Retired / historical parcel number
Recorded at 15 Business Park Way; 16 Business Park Way; 6000 Midway St and 28 more · Records from 2016–2022
EV CHARGING STATION
EPC - EV charger install: : Add new 50 amp circuit and run approximately 45’ 6 AWG wire in ¾” EMT conduit with 10 AWG ground from existing subpanel to new NEMA 14 50 outlet for EV charging. Charger uses 32 Amps. Overcurrent protection device: 50 amp, 2 pole GE breaker, 10,000 AIC
HVAC C/O - Building 8
EPC - Building 8 - Like for like HVAC rooftop unit replacements. Equipment updated in place. No duct work. Reuse existing roof curb.
Install Signs - 16 Business Park Way
Install four (4) non-illuminated wall signs
remodel building 8 bay 4
EPC - convert 1100 sq ft of warehouse to new office and accessible restrooms include modification of mechanical electrical plumbing and fire sprinkler systems upgrade to path of travel and accessible parking stalls
Army Depot Park - Gas Main Replacement
EPC - Underground Utility Gas Main Replacement
ROOF OVERLAY (SUITE 352)
E-Permit: Tear Off - No, Resheet - No, 1 layer(s), 52 squares of TPO Single Ply. CRRC: 0608-0008 In-progress inspection required.
Commercial Remodel (Bldg 1, Bay 3)
EPC - Remodel consisting of: Demolition and construction of non bearing partitions, new ceiling grid and tile, relocation of existing and new lighting fixtures, HVAC grilles, new outlets and new finishes. The existing mechanical, plumbing, electrical and sprinklers are modified as needed to accommodate new layout. New heat pump. No Change in Use or Occupancy. Building 1, Bay 3
(Building 1 / Bay 1) Electrical Power / LIghting
EPC - (Building 1 / Bay 1): Electrical Power and Lighting modifications to support SMUD's storage needs.
Commercial Remodel (BLDG #3, Bay 1)
EPC - Office Remodel. Including demolition and construction of non-bearing partitions, new ceiling grid and tile. Relocation of existing and new light fixtures, HVAC grilles, new outlets and new finishes. The existing MEP and FP systems are modified as needed to accommodate new layout. BLDG #3, Bay 1.
PALLET RACK
EPC - Pallet Rack: Installation of a 12 foot tall & 16 foot tall pallet rack for storage of customer products
storage racking
EPC - Installation of 893 sq ft interior storage racks in an existing building
remodel
EPC - New electrical outlets for tenants equipment, new concrete equipment pads and relocation of existing and new light fixtures.
E-Permit: Tear Off - No, Resheet - No, 1 layer(s), 3140 squares of TPO Single Ply. CRRC: 0608-0008
remodel
EPC - demo interior non load bearing walls, new interior non load bearing walls, new lighting, new supply and returns, new fixtures and finishes.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN as recorded on the permit) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · The city publishes current status without a date, so status changes are dated by the window between our snapshots.
APN 062-0010-040-0000 · 70 permits matched by address and location
Matched by checking which current parcel holds each permit's mapped point, or carries its street address. This is our inference, not an official County lineage record.
Source: Sacramento County GIS, Parcels · Geography: current parcel polygons · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Search by parcel number 062-0010-036-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
County systems may not return results for a retired number. If so, use a current parcel listed above. Most recent record here: Feb 11, 2022.
RACKING BLDG2 BAY 1&2
EXPEDITED - EPC - Installation of storage racking 12' and 16'. Racking area of improvement: 53,189SF
fire equipment
EPC - FIRE ALARM REPLACEMENT - LIKE FOR LIKE REPLACEMENT OF FIRE ALARM SYSTEM FOR AUXILIARY BUILDING PUMP HOUSE.
Fire Equipment Installation
EPC - Fire Alarm - Replacement of failing Fire Alarm Control Unit
E-Permit: Tear Off - No, Resheet - No, 1 layer(s), 150 squares of TPO Single Ply. CRRC: 0662-0032
REVISION TO COM-2001228
EPC - REVISION TO COM-2001228: REVISED ELECTRICAL TO REFLECT ONSITE CONDITIONS.
