Sacramento 95815 · Swanston Estates · APN 277-0160-080-0000 · City of Sacramento
Zoned C-2 in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $395,000 ($348,000–$442,000).
Public building records show issued construction/renovation work on this parcel (40 total permits, latest Aug 12, 2024).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Sign (SIG-2405037): Issued after 4 mo (5.7× the 19d median) — slower than 90% of sign permits in City of Sacramento (median 19d, 90th pct 76d, n=1,075).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$395,000
Benchmark range: $348,000 – $442,000
Closest lead: 17th & S Street Mixed Use (0.31 mi NE, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$413/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 1 homes completed, 1 permitted.
2 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
236 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-2 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 9.2 yr (since Aug 14, 2017), with no new permit record in 9.2 yr. · $21,439,420 declared valuation
In "Entitled" for 5.3 yr (since Aug 3, 2021), with no new permit record in 5.3 yr. · 47 units
In "Fee estimate" for 5 yr (since Oct 29, 2021), with no new permit record in 5 yr. · 300 units · $75,000,000 declared valuation
Nearby electrical / panel (1535 River Park Dr): First appeared in published agency feed
Record COM-2623856 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (1689 Arden Way 2012): Status changed from Issued to Finaled
Record SIG-2609070 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1545 River Park Dr 500): Status changed from Plan Check Target to Complete
Record FPP-2621382 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1601 Arden Way): First appeared in published agency feed
Record COM-2621862 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): Status changed from Plan Check Target to Plan Check Wait
Record COM-2621057 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): Description text was updated
Record COM-2621057 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby windows / doors / siding (1235 Fee Dr): First appeared in published agency feed
Record COM-2621537 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): First appeared in published agency feed
Record COM-2622389 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (1625 Bowling Green Dr): First appeared in published agency feed
Record RES-2623275 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (1701 Arden Way): Status changed from Issued to Expired Permit
Record COM-2519828 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1601 Arden Way): Status changed from Verify to Complete
Record COM-2619316 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (2247 Royale Rd): First appeared in published agency feed
Record COM-2621794 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (2150 Harvard St): Status changed from Plan Check Target to Plan Check Wait
Record COM-2620426 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (1689 Arden Way 1034): First appeared in published agency feed
Record SIG-2621787 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (1689 Arden Way): First appeared in published agency feed
Record COM-2622687 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Entitled" for 5.3 yr (since Aug 3, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (47 housing units across 0 permits).
In "Fee estimate" for 5 yr (since Oct 29, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (300 housing units, $75,000,000 declared valuation across 1 permit).
In "Fee estimate" for 9.2 yr (since Aug 14, 2017), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($21,439,420 declared valuation across 3 permits).
Issued after 4 mo (5.7× the 19d median) — slower than 90% of sign permits in City of Sacramento (median 19d, 90th pct 76d, n=1,075).
Issued after 5 mo (33.4× the 5d median) — slower than 90% of pool / spa permits in City of Sacramento (median 5d, 90th pct 49d, n=1,059).
High-impact scale (5 housing units, $1,895,360 declared valuation across 38 permits).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 830 parcels
Small prior baseline
City baseline: 30.4 / 1k
8 in trailing 24m
Includes 1 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Brown Construction | New multifamily / condos / mixed-use | 12 on parcel26 in ½ mi | $142,773,797 | 4 vs 27 prior−85% |
| Eagle Pools | Pool / spa | 1 on parcel2 in ½ mi | $532,057 | 1 vs 4 prior |
| Sr Bray | Electrical / panel | 1 on parcel1 in ½ mi | $10,000 |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-useOn this parcel | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
HUD Small Area Fair Market Rent · ZIP 95815
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($3,950/yr) + local voter-approved bond debt ($553/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$13,718/yr
Cash needed: $86,900
NOI: $10,250/yr
P&I: $1,997/mo
For $0/mo net cash flow
At $1,850/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,702/mo | −$1,356/mo | -18.7% | $3,594/mo | −$1,329/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,850/mo | −$1,143/mo | -15.8% | $3,327/mo | −$1,012/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $1,961/mo | −$1,021/mo | -14.1% | $3,250/mo | −$770/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Finaled / completed5 unitsJun 21, 2022 – Feb 3, 2023
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
Electrical Revision - Arden Gateway 2 - BLDG E
EPC - Revision to COM-2213631. Updated One-line Diagram & Panel Schedule for Building E (1566 Bartlett Ln)
1542 BARTLETT LANE
INSTALLING A DOUBLE SIDED MONUMENT SIGN AT THE ENTRANCE OF THE PROPERTY. INSTALLING AN ILLUMINATED BUILDING WALL SIGN ABOVE ENTRANCE.
1542 Bartlett Lane
(3) 48 Sq Ft. Vinyl Banners, Installed On Building Fascia
Site Amenity Changes - Arden Gateway 2
EPC - Revision to COM-2213060 with amenity layout changes and changes to the landscape and civil plans.
