verify to Complete
Record COM-2620887 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (7501 Hospital Dr): First appeared in published agency feed
Record SIG-2621993 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby electrical / panel (6280 Bamford Dr): First appeared in published agency feed
Record RES-2623875 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (6600 Bruceville Rd): Status changed from Issued to Finaled
Record COM-2510662 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (6680 Valley Hi Dr): First appeared in published agency feed
Record COM-2622581 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (6792 Bodine Cir): First appeared in published agency feed
Record RES-2622895 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (6900 Cherrywood Cir): First appeared in published agency feed
Record RES-2623199 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (7996 Grandstaff Dr): Status changed from Issued to Expired Permit
Record RES-2522113 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (63 Abbeywood Cir): Status changed from Issued to Finaled
Record RES-2618535 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (85 Quinta Ct): First appeared in published agency feed
Record COM-2622465 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (6471 Weatherford Way): First appeared in published agency feed
Record RES-2622178 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (8 Bonaventure Ct): Status changed from Issued to Finaled
Record RES-2620825 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (6426 Mack Rd): Status changed from Process Wait to Issued
Record COM-2617526 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Fee estimate" for 8.8 yr (since Jan 10, 2018), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($7,000,000 declared valuation across 2 permits).
Pending in review for 11 mo (5.3× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Issued after 8 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Issued after 2 mo — slower than 90% of hvac / heat pump permits in City of Sacramento (median 0d, 90th pct 2d, n=19,324).
Issued after 9 mo (4.6× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Issued after 2 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 11,290 parcels
+2.3% YoY
City baseline: 30.4 / 1k
176 in trailing 24m
Includes 11 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Kaiser Foundation Health Plan Merged: Kaiser Foundation Health Plan Inc · KAISER FOUNDATION HEALTH PLAN INC | Plan revision / deferred submittal | 72 on parcel110 in ½ mi | $34,565,342 | 17 vs 12 prior+42% |
| Swinerton Builders | Commercial tenant improvement | 13 on parcel15 in ½ mi | $5,974,650 | 1 vs 3 prior |
| Xl Construction | Commercial tenant improvement |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| New commercial / non-residential building |
HUD Small Area Fair Market Rent · ZIP 95823
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($6,600/yr) + local voter-approved bond debt ($924/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$31,658/yr
Cash needed: $145,200
NOI: $8,390/yr
P&I: $3,337/mo
For $0/mo net cash flow
At $1,975/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,817/mo | −$2,865/mo | -23.7% | $5,816/mo | −$2,854/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,975/mo | −$2,638/mo | -21.8% | $5,383/mo | −$2,515/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,094/mo | −$2,508/mo | -20.7% | $5,258/mo | −$2,257/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Finaled / completedAug 12, 2019 – Aug 21, 2020
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
canopy site work
EPC - The project consists of the extending the existing canopy on the north side of the MOB 4 900 sq ft trauma center. The canopy will be extended around the west side of the building to provide additional weather protection and lighting for patients that will be served by the existing interventional radiology imaging trailer (on the north side of MOB 4). also to include electrical and fire protection
Remodel at Kaiser MOB 2- Treatment Center
EPC - Area of work- 1000SF. Construction type- VA. Occupancy- B. Remodel for alternative treatment center at Kaiser.
Kaiser- South Sacramento Medical Center
EPC - Area of work- 5,485 SF. The City’s review is primarily limited to exterior work such as trenching, grading, erosion control, and above-ground appurtenances (pump/control pads, vents, etc.) associated with the installation of one (1) above-ground potable water tank, three (3) underground wastewater tanks, one (1) underground fuel tank, and one (1) above-ground fuel tank for OSHPD-mandated emergency backup service. Please see the PLANS for detailed scope of work.
Replace ATS Control Panel
EPC - Add a remote generator and ATS controls in the Outpatient Surgery building. Generators are located in a HCAi Building (OSHPD), not in this permit scope. Air Quality approval required.
Kaiser Remodel
EPC - DOOR AND LOCK SYSTEM REPLACEMENT ON THE FIRST FLOOR FOR MOB DAN B. MOORE OF 19 DOORS WITH ELECTRICAL AND SECURITY UPDATES. MINOR PATCHING AND PAINTING OF WALLS AND CEILINGS AS REQUIRED. PROJECT AREA IS APPROXIMATELY 285. ELECTRICAL WORK INCLUDES LOW VOLTAGE (DATA) AND LINE VOLTAGE (POWER).
Replace Doors and Lock Systems.
EPC - DOOR AND LOCK SYSTEM REPLACEMENT ON THE FIRST AND SECOND FLOORS FOR MOB OSS OF 42 DOORS WITH ELECTRICAL. MINOR PATCHING AND PAINTING OF WALLS AND CEILINGS AS REQUIRED. PROJECT AREA 555 SF. Electrical work includes low voltage (data) and line voltage (power).
Wall Mounted Monitor
EPC - Installing a new name board monitor, receptacle and data outlet. "FOR PHARMACY NAME CALLING IN PHARMACY 1."
Kaiser- MOB 3 Access Control Upgrades
EPC - Area of work- 375 SF. Construction type- 1A. Occupancy- B. Door and door hardware replacement, remove triology door locks and replace with card readers. Add auto release buttons at each of the reception desks for door. This will be for first, second and third floors, for a total of 25 doors. There will be patching and painting of walls and ceilings as required at the areas of work.