SPRINKLERS
EPC - replaced smaller heads to bigger heads for storage
19-032530 storage room
EPC - HSG 19-032530 --- Minor Interior Alteration - Creation of a new 757 SF Tool Storage Room inside an existing warehouse. Scope includes new wall framing and gyp. bd. with no ceiling (open to underside of existing warehouse roof framing), doors and electrical outlets. No changes in use, No changes in occupancy, no changes proposed to building envelope.
Interior Remodel
EPC - EXPEDITED - Interior Remodel to private school (E occupancy) to include demolition and contruction of interior partitions, new accessible restrooms, lighting, relocate existing HVAC, provide card reader and Knox Box at (E) gate, new exterior walkway, ramp, handrail, curb and landing and 8' high exterior wrought iron fence at South, West and East sides of the building. - PLNG-INSP
racking
EPC - 23150 sq ft project area for Installation of 16 ' tall Storage racking
BLDG 1, BAY 5***CRANE/RUNWAYS
EPC Submittal - NORTHBAY - INSTALL A 6 TON BRIDGE CRANE RUNWAY WITH TWO 3 TON CRANES CENTER BAY - INSTALL A 10 TON BRIDGE CRANE RUNWAY WITH TWO 5 TON CRANES SOUTH BAY - INSTALL A 6 TON BRIDGE CRANE RUNWAY WITH ONE 3 TON CRANES
Electrical - Depot Park - 8304 Ferguson Ave
EPC - EXPEDITED(10,5,5,5) - Units 8304/8314 Ferguson Ave. 1) Furnish and install 1250/1500 kva, 12.475 kv x 480 substation. 2) Furnish and install panels and feeders to suites 5 and 6. 3) Provide power to (95) 30-amp 480 volt welding outlets. 4) Repower existing roof top mounted exhaust fans. 5) Provide power for parts washer and air compressor. 6) Provide power to (3) bridge cranes. SEE REVISION COM-2014080: REVISED ELECTRICAL TO REFLECT ONSITE CONDITIONS.
BLDG 1***CRANE SYSTEM
BLDG 1***EPC -CENTER BAY: INSTALL A 3 TON BRIDGE CRANE RUNWAY WITH TWO 3 TON CRANES NORTH BAY : INSTALL A 1 TON BRIDGE CRANE RUNWAY **See COM-2001228 For Medium Voltage Substation and Distribution Upgrade.
storage racking temple coffee
EPC - 2345 sq ft Install 66 Bays of Pallet Rack 192"T X 48"D X 96"/144"w
Temple Coffee
EPC Submittal - Remodel of Commercial Building - Interior remodel of existing industrial warehouse space into conditioned food processing/storage facility
Interior Demolition
EXPEDITED - Partial Interior Demolition of non-structural partition walls and finishes for future remodel on separate permit
KONECRANES/SIEMENS LIGHT RAIL - Crane & Runways
EPC Submittal - North Bay - Installation of a 6 ton bridge crane runway with two 3 ton cranes. Center Bay - Installation of a 10 ton bridge crane runway with two 5 ton cranes. South Bay - Installation of a 6 ton bridge crane runway with one 3 ton crane.
EPC Submittal - Addition to Commercial Building - Install 3 Bridge Crane Runways and 5 Bridge Cranes
RACKING
Racking System. State Fire Marshall Jurisdiction
EPC Submittal - Remodel of Commercial Building - Interior remodel of existing industrial warehouse space into conditioned storage facility
HSG 19-032530 FIRE SPRINKLER
HSG 19-032530: EPC Submittal - Remodel of Commercial Building - Tie into existing overhead main, to feed new pendent fire sprinklers in six (6) existing conex boxes
PEARCE SERVICES - STORAGE RACKS
EPC Submittal - Install interior storage racking in a existing warehouse.
storage racking
EXPEDITED 10,5,5- 21,404 sq ft space installation of 20ft high storage racking, electrical, bollards and finishes.
HSG 19-032530 FIRE SPRINKLER
HSG 19-032530: EPC Submittal - Remodel of Commercial Building - Tie into existing overhead main, to feed new pendent fire sprinklers in six (6) existing conex boxes
EPC Submittal - Remodel of Commercial Building - Tie into existing overhead main, to feed new pendent fire sprinklers in six (6) existing conex boxes
welding station
EXPEDITED - installing welding station, vent boss model S316 series 300
EPC Submittal - Addition to Commercial Building - install interior storage racking in a existing warehouse
Boiler Replacement- suite 150
Commercial replacement of existing boiler
welding station
installing welding station, vent boss model S316 series 300
FIRE ALARM
Add 1 notification device to existing fire alarm panel in new office.
