Active in City of Sacramento (63 permits) · Unincorporated Marin (3 permits)
Raw permit filing name: SWINERTON BUILDERS
36 issued · 17 parcels
vs 4 prior 24m
29 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jun 27, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 33 | 3 | — | $167,380,710 | 51d (n=2) | 41d (93d p75) | — | |
| 22 | 22 | — | $21,175,993 | 90d (n=22) | 63d (119d p75) | Within typical range | |
| 5 | 5 | — | $1,305,858 | 2d (n=5) | 4d (21d p75) | Within typical range | |
| 2 | 2 | — | $70,000 | 30d (n=2) | 14d (29d p75) | — | |
| 1 | 1 | — | $86,713,359 | — | 210d (365d p75) | — | |
| 1 | 1 | — | $300,362 | — | 1d (7d p75) | — | |
| 1 | 1 | — | $11,500 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $40,000 | — | 33d (85d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
$1,196,470 · 56 permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1325 J St City of Sacramento · APN 006-0054-025-0000 | Commercial tenant improvement COM-2421901Portal ↗ | Issued Jun 27, 2025 266d review | Finaled | $406,000 | EPC - COM-2115864 was issued with the requirement for separate accessibility upgrade permits prior to final inspection. This permit is for the path of travel improvements #2 to the entry and elevator. Path of Travel improvements # 1 permit issued under COM-2122454 Filed as: SWINERTON BUILDERS |
| 1325 J St City of Sacramento · APN 006-0054-025-0000 | Plan revision / deferred submittal COM-2412353Portal ↗ | Applied Jun 5, 2024 | Complete | — | EPC - REVISION TO COM-2115864. MECHANICAL AND ELECTRICAL UPDATES FOR THE REPLACEMENT OF THE HEAT PUMP ON LEVEL 1 WITH A NEW UNIT IN A NEW LOCATION CLOSE TO THE EXISTING LOCATION. Filed as: SWINERTON BUILDERS |
| 15 Business Park Way 101 City of Sacramento · APN 062-0010-040-0000 | Commercial tenant improvement COM-2408278Portal ↗ | Issued May 31, 2024 44d review | Finaled | $75,000 | EPC - SUITE 101 - Non-structural alteration of existing spaces to create more private offices by converting existing conference room into 4 offices & dividing 2 existing offices into 3 offices. Filed as: SWINERTON BUILDERS |
| 1325 J St City of Sacramento · APN 006-0054-025-0000 | Commercial tenant improvement COM-2327077Portal ↗ | Issued Mar 5, 2024 76d review | Finaled | $735,619 | EXPEDITED - EPC - Added scope from original permit, COM-2115864. Scope of work includes demolition and remodel of the cafeteria, breakroom, server room, and small office suite. Filed as: SWINERTON BUILDERS |
| 1325 J St City of Sacramento · APN 006-0054-025-0000 | Commercial tenant improvement COM-2224130Portal ↗ | Issued Feb 22, 2023 100d review | Finaled | $95,000 | EXPEDITED - EPC - Additional scope added to original permitted scope under permit COM-2115864. B Occupancy Level 14 only scope includes: new private office floor and wall finishes, suspended acoustic ceiling, and project standard lighting; open office receives new suspended acoustic ceiling Mechanical diffuser locations are adjusted for new RCP and lighting. Fire sprinkler and fire alarm coverage per original permit see attached letter in SUPP file. Filed as: SWINERTON BUILDERS |
| 630 K St City of Sacramento · APN 006-0091-036-0000 | Plan revision / deferred submittal COM-2218375Portal ↗ | Applied Aug 29, 2022 | Complete | — | EPC - Revision to COM-2200377 for outside Air feed to 1st floor Filed as: SWINERTON BUILDERS |
| 630 K St City of Sacramento · APN 006-0091-036-0000 | Plan revision / deferred submittal COM-2214847Portal ↗ | Applied Jul 13, 2022 | Complete | — | EPC - Revision to COM-2200377 for fire Smoke Damper modification Filed as: SWINERTON BUILDERS |
| 630 K St City of Sacramento · APN 006-0091-036-0000 | Plan revision / deferred submittal COM-2214846Portal ↗ | Applied Jul 13, 2022 | Complete | — | EPC - Revision to COM-2200377 for ejector pump at break room sink Filed as: SWINERTON BUILDERS |
| 630 K St City of Sacramento · APN 006-0091-036-0000 | Commercial tenant improvement COM-2200377Portal ↗ | Issued Apr 5, 2022 89d review | Finaled | $2,110,000 | EXPEDITED - EPC - Tenant improvement of the 2nd floor. Scope includes MEPF, framing and finish modifications. Filed as: SWINERTON BUILDERS |