Kaiser MOB2 - Door hardware & Lock Remodel
EPC - SCOPE OF WORK INCLUDES DOOR HARDWARE AND DOOR REPLACEMENT ON THE FIRST, SECOND AND THIRD FLOORS AT 6600 BRUCEVILLE ROAD FOR MOB 2. THE MOB IS THREE (3) LEVELS. THE FACILITY IS SWITCHING FROM THEIR TRILOGY LOCK AND SECURITY SYSTEM TO A CARD READER SYSTEM. THERE ARE A TOTAL OF 20 DOORS (APPROXIMATELY 300 SF OF DISTURBANCE) WITH ELECTRICAL AND SECURITY SCOPE OF WORK AT THE DATA AND ELECTRICAL ROOMS. THERE IS MINOR PATCHING AND PAINTING OF WALLS AND CEILINGS AS REQUIRED AT THE AREAS OF WORK. EXISTING EGRESS COMPONENTS SUCH AS STAIRS, PASSAGEWAYS AND ELEVATORS ARE TO REMAIN EXISTING AND UNAFFECTED BY SCOPE OF WORK.
Kaiser MOB1 - Door hardware & Lock Remodel
EPC - SCOPE OF WORK INCLUDES DOOR HARDWARE AND DOOR REPLACEMENT ON THE FIRST AND SECOND FLOORS AT 6600 BRUCEVILLE ROAD FOR MOB 1. THE MOB IS THREE (3) LEVELS, THERE IS NO SCOPE OF WORK ON THE THIRD (3RD) FLOOR. THE FACILITY IS SWITCHING FROM THEIR TRILOGY LOCK AND SECURITY SYSTEM TO A CARD READER SYSTEM. THERE ARE A TOTAL OF 29 DOORS (APPROXIMATELY 435 SF OF DISTURBANCE) WITH ELECTRICAL AND SECURITY SCOPE OF WORK AT THE DATA AND ELECTRICAL ROOMS. THERE IS MINOR PATCHING AND PAINTING OF WALLS AND CEILINGS AS REQUIRED AT THE AREAS OF WORK. EXISTING EGRESS COMPONENTS SUCH AS STAIRS, PASSAGEWAYS AND ELEVATORS ARE TO REMAIN EXISTING AND UNAFFECTED BY SCOPE OF WORK.
6600 Brucevile Rd HVAC Changeout
EPC - Replacement of two split system DX fan coil units and condensing units with two new split system units.
Kaiser Parking Garage Screening
EPC - Providing screening at 2nd 3rd, 4th and 5th level of existing parking garage in Kaiser South Sacramento Medical Center. - PLNG-INSP
Kaiser South - Emergency Expansion Revision #10
EPC - Revision to COM-1915154 for revised Civil drawings and details
PERMIT TO COMPLETE EXPIRED SIG-2105652 - Install 5 Signs - 6600 Bruceville Rd. - Kaiser
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
29.05 acres
Assessor's classification for assessment purposes. This is not zoning.
6600 BRUCEVILLE RD
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 117-0170-086-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| $2,643,560 |
| 2 vs 4 prior |
| Whittington Electric | Remodel / interior alteration | 2 on parcel7 in ½ mi | $1,265,904 | 0 vs 1 prior |
| The Whiting Turner Contracting | Plan revision / deferred submittal | 5 on parcel5 in ½ mi | $1,196,470 | 0 vs 2 prior |
| Illuminated Creations | Sign | 5 on parcel5 in ½ mi | $108,400 | 0 vs 0 prior |
| Roebbelen Contracting | Commercial tenant improvement | 3 on parcel4 in ½ mi | $2,853,931 | 8 vs 10 prior−20% |
| Alliance Roofing | Roof replacement | 2 on parcel2 in ½ mi | $1,154,239 | 0 vs 0 prior |
| Johnson Controls Fire Protection | Fire alarm / sprinkler | 2 on parcel2 in ½ mi | $3,500 | 0 vs 1 prior |
| Dpr Construction A General Partnership | Commercial tenant improvement | 1 on parcel1 in ½ mi | $5,965,361 | 2 vs 5 prior |
| 150 |
| 155d |
| 241d |
| 334d |
| 498d |
| 229d(vs 293d prior) |
| Accessory dwelling unit (new or conversion) | 1,693 | 57d | 97d | 172d | 284d | 97d(vs 103d prior) |
| Addition (adds square footage)On this parcel | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
PERMIT TO COMPLETE WORK COMMENCED ON EXPIRED PERMITS SIG-2314471, SIG-2105652 & SIG-2202579 -Install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign.
6600 BRUCEVILLE RD - Remodel Electrical
EPC - THIS PROJECT INVOLVES THE INSTALLATION OF TWO (2) NEW PARKING GUIDANCE SIGNS AT EACH ENTRANCE AND FOUR (4) WIRELESS REPEATERS FOR A NEW PARKING GUIDANCE SYSTEM AT THE NEW PARKING STRUCTURE. EACH REQUIRES 120-VOLT POWER AND WILL BE ATTACHED TO THE STRUCTURE. EXISTING OCCUPANCY AND USE IS NOT MODIFIED BY THE SCOPE OF WORK.
Kaiser South Emergency Expansion - Revision #9
EPC - Revision to COM-1915154 for electrical
REMODEL (ADD SINK)
EPC - Install new sink with associated piping.
Kaiser MOB3 Remodel- Revised PLANS
EPC - Revision to (COM-2223185) approved PLANS and reduced scope. Please see the SUPP file for detailed narrative.
PERMIT TO COMPLETE EXPIRED SIG-2105652 - Install 5 Signs - 6600 Bruceville Rd. - Kaiser
PERMIT TO COMPLETE WORK COMMENCED ON EXPIRED PERMITS SIG-2105652 & SIG-2202579 -Install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign.