Remodel
Remodel to existing warehouse space, to include new offices and accessible upgrades to parking lot and bathroom, mechanical and electrical.
8301 Demetre Ave Patch Repair
EXPEDITED - Building 7, Bay 6 Patch roof and concrete from removal of paint booths and vents from Demo permit COM-1907733
Army Depot Food Packaging
EXPEDITED - EPC - (10-5-5) Addition to and remodel of existing warehouse for use as a food packaging/distribution facility. Area of work is 44,059 SF, addition is 1,600 SF under the canopy of the north loading dock. Type IIB; Occ. S-1; scope includes new walk-in cooler and freezer. Exterior scope shall include new standby/non-emergency generator, accessible ramp, new HVAC and condensing units on the roof. DEFERRED: Fire sprinklers/alarm.
EPC Submittal - Addition to Commercial Building - An interior renovation of an existing warehouse with a small addition being added to the north building elevation at the existing loading dock.
8301 Demetre Ave Interior Demo
EXPEDITED - Building 7, Bay 6 Demolition of 2 paint booths and storage room.
Remodel
Remodel to existing warehouse space, to include new offices and accessible upgrades to parking lot and bathroom, mechanical and electrical.
Interior Remodel suite 101
EXPEDITED - SUITE 101. Minor interior alterations to include building out new offices (989sq. ft.), removal of partial height partitions and installation of new systems furniture and open office reconfiguration of 6,104sq. ft.. No changes proposed to the building envelope.
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 3134 squares of TPO Single Ply. CRRC: 0674-0030
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 300 squares of TPO Single Ply. CRRC: 0674-0030
Ferguson Sign Permit
install 1 attached non illuminated sign 40sq ft
E-Permit: Tear Off - No, Resheet - No, 1 layer(s), 60 squares of PVC Single Ply. CRRC: 0674-0003
Depot Park
EXPEDITED 15,10,10 - EPC Submittal - Building 150 - This project is for an office use tenant improvement on the second floor. Scope will include new construction for offices, open office with work stations, break room, and conference room including mechanical distribution, plumbing and electrical work.
US NATIONAL LEASING LLC, INSTALL SPRAY BOOTH
INSTALL A (14X12X35) 490sf SPRAY BOOTH with fire suppression
Depot Park
EXPEDITED 10,5,5 - EPC - Building 150, Modification to an existing building to remodel existing second floor restrooms, including plumbing, mechanical and electrical. Also adding a new one hour corridor on the 2nd floor. Site accessibility upgrades on a separate permit.
lowering gas line pressure
EXPEDITED - lowering gas line pressure and disconnecting hvac units per plan
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 506 squares of TPO Single Ply. CRRC: 0674-0002
Depot Park
EPC Submittal - Remodel of Commercial Building - This project is for an office use tenant improvement on the second floor. Scope will include new construction for offices, open office with work stations, break room, and conference room including mechanical distribution, plumbing and electrical work.
pallet racking
installation of storage racks 12' in height and shelving 8' in height and 6' in height, inside existing warehouse
Depot Park
EPC Submittal - Remodel of Commercial Building - Modifications to an existing building to remodel existing second floor restrooms, including plumbing, mechanical and electrical. Also adding a new 1 hour rated corridor on the 2nd floor. Site accessibility upgrades on separate permit.
HIGH PILE RACKING
EPC - Installation of a high pile storage rack system in leased space for the City's Parks and Recreation at Depot Park
HVAC
Install a new HVAC system.
RACKING
Racking System. State Fire Marshall Jurisdiction
Building 150
EXPEDITED - Building 150, Accessible access upgrade from the street to the building, add 4 accessible parking stalls, add a wheel chair lift
RACKING
Racking System. State Fire Marshall Jurisdiction
Depot Park
Building 2 Bay 4, concrete truck dock ramp 1520 sq. ft.
Racking
Install racking at existing warehouse
Fire Alarm
Replace existing fire alarm panel with new and adding one horn strobe and one pull station.
FERGUSUSON HVAC SIGN PERMIT-FERGUSON AVE
Install (1) Attached / Non-Illuminated 4'-0" x 14'-0" wall Sign.
Revision
EXPEDITED - Revision to Com-1511961. Remove 1 water closet from women's restroom