| 1325 J St City of Sacramento · APN 006-0054-025-0000 | Commercial tenant improvement COM-2115864Portal ↗ | Issued Feb 23, 2022 217d review | Finaled | $10,104,875 | EPC - 76,420 sf multi-floor remodel of office space for existing tenant (full 8th & 16th floors + partial 1st, 13th, 14th & 15th floors) in Type-1A hi-rise. [Path of Travel upgrades for building under separate permit.\ SEE REVISION COM-2412353 - REVISED SCOPE FROM ORIGINAL PERMIT COM-2115864. SCOPE INCLUDES: MECHANICAL AND ELECTRICAL UPDATES FOR THE REPLACEMENT OF THE HEAT PUMP ON LEVEL 1 WITH A NEW UNIT IN A NEW LOCATION CLOSE TO THE EXISTING LOCATION. Filed as: SWINERTON BUILDERS |
| 1325 J St City of Sacramento · APN 006-0054-025-0000 | Commercial tenant improvement COM-2122454Portal ↗ | Issued Feb 11, 2022 116d review | Finaled | $420,000 | EPC - Path Of Travel Improvements #1 associated with tenant remodel under COM-2115864 - Restroom improvements on Floors 1, 8, 13, 14, 15 & 16 + accessible parking upgrades. No changes to sprinkler system. [POT Improvements #2 for entry and elevator access under separate submittal.] Filed as: SWINERTON BUILDERS |
| 630 K St City of Sacramento · APN 006-0091-036-0000 | Remodel / interior alteration COM-2125354Portal ↗ | Issued Jan 5, 2022 35d review | Expired Permit | $1,205,358 | EPC - Demolition of existing interior non-load bearing walls, finishes and fixtures to allow future clients to view the space as a white box. Total area of demolition is approximately 60,324 SF. Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-086-0000 | Remodel / interior alteration COM-2107721Portal ↗ | Issued Apr 16, 2021 3d review | Finaled | $12,500 | EXPEDITED - EPC - Addition of a 20 gallon water heater inside the EVS room of MOB2. Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-050-0000 | Plan revision / deferred submittal COM-2102007Portal ↗ | Applied Feb 1, 2021 | Complete | — | EPC - Revision to COM-2015834 for various changes. Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-086-0000 | Commercial tenant improvement COM-2015834Portal ↗ | Issued Dec 4, 2020 94d review | Finaled | $1,500,000 | EPC - RENOVATION OF A VACATED STORE INTO A COFFEE/REFRESH BAR AND PROVIDE A LINK TO THE COURTYARD. PROJECT INCLUDES NEW FINISHES AND ELECTRICAL, MECHANICAL AND PLUMBING UTILITIES. Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-050-0000 | Commercial tenant improvement COM-2014818Portal ↗ | Issued Sep 1, 2020 13d review | Finaled | $30,000 | EPC - Initial plans did not include Fire Alarm drawings, as new devices were not anticipated. Per JCI/Simplex, the existing system was outdated (incandescent system) and needed to be updated. Scope includes replacement of existing devices. Function of the space remains the same. Filed as: SWINERTON BUILDERS |
| 8220 Siena Ave City of Sacramento | Roof replacement COM-2006220Portal ↗ | Issued Jul 20, 2020 97d review | Finaled | $11,500 | EPC - HSG 19-032530 --- Minor Interior Alteration - Creation of a new 757 SF Tool Storage Room inside an existing warehouse. Scope includes new wall framing and gyp. bd. with no ceiling (open to underside of existing warehouse roof framing), doors and electrical outlets. No changes in use, No changes in occupancy, no changes proposed to building envelope. Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-086-0000 | Commercial tenant improvement COM-1925371Portal ↗ | Issued May 6, 2020 132d review | Finaled | $1,248,623 | EPC Submittal - Remodel of Commercial Building - THE PROJECT IS LOCATED WITHIN THE 1ST FLOOR OF SOUTH SACRAMENTO MOB BUILDING 1. THE PROPOSED SCOPE OF WORK CONSISTS OF RENOVATION OF AN EXISTING OUTPATIENT PHARMACY. PROJECT SCOPE INCLUDES: 1.REMOVING (1) EXISTING POINT-OF-SALES STATION AND ADD (3) NEW POS STATIONS TO CREAT AN L-SHAPE LAYOUT. THIS LAYOUT PROVIDES A TOTAL OF 10 STATIONS INCLUDING DROP-OFF/ PICK-UP/ CONSULT FUNCTIONS. NEW POS STATIONS WILL HAVE NEW ARCHITECTURAL CASEWORK FRONTS, EXISTING POS STATIONS WILL HAVE NEW FINISHES AS A RE-FACE. 2.NEW (2) ROLL-DOWN DOORS AT THE MAIN CORRIDOR FOR ACCESS TO THE QUEUING AREA AND (1) SWING DOOR FOR EMERGENCY EXIT. 3.NEW (1) ROLL-DOWN DOOR AT THE EXISTING FIRE RATED SEPARATION BETWEEN MOB 1 AND MOB 2. 