Parking Lot Improvements
EPC - Replacement of existing surface parking with accessible parking lot improvements. The disturbed area is approximately 2,802 square feet.
Commercial Remodel
EPC - The scope is Interior Alterations. Project is located on level one of the Outpatient Surgery Services Bldg. Scope is to upgrade Ptube system and replacement of one existing diverter and two Ptube stations. We will alter the existing 6” tubing as required along with the power and data as required for the new equipment.
Kaiser MOB3 Remodel-DEFERRED FIRE ALARM
EPC - DEFERRED FIRE ALARM TO COM-2223185-REMODEL TO KAISER MOB 3. FIRE PLANS WERE SUPPOSED TO BE INCLUDED IN THE CYCLE 2 SUBMITTAL FOR THE REMODEL BUT WERE NOT, THEY ARE INCLUDED HERE AS A DEFERRED SUBMITTAL FOR REVIEW PURPOSES.
Kaiser South - Emergency Expansion Revision #7
EPC - Revision to COM-1915154 for revised Landscape and Civil drawings and details
Kaiser South - Emergency Expansion Revision #6
EPC - Revision to COM-1915154 for revised Landscape and Civil drawings and details
Washer and Sterilizer Replacement - Plumbing Updates
EPC - EXPEDITED - Revision to (COM-2219884) plumbing scope shown for the Sterrad Sterilizers, which includes the following- Removal of new floor sinks from the project, updating architectural plans to show the extent of concrete demo & patch back due to new plumbing line- there were concrete infill/patch back on the approved plans. Update plans to show extent of flooring. Relocating existing power data & wall mounted monitor/computers to adjacent wall. Changing outlet to hardwire for a drying cabinet. Adding check/pressure valves to plumbing lines. Clarification on sign placements.
Washer and Sterilizer Replacement at Kaiser- South Sacramento
EPC - Size- 1205 SF. Construction type- 1A. Occupancy- I2, B. Location of this project is at Kaiser S. Sacramento Outpatient Surgery Center- Sterile and decontamination Rooms. Replacement of the existing sterilizers, washer/disinfectors, pass-through windows, and cart washer with new equipment. Scope also includes removal or an anteroom and extending gypsum board to the deck on the walls separating the sterile and decontamination spaces.
KAISER - LIGHTING RETROFIT
EPC - 1-for-1 interior LED Lighting retrofit in medical office building 3
KAISER - LIGHTING RETROFIT
EPC - 1-for-1 Interior LED Lighting Retrofit in Atrium Great Hall. (There shall be no building construction, re-circuiting, or re-wiring of any fixtures.)
Kaiser - Water Heater Replacement
EPC - MOB II - Replacement of two (2) 204 gallon gas water heaters.
EOTC - Electrical - EXTERIOR Site Lighting
EXPEDITED - EOTC - EPC - Existing Site lighting replacement. Replace old with new energy efficient LED. Existing poles to be reused. Existing circuits to be reused. Site work ONLY
Kaiser Med Office Bldg 1 - Waiting/Reception Remodel - Revision 2
EPC - Architectural revisions per narrative for COM-2105002.
REVISION TO SIG-2202579 - REVIEW COMPLETED ON EXPIRED SIG-2105652
EPC - REVISION TO SIG-2202579 - revise the attachment method and engineering calcs of the building-mounted "Welcome" sign (sign 07 on the plans) PERMIT TO COMPLETE EXPIRED, REVIEW COMPLETED ON SIG-2105652 - Install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign
PERMIT TO COMPLETE EXPIRED SIG-2105652 - Install 5 Signs - 6600 Bruceville Rd. - Kaiser
PERMIT TO COMPLETE EXPIRED, REVIEW COMPLETED ON SIG-2105652 - Install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign REVISION COM-2202959 - revise the attachment method and engineering calcs of the building-mounted "Welcome" sign (sign 07 on the plans)
EXPIDITED-remodel
EPC -EXPIDITED- Renovation of existing office into an exam room. Project includes new finishes, electrical, mechanical, and plumbing utilities.
Kaiser Med Office Bldg 1 - Waiting/Reception Revisions
EPC - Architectural, electrical and alarm revisions per narrative for COM-2105002 - Remodel of Kaiser Sacramento medical office building 1
REVISION TO COM-2119317
EPC - REVISION TO COM-2119317::DELTA # 2 REVISIONS- Access Barrier Removal - Drinking Fountain Replacement Project - MOB 2 BLDG. Originally specified Motion Sensor Retrofit kit that was to be installed at third floor drinking fountain was found to not be compatible with the existing drinking fountain. We will now be replacing the third floor drinking fountain with a new hi lo drinking fountain with motion control sensor and water bottle filler.
KAISER - RAMP-PARKING STALLS-WHEELCHAIR LIFT
EPC - Removal of existing ramp and construction of new accessible ramp. Addition of new accessible parking stalls and alteration to path of travel to building entry. Replacement of existing non-compliant wheelchair lift with new accessible lift; (N) LANDSCAPING
REVISION TO COM-2113392
EXPEDITED - EPC - REVISION TO COM-2113392: Modification of (e) casework, electrical panel relocation and additional equipment added to project scope. See sheets: A101, A102, E3.1, E3.2, E5.1
remodel
EPC - Replacement of Drinking Fountain with sensor operated fountain and bottle filler. electrical work
Drinking Fountain Replacement (OSS)
EPC - OSS- Replacement of Drinking Fountain Units
Drinking Fountain Replacement (M.O.B. #3)
EPC - M.O.B. #3 - Replacement of Drinking Fountain Units
Drinking Fountain Replacement (M.O.B. #2)
EPC - M.O.B. #2) Replacement of Drinking Fountain Units **** - SEE REVISION COM-2201020::DELTA # 2 REVISIONS- Access Barrier Removal - Drinking Fountain Replacement Project - MOB 2 BLDG. Originally specified Motion Sensor Retrofit kit that was to be installed at third floor drinking fountain was found to not be compatible with the existing drinking fountain. We will now be replacing the third floor drinking fountain with a new hi lo drinking fountain with motion control sensor and water bottle filler.****
Drinking Fountain Replacement - M.O.B. #1
EPC - M.O.B. #1 - Replacement of Drinking Fountain Units
Drinking Fountain Replacement (M.O.B. #1)
EPC - M.O.B. #1 - Replacement of Drinking Fountain Units
Commercial Remodel (Bruceville Kaiser)
EXPEDITED - EPC - Renovation of two existing outpatient procedure rooms including infrastructure for new equipment. SEE REVISION COM-2125635: Modification of (e) casework, electrical panel relocation and additional equipment added to project scope. See sheets: A101, A102, E3.1, E3.2, E5.1
Install 5 Signs - 6600 Bruceville Rd. - Kaiser
Install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign
Kaiser Med Office Bldg 1 - Waiting/Reception Remodel
EPC - Remodeling several waiting rooms and receptions desks on the 1st and 2nd level at the Kaiser Sacramento medical office building 1 including revisions to electrical, mechanical and plumbing as required for new layout.
water heater
EXPEDITED - EPC - Addition of a 20 gallon water heater inside the EVS room of MOB2.
Kaiser South - Coffee Bar
EPC - RENOVATION OF A VACATED STORE INTO A COFFEE/REFRESH BAR AND PROVIDE A LINK TO THE COURTYARD. PROJECT INCLUDES NEW FINISHES AND ELECTRICAL, MECHANICAL AND PLUMBING UTILITIES.
mob 2 electrical
EPC - MOB 2 - 1-for-1 Interior LED Lighting Retrofit
kaiser light remodel
EPC - 1-for-1 Interior LED Lighting Retrofit. SEE REVISION COM-2111661: 1-for-1 Interior LED Lighting Retrofit. See narrative for additional details
Kaiser South - OSHPD Addition (Emergency Expansion)
EPC - Addition to Commercial Building - OSHPD Building is 41,525 sq. ft. 1 story, type 1A construction, disturbed acres is 3.7, The City of Sacramento is responsible for the Site work and landscape to accommodate the expansion building and reroute underground utilities, existing campus roadways will need to be reconfigured. - PLNG-INSP REVISIONS: COM-2018754 COM-2020300 COM-2023397 COM-2105914 COM-2110822 COM-2309829 COM-2311335 COM-2314353 COM-2323972
REROOF - MOB #1
MOB #1 - Remove exisitng TPO roof and install new TPO roof - 340-SQ
kaiser remodel
EPC - 1. REPLACE EXISTING CASEWORK AND PROVIDE ADA COMPLIANT CASEWORK & HEIGHT ADJUSTABLE WORKSTATIONS WITHIN THE BACK OF HOUSE HALLWAYS. 2. REMOVE EXISTING PNEUMATIC TUBE STATION AND SURROUNDING WALL ENCLOSURE. SQUARE- OFF ADJACENT WORKROOM AND RECONFIGURE CASEWORK. 2ND FLOOR AREA OF WORK: 3,526 SF 3RD FLOOR AREA OF WORK: 2,064 SF * ALTERATIONS SOLELY FOR THE PURPOSE OF BARRIER REMOVAL UNDERTAKEN PURSUANT TO THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT (PUBLIC LAW 101-336, 28 C.F.R., SECTION 36.304) OR THE ACCESSIBILITY REQUIREMENTS OF THIS CODE AS THOSE REQUIREMENTS OR REGULATIONS NOW EXIST OR ARE HEREAFTER AMENDED CONSISTING OF ONE OR MORE OF THE FOLLOWING ITEMS SHALL BE LIMITED TO THE ACTUAL SCOPE OF WORK OF THE PROJECT AND SHALL NOT BE REQUIRED TO COMPLY WITH SECTION 11B-202.4.
Kaiser MOB #1
EPC Submittal - Remodel of Commercial Building - THE PROJECT IS LOCATED WITHIN THE 1ST FLOOR OF SOUTH SACRAMENTO MOB BUILDING 1. THE PROPOSED SCOPE OF WORK CONSISTS OF RENOVATION OF AN EXISTING OUTPATIENT PHARMACY. PROJECT SCOPE INCLUDES: 1.REMOVING (1) EXISTING POINT-OF-SALES STATION AND ADD (3) NEW POS STATIONS TO CREAT AN L-SHAPE LAYOUT. THIS LAYOUT PROVIDES A TOTAL OF 10 STATIONS INCLUDING DROP-OFF/ PICK-UP/ CONSULT FUNCTIONS. NEW POS STATIONS WILL HAVE NEW ARCHITECTURAL CASEWORK FRONTS, EXISTING POS STATIONS WILL HAVE NEW FINISHES AS A RE-FACE. 2.NEW (2) ROLL-DOWN DOORS AT THE MAIN CORRIDOR FOR ACCESS TO THE QUEUING AREA AND (1) SWING DOOR FOR EMERGENCY EXIT. 3.NEW (1) ROLL-DOWN DOOR AT THE EXISTING FIRE RATED SEPARATION BETWEEN MOB 1 AND MOB 2. 4.NEW CEILING TILES. 5.NEW FLOORING. 6.NEW IT AND ELECTRICAL SYSTEM AT NEW POS. THIS PROJECT IS AN INTERIOR TENANT IMPROVEMENT AND NO CHANGE IN THE BUILDING FOOTPRINT OR EXTERIOR MODIFICATIONS ARE INVOLVED.