4.NEW CEILING TILES. 5.NEW FLOORING. 6.NEW IT AND ELECTRICAL SYSTEM AT NEW POS. THIS PROJECT IS AN INTERIOR TENANT IMPROVEMENT AND NO CHANGE IN THE BUILDING FOOTPRINT OR EXTERIOR MODIFICATIONS ARE INVOLVED. Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-050-0000 | Plan revision / deferred submittal COM-2004753Portal ↗ | Applied Mar 17, 2020 | Complete | — | EPC - Revision to COM-1816562 for current construction changes due to discovered conditions, design adjustments and owner related revisions. Filed as: SWINERTON BUILDERS |
| 1330 N St City of Sacramento · APN 006-0223-021-0000 | Demolition COM-2003774Portal ↗ | Issued Mar 3, 2020 0d review | Finaled | $300,362 | Demolition of existing 3-story residential building. (Old street address was 1320 N Street, APN 006-0223-003) Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-086-0000 | Plan revision / deferred submittal SUB-1925036Portal ↗ | Applied Dec 20, 2019 | Abandoned | $1,248,623 | EPC Submittal - Remodel of Commercial Building - THE PROJECT IS LOCATED WITHIN THE 1ST FLOOR OF SOUTH SACRAMENTO MOB BUILDING 1. THE PROPOSED SCOPE OF WORK CONSISTS OF RENOVATION OF AN EXISTING OUTPATIENT PHARMACY. PROJECT SCOPE INCLUDES: 1.REMOVING (1) EXISTING POINT-OF-SALES STATION AND ADD (3) NEW POS STATIONS TO CREAT AN L-SHAPE LAYOUT. THIS LAYOUT PROVIDES A TOTAL OF 10 STATIONS INCLUDING DROP-OFF/ PICK-UP/ CONSULT FUNCTIONS. NEW POS STATIONS WILL HAVE NEW ARCHITECTURAL CASEWORK FRONTS, EXISTING POS STATIONS WILL HAVE NEW FINISHES AS A RE-FACE. 2.NEW (2) ROLL-DOWN DOORS AT THE MAIN CORRIDOR FOR ACCESS TO THE QUEUING AREA AND (1) SWING DOOR FOR EMERGENCY EXIT. 3.NEW (1) ROLL-DOWN DOOR AT THE EXISTING FIRE RATED SEPARATION BETWEEN MOB 1 AND MOB 2. 4.NEW CEILING TILES. 5.NEW FLOORING. 6.NEW IT AND ELECTRICAL SYSTEM AT NEW POS. THIS PROJECT IS AN INTERIOR TENANT IMPROVEMENT AND NO CHANGE IN THE BUILDING FOOTPRINT OR EXTERIOR MODIFICATIONS ARE INVOLVED. Filed as: SWINERTON BUILDERS |
| 6600 Bruceville Rd City of Sacramento · APN 117-0170-050-0000 | Plan revision / deferred submittal COM-1922887Portal ↗ | Applied Nov 21, 2019 | Complete | — | EPC - Revision to Issued Permit COM-1816562 to provide fire rated glazing, frames, doors, hardware and rolling door for the existing 1-hr fire rated corridor. Revise/simplify ceiling layout, lighting, power/data outlets, finishes, and casework per owner request. Revise mechanical layout due to found conditions. Remove sink per owner request. Provide revise signage to meet current facility standards. Filed as: SWINERTON BUILDERS |
| 7300 Wyndham Dr City of Sacramento · APN 117-0170-083-0000 | General repair COM-1922504Portal ↗ | Issued Nov 18, 2019 0d review | Certificate of Compliance | $50,000 | EPC - Replacement of expired permit COM-1816378 for installation of path of travel convenience walkway from public sidewalk to parking lot. No plan review needed Filed as: SWINERTON BUILDERS |
| 1415 L St City of Sacramento · APN 006-0116-013-0000 | Commercial tenant improvement COM-1903786Portal ↗ | Issued Oct 18, 2019 227d review | Certificate of Occupancy | $800,000 | EXPEDITED - EPC Submittal - Remodel of Commercial Building - Demolition and Construction of partitions and associated power/data, floor finishes, mill work, plumbing and lighting See revision COM-1919893 relocation of 15 fire sprinkler heads SEE REVISION COM-2000935: revision per inspection correction: A201.1 revised construction detail for wall type G2, added degenkolb detail, removed detailed D4 on sheet A-501, Filed as: SWINERTON BUILDERS |
| 1415 L St City of Sacramento · APN 006-0116-013-0000 | Plan revision / deferred submittal COM-1919893Portal ↗ | Applied Oct 15, 2019 | Complete | — | EXPEDITED - Relocation of 15 fire sprinkler heads Filed as: SWINERTON BUILDERS |