6600 Bruceville - Remodel
EXPEDITED - Upgrading medical assistants work stations. Relocating existing receptacles to allow adjustable work tables.
EPC Submittal - Deferred/Revision to Issued Permit COM-1919169 - Installing additional casework at the east wall of the conference rooms, demo (1) existing sink, lower power and data on the east wall, provide site details for truncated dome installation.
Kaiser MOB-2 Oncology Pharmacy Retrofit
(Bldg MOB 2) Flashing retrofit to hoods, furniture modifications, duct modifications to existing HD buffer room to comply w/ USP 800 & 797 and add power outlets for the undercounter refrigerators
Kaiser MOB #1 & #2
EPC Submittal - Remodel of Commercial Building - THE PROJECT IS LOCATED WITHIN THE 1ST FLOOR OF SOUTH SACRAMENTO MOB BUILDING 1. THE PROPOSED SCOPE OF WORK CONSISTS OF RENOVATION OF AN EXISTING OUTPATIENT PHARMACY. PROJECT SCOPE INCLUDES: 1.REMOVING (1) EXISTING POINT-OF-SALES STATION AND ADD (3) NEW POS STATIONS TO CREAT AN L-SHAPE LAYOUT. THIS LAYOUT PROVIDES A TOTAL OF 10 STATIONS INCLUDING DROP-OFF/ PICK-UP/ CONSULT FUNCTIONS. NEW POS STATIONS WILL HAVE NEW ARCHITECTURAL CASEWORK FRONTS, EXISTING POS STATIONS WILL HAVE NEW FINISHES AS A RE-FACE. 2.NEW (2) ROLL-DOWN DOORS AT THE MAIN CORRIDOR FOR ACCESS TO THE QUEUING AREA AND (1) SWING DOOR FOR EMERGENCY EXIT. 3.NEW (1) ROLL-DOWN DOOR AT THE EXISTING FIRE RATED SEPARATION BETWEEN MOB 1 AND MOB 2. 4.NEW CEILING TILES. 5.NEW FLOORING. 6.NEW IT AND ELECTRICAL SYSTEM AT NEW POS. THIS PROJECT IS AN INTERIOR TENANT IMPROVEMENT AND NO CHANGE IN THE BUILDING FOOTPRINT OR EXTERIOR MODIFICATIONS ARE INVOLVED.
site work stair replacement
removing and replacing existing concrete stairs/guradrails and path from building to the access road.
Kaiser South - Thrive Store Revision
EPC Submittal - Deferred/Revision to Issued Permit COM-1816562 - Provide fire rated glazing, frames, doors, hardware and rolling door for the existing 1-hr fire rated corridor. Revise/simplify ceiling layout, lighting, power/data outlets, finishes, and casework per owner request. Revise mechanical layout due to found conditions. Remove sink per owner request. Provide new signage to meet current facility standards.
EPC Submittal - Deferred/Revision to Issued Permit COM-1818718 - Install Digital Signage in Conference Rooms.
Kaiser South -
Revision to Issued Permit COM-1919169 - for partitions, lighting locations and walls.
Kaiser South - Conference Remodel Revision
EPC - Revision to Issued Permit COM-1919169 - for partitions, lighting locations and walls.
Kaiser South - MOB 2 Building Conference Rooms
EPC - Replacement permit for COM-1801955 due to change of permit holder (different contractor)
Kaise South - MOB2 Elevator & equipments
EXPEDITED 15,10,10 - EPC Submittal - Remodel of Commercial Building - PERMIT TO REPLACE EXPIRED PERMIT COM-1806799 AND TO INCLUDE ADDITIOANL SCOPE. The projects consists of upgrading the controls and all associated components for three hydraulic elevators (Elevators 9, 10 and 11) in the MOB-2 building (3 story building) at the South Sacramento Medical campus. The elevator machine rooms are located on the first floor and not located over the shaft. Includes facility requested and code required fire sprinklers and fire alarm modifications and other code required upgrades.
kaiser electrical
EPC Submittal - Remodel of Commercial Building - THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS TO ADD (2) DUPLEX RECEPTACLES AND DATA OUTLET IN WORK STATION AREA, M1248. SHOULD ANY CONDITIONS DEVELOP, NOT COVERED BY THE CONTRACT DOCUMENTS, WHEREIN THE FINISHED WORK WILL NOT COMPLY WITH ALL REQUIRED CODES, A CHANGE ORDER DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO, AND APPROVED BY, THE AGENCY BEFORE PROCEEDING WITH THE WORK.
Kaiser Addition
Addition to Commercial Building - OSHPD Building, The City of Sacramento will inspect the Site work and landscape to accommodate the expansion building and reroute underground utilities, existing campus roadways will need to be reconfigured.
Kaiser South - Thrive Store and Health Education Office at MOB 2
EPC - Remodel and consolidate the existing Health Education office and “Thrive” store, total of 1,485 SF into one space on its first floor at MOB 2 Building
EPC Submittal - Remodel of Commercial Building - THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS TO ADD (2) DUPLEX RECEPTACLES AND DATA OUTLET IN WORK STATION AREA, M1248. SHOULD ANY CONDITIONS DEVELOP, NOT COVERED BY THE CONTRACT DOCUMENTS, WHEREIN THE FINISHED WORK WILL NOT COMPLY WITH ALL REQUIRED CODES, A CHANGE ORDER DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO, AND APPROVED BY, THE AGENCY BEFORE PROCEEDING WITH THE WORK.
EPC Submittal - Remodel of Commercial Building - The projects consists of upgrading the controls and all associated components for three hydraulic elevators (Elevators 9, 10 and 11) in the MOB-2 building (3 story building) at the South Sacramento Medical campus. The elevator machine rooms are located on the first floor and not located over the shaft. Includes facility requested and code required fire sprinklers and fire alarm modifications and other code required upgrades.
EPC Submittal - Deferred/Revision to Issued Permit COM-1818718 - Plans revised to remove the following from scope of work/permit: 1.)New partitions in the conference rooms removed from scope. 2.) Scope of work to upgrades restrooms for accessibility removed due to decrease in construction cost. 3.) Partial site work removed from scope. 4.) Upgrades to telephone and signage at main entry/lobby removed from scope due to reduction in construction
Kaiser South Outpatient - REVISION 1
EPC - Revision to Issued Permit COM-1818718 - Plans revised to remove the following from scope of work/permit: 1.)New partitions in the conference rooms removed from scope. 2.) Scope of work to upgrades restrooms for accessibility removed due to decrease in construction cost. 3.) Partial site work removed from scope. 4.) Upgrades to telephone and signage at main entry/lobby removed from scope due to reduction in construction
IT RACKS -Electrical Relocation (Room- M-2123)
EXPEDITED - Room # M 2123- Electrical relocation of FOUR outlets for (N) I.T- Racks; Installation of (N) I.T. Racks
Sprint Cell Tower
Remove 3 existing 2.5 radios and swap 3 existing 2.5 antennas with 3 new MIMO antennas and 2 new hybrid cables. No Ground work to be performed.
Kaiser
EPC - PERMIT TO FINAL EXPIRED PERMIT COM-1611032: MOB 3, Demolition of existing partitions including roll down door, ceiling, electrical/data, millwork, and furniture/fixtures. New partitions,ceiling, electrical/data, millwork, mechanical, fire alarm, and furniture/fixtures. New finishes, paint, and flooring
EPC Submittal - Remodel and Change of Use of Commercial Building - Demolition of existing partitions including roll down door, ceiling, electrical / data. millwork, and furniture fixtures. Alteration of existing space including new partitions, ceiling, electrical / data, millwork, mechanical, fire alarm and electrical work per plans. New Finishes, paint and flooring. No fire sprinkler work required. Not adds or relocations.
Kaiser South - Outpatient Remodel
EPC - Remodeling of the seven (7) existing conference rooms at the Outpatient Surgery Center including ADA upgrades to existing multi-user women's & men's restroom, interior and exterior parking signage. Total area of work: 2,050 SQFT.
REVISION TO COM-1812130
REVISION TO COM - 1812130: New sub panel in M 2113
Revision to Com-1812130
EXPEDITED - Revision to Com-1812130 Minor ductwork revisions to supply & exhaust duct. 2 exhaust lines ran from exhaust fans in counter to exterior façade.
Kaiser South - Replace Sump Pump at MOB 3
EPC - Additional scope to issued permit COM-1806811. The additional scope to replace sump pump and other revisions on the approved plans are responses to a checklist that needs to be completed prior to scheduling Inspection by the State Elevator inspector.
Kaiser - Electrical Lighting (Exam Rooms - # M2226 & M2228)
Kaiser - Electrical Lighting (Exam Rooms - # M2226 & M2228) to consist of - the replacement of TWO (2) ceiling mounted exam lights; Removal (non replacement) of Three (3) under cabinet lights; Relocation of Four (4) duplex receptacles; Replacement of general lighting and switches in the UROLOGY Dept. located on the Second Floor (M.O.B 2 - Location)
EPC Submittal - Remodel of Commercial Building - Providing plan revisions to the previously city approved plans for Project COM-1806811. These revisions are responses to a checklist issued by OTIS Elevator that needs to be completed prior to scheduling Inspection by the State Elevator inspector.
Kaiser South - Outpatient processing
EXPEDITED - EPC Submittal - remodel of 96 SF of space within the existing sterile processing area of the Outpatient Surgery Services building to create a vestibule for access to the temporary sterile processing trailer (to be installed by others). The remodel includes the installation of two exterior access doors, one from the sterile processing area and one from the decontamination area. Both doors are for exclusive access to the sterile processing trailer and are not for public use. The vestibule will consist of one exterior door with card reader access and a powered door auto-opener and one interior door from the vestibule into the sterile processing area. The decontamination area will have a new exterior access door with card reader access and a powered auto-opener. The decontamination area will also install a new 3-compartment sink and replacement/relocation of the existing 3-compartment sink from another project to replace the existing 3-compartment sink to be removed.
Kaiser South - MOB 2 Building Conference Rooms
EPC - Renovation of Conference Rooms A, B, & C at 3rd floor at the Kaiser South MOB 2 Building.
Kaiser South - Cafeteria Patio
EPC - Remodel for the existing cafeteria patio. Scope of works include installation of concrete paving, seating trash receptacles, vine trellises, lighting, a water feature, to include but not be limited to, grading and drainage, wet utilities, irrigation and landscape planting. Electrical plans to be submitted under separate permit.
Kaiser South - New Compactor
EPC - INSTALLATION OF NEW SELF CONTAINED COMPACTOR IN EXISTING LOADING DOCK AREA.
EPC Submittal - Remodel of Commercial Building - The project consists of the remodel of 96 SF of space within the existing sterile processing area of the Outpatient Surgery Services building to create a vestibule for access to the temporary sterile processing trailer (to be installed by others). The remodel includes the installation of two exterior access doors, one from the sterile processing area and one from the decontamination area. Both doors are for exclusive access to the sterile processing trailer and are not for public use. The vestibule will consist of one exterior door with card reader access and a powered door auto-opener and one interior door from the vestibule into the sterile processing area. The decontamination area will have a new exterior access door with card reader access and a powered auto-opener. The decontamination area will also install a new 3-compartment sink and replacement/relocation of the existing 3-compartment sink from another project to replace the existing 3-compartment sink to be removed.
EPC Submittal - Remodel of Commercial Building - Remodeling of the seven (7) existing conference rooms in the Kaiser S. Sacramento Outpatient Surgery Center. Other work includes ADA upgrades to existing multi-user women's & men's restroom, interior and exterior parking signage. Total area of work: 2,050 SQFT.
Kaiser South - Site Accessibility Improvement
EPC - Scope of work consists of repairing existing truncated domes, concrete ramps and sidewalks for ADA as shown in plans.
Kaiser South - ADA Upgrade btw ASC & DB Moore BLDG
EPC - consist of site accessibility upgrade for replacement of truncated domes, concrete ramps and sidewalks at various location shown on plans.
Kaiser MOB2 Digital HVAC Controls
EPC - FINISHING WORK UNDER EXPIRED PERMIT COM-1601419. MOB 2, The intent of these drawing is to replace obsolete unreliable pneumatic HVAC controls with digital controls. No new HVAC units as part of this scope.
Kaiser South - 7B Remodel
remodel 881 sq ft to include new partitions, electrical, mechanical, plumbing, finishes, install kitchenette, operable partitions and finishes. (See Revision Com-1903820 ) minor ductwork revisions to supply & exhaust duct. 2 exhaust lines ran from exhaust fans in counter to exterior façade (See Revision COM-1904961: New Subpanel in M2113 (See Revision COM-1911405: Updated exhaust fan as original did not meet code)
EPC Submittal - Remodel of Commercial Building - INSTALLATION OF NEW SELF CONTAINED COMPACTOR IN EXISTING LOADING DOCK AREA.
EPC Submittal - Remodel of Commercial Building - the scope is to remodel and to consolidate the existing Health Education office and “Thrive” store into one space on its first floor.
EPC Submittal - Remodel of Commercial Building - Scope of work consists of repairing existing truncated domes, concrete ramps and sidewalks for ADA as shown in plans.
Kaiser South - MOB 3 Door
EPC - Replace existing front door with "Fire Rated" door assembly.
Kaiser Exam Lights
Remove 3 existing ceiling mounted exam lights, install 5 new LED exam lights in the Urology and OB/GYN department.
Kaiser South - MOB 3 Digital control
EPC - Resubmission for expired permit COM-1607217 in order to final the project. Original approval, COM-1607217 is attached for reference
Kaiser
EXPEDITED - MOB #2 Suite 7. Revisions to COM-1805769 include mechanical ducting location, Plumbing pipe location and miscellaneous slab removal.
EPC Submittal - Remodel of Commercial Building - Consist of site accessibility for replacement of truncated domes, concrete ramps and sidewalks at various location shown on plans.
REVISION-Fire Alarm Horn
EXPEDITED - Revision to COM-18125668 change to (2) horns, adding strobes to horns
Fire Alarm Horn
Install 2 fire alarm horns in MOB 2 See Revision COM-1813772 adding two strobes to (2) horns
20 A Circuits (3)
EXPEDITED - Installation of THREE - 20 Amp dedicated circuits for new microwave ovens on the 2nd floor - OB GYN Dept.. ( Room AAMEN 2607 & Room RNSTA 2380)
Revision to COM-1805769
EXPEDITED - Revision to COM-1805769: Incorporating closet from adjacent tenant space into conferencing center (suite 7)
EPC Submittal - Remodel of Commercial Building - The project consists of installation of concrete paving, seating trash receptacles, vine trellises, lighting, a water feature, to include but not be limited to, grading and drainage, wet utilities, irrigation and landscape planting. Electrical plans to be submitted under separate permit.
Kaiser
MOB #2 Suite 7 interior remodel. New interior partitions with associated plumbing/mechanical, electrical, fires sprinklers and alarm. Install new operable partition separating rooms 1916 & 1917. See Revision COM-1810242: Incorporating closet from adjacent tenant space into conferencing center (suite 7). 5/31/18 GL SEE COM-1814701: Revisions to mechanical ducting location, Plumbing pipe location and miscellaneous slab removal.
EPC Submittal - Remodel of Commercial Building - The project consists of upgrading the controls and all associated components for three hydraulic elevators ( Elevators 9, 10 and 11) in the MOB-2 building at the South Sacramento Medical Campus. The elevator machine rooms are located on the first floor and not located over the elevator shaft and is exempt from providing any new fire alarm devices in the elevator hoistway.
EPC Submittal - Remodel of Commercial Building - The project consists of upgrading the controls and all associated components for three hydraulic elevators ( Elevators13 and 14) in the MOB-3 building at the South Sacramento Medical Campus. The elevator machine rooms are located on the second floor and not located over the elevator shaft and is exempt from providing any new fire alarm devices in the elevator hoistway.
Kaiser South - MOB 3 Door
EPC Submittal - Remodel of Commercial Building - Replace existing store front door with "Fire Rated" door assembly.
EPC Submittal - Remodel of Commercial Building - Additional Waiting area lighting, replacing the fluorescent with new LED lighting and controls per Title 24 lighting.
EPC Submittal - Remodel of Commercial Building - Renovation of Conference Rooms A, B, & C in the Kaiser South MOB 2 Building.
Kaiser
EXPEDITED - Remodel waiting room M3110A in MOB 3 (south campus). Relocate and extend electrical outlet and data to east wall for new wall mounted monitor. Infill existing framed openings (two locations) with non-loading framing and gypsum board and repaint.
EPC Submittal - Remodel of Commercial Building - Replace existing fire alarm system with new fire alarm system consisting of new fire alarm control panel, new initiation devices, new notification devices and interconnection with campus wide fire alarm network. (revision COM-1722568 to modify alarm plans CRF 12-8-2017)
Kaiser MOB 2
EXPEDITED - Medical office building 2 adding 5 new digital lobby way finding monitors on the first floor of MOB 2 in the elevator lobby M1C004
Kaiser reroof
remove gravel and existing roof to concrete deck, replace insulation and install new TPO roofing.
kaiser foundation reroof
Tear Off - Yes, Resheet - No, 1 layer(s), 278 squares of TPO Single Ply. In-progress inspection required if 10 squares or greater.
Kaiser-Canopy
EPC - MOB 4, Building a new free standing canopy on the north side of the MOB 4 Trauma Center. The canopy will provide weather protection and light for people waiting to enter the trailer. Increased the canopy size to 52' through cycle 2 and value was increased from $147,000 to $168,597
office remodel
EXPEDITED - remodel existing workstation room 2050 to develop anew general alcove and new work station. area of work 100 sq ft and will include new demising wall, electrical modification for relocation og existing circuit, minor plumbing relocation for new casework and accessible sink counter.
Kaiser-Utility Plant Yard
EPC - Central Utility Plant Yard. Building a new exterior steel open air shade canopy (250 sq. ft.) over an existing steel cogeneration equipment skid. The canopy will provide weather protection for the existing electrical panels.
REMODEL 3RD FL. CONFERENCE ROOM
EXPEDITED - REMODEL 3RD FLOOR CONFERENCE, REPLACE EXISTING VIDEO CONFERENCING EQUIPMENT WITH NEW. (NOT OSHPD)
Kaiser
Central Utility Plant Yard. Building a new exterior steel open air shade canopy (250 sq. ft.) over an existing steel cogeneration equipment skid. The canopy will provide weather protection for the existing electrical panels.
Kaiser
MOB 4, Building a new free standing canopy on the north side of the MOB 4 Trauma Center. The canopy will provide weather protection and light for people waiting to enter the trailer
Kaiser
MOB 3, Demolition of existing partitions including roll down door, ceiling, electrical/data, millwork, and furniture/fixtures. New partitions,ceiling, electrical/data, millwork, mechanical, fire alarm, and furniture/fixtures. New finishes, paint, and flooring
Kaiser
MOB 1, Convert an existing EKG file room (720 sq. ft.) into an open office space.
Urgent Care
Install 2 new signs One attached illuminated and one monument illuminated. "Urgent Care"
Kaiser
MOB 2, Conference Room upgrade of existing and new audio / visual conferencing equipment including electrical, framing and drywall
Kaiser
EXPEDITED - MOB 1, Renovation of existing casework within Orthopedics including relocation of some existing non-emergency and emergency power, lighting and data locations, removal and re-installation of existing sinks for counter top replacement, patching existing flooring, CPU GCX brackets on spanner rails, electrical changes as needed and drywall repair
Kaiser
Shared plans with SIG-1615207, Remove 5 existing faded illuminated directional monument signs leaving the base/footings & replace with 5 new illuminated directional monument signs on existing base/footings. This permit is to replace SIG-1513767
Kaiser
EXPEDITED - MOB 1, The project scope consists of reconfiguration of Electrical, Data and Work Stations to better serve the department work flow. Remove ONE un-necessary Fire Alarm Pull Station.
Kaiser
MOB 3, Demolition of existing partitions, ceiling, lighting, electrical / Data, plumbing, millwork, nurse call devices and furniture, fixtures and flooring. New partitions, ceiling, lighting, electrical / data, plumbing, and millwork. New wall finishes, flooring and furniture installation per plan.
Kaiser
MOB 3, Replace obsolete, unreliable pneumatic HVAC controls with digital controls. No new HVAC units as part of scope.
Kaiser
EPC - Revision to Issued Permit COM-1603791 - Replace a larger portion of the existing curb and walk to address the differential settlement that is currently occurring, add truncated domes, relocate large signs near lot entrance, add notes to slurry seal and restripe at revised stalls to match (E) lot, repaint curbs and relocate several large storage containers to Lot 14.
Kaiser
EPC Submittal - Revision to Issued Permit COM-1603791 - Replace a larger portion of the existing curb and walk to address the differential settlement that is currently occurring, add truncated domes, relocate large signs near lot entrance, add notes to slurry seal and restripe at revised stalls to match (E) lot, repaint curbs and relocate several large storage containers to Lot 14.
Kaiser
MOB 2, The intent of these drawing is to replace obsolete unreliable pneumatic HVAC controls with digital controls. No new HVAC units as part of this scope.
Kaiser
EPC - Parking Lot #16 & 17, Relocation of an existing parking lot light, revision to curb and gutter at entry drive and replace disturbed landscaping, The modification of an on-site parking lot entrance and installation of (2) new automatic swing arm gates with access controls. Also replacing (2) existing automatic swing arm gates.
ELECTRICAL
EXPEDITED - RETROFIT EXISTING LIGHTING FIXITURES WITH LED LIGHT SOURCES IN THE EXISTING PARKING STURCTURE LOCATED AT PROJECT ADDRES. ENERGY REDUCTION, NO STRUCTURAL TO BE DONE.
EPC Submittal - Remodel and Change of Use of Commercial Building - The modification of an on-site parking lot entrance and installation of (2) new automatic swing arm gates with access controls. Also replacing (2) existing automatic swing arm gates.