Electrical Revision - Arden Gateway 2 Apartments
EPC - Revision to COM-2213627 to revised one-line diagrams for all apartment buildings (Change of the elevator breaker from 200 amps to 100 amps)
Arden Gateway II - Building B Trusses
EPC - Deferred Submittal to COM-2213628 for Building B Roof Truss Shop Drawings.
Arden Gateway 2 - Deferred BLDG C Trusses
EPC - DEFERRED TO COM-2213629 (SHARED PLANS UNDER COM-2213627) Building C Roof Truss Shop Drawings.
Arden Gateway 2, Bldg D Truss
EPC - Deferred Submittal to COM-2213630 for Building D roof truss shop drawings [Shared PLANS for Buildings A, B, C, D, E, F, G & H under COM-2213627]
Arden Gateway 2 - Pool
EPC - New inground Gunite pool and spa. Equipment room and utilities are not part of this permit. - PLNG-INSP
Arden Gateway 2- Bldg E Roof Truss
EPC - Deferred Submittal for (COM-2213631) building E Roof truss shop drawings.
Arden Gateway II, Structural Revisions
EPC - Revisions to COM-2213627 (Bldg A) & COM-2213631 (Bldg E) to roof plans. The revision is based on the plan review comments to the truss deferred submittal.
Arden Gateway II - Building A Trusses
EPC - Deferred Submittal to COM-2213627 for Building A Roof Truss Shop Drawings
Arden Gateway 2 - Building E Garage Revision
EPC - Revision to COM-2213631 to modify garage "E22" into a storage area. Roof plans modified to show extended mechanical pad.
Arden Gateway 2 - Added Electrical to BLDG D
EPC - Added scope of work to COM-2213630 for adding additional house meters.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
| Report year | Project / record | Type | Entitled | Permitted | Completed | Deed-restricted |
|---|---|---|---|---|---|---|
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG A(COM-2213627) | 5+ · Renter | — | 55 (Feb 3, 2023) | 55 (Jul 3, 2024) | — |
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG B(COM-2213628) | 5+ · Renter | — | 65 (Jan 23, 2023) | 65 (Nov 22, 2024) | — |
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG C(COM-2213629) | 5+ · Renter | — | 88 (Jan 23, 2023) | 88 (Oct 31, 2024) | — |
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG D(COM-2213630) | 5+ · Renter | — | 54 (Jan 23, 2023) | 54 (Sep 13, 2024) | — |
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG E(COM-2213631) | 5+ · Renter | — | 58 (Jan 23, 2023) | 58 (Sep 4, 2024) | — |
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG F(COM-2213632) | 5+ · Renter | — | 3 (Jan 23, 2023) | 3 (Jun 25, 2024) | — |
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG G (AKA G1)(COM-2213633) | 5+ · Renter | — | 3 (Jan 23, 2023) | 3 (Jun 25, 2024) | — |
| 2024 | SHARED PLANS: Arden Gateway 2 - BLDG H (AKA G2)(COM-2213634) | 5+ · Renter | — | 5 (Jan 23, 2023) | 5 (Jun 12, 2024) | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG A(COM-2213627) | 5+ · Renter | — | 55 (Feb 3, 2023) | — | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG B(COM-2213628) | 5+ · Renter | — | 65 (Jan 23, 2023) | — | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG C(COM-2213629) | 5+ · Renter | — | 88 (Jan 23, 2023) | — | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG D(COM-2213630) | 5+ · Renter | — | 54 (Jan 23, 2023) | — | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG E(COM-2213631) | 5+ · Renter | — | 58 (Jan 23, 2023) | — | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG F(COM-2213632) | 2 to 4 · Renter | — | 3 (Jan 23, 2023) | — | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG G (AKA G1)(COM-2213633) | 2 to 4 · Renter | — | 3 (Jan 23, 2023) | — | — |
| 2023 | SHARED PLANS: Arden Gateway 2 - BLDG H (AKA G2)(COM-2213634) | 5+ · Renter | — | 5 (Jan 23, 2023) | — | — |
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
10.49 acres
Assessor's classification for assessment purposes. This is not zoning.
1542 BARTLETT LN; 1548 BARTLETT LN; 1548 BARTLETT LN APT 21101 APT 21101
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 277-0160-080-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| 0 vs 0 prior |
| Carver And Windsor | Sign | 1 on parcel1 in ½ mi | $1,808 | 0 vs 0 prior |
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS, INC · ICON GENERAL CONTRACTORS LLC Recent nearby: 2201 Harvard St (Sep 8, 2026) | Commercial tenant improvement | 44 in ½ mi | $5,214,120 | 39 vs 62 prior−37% |
| Phoenix Builders Recent nearby: 1689 Arden Way (Oct 9, 2026) | Commercial tenant improvement | 41 in ½ mi | $2,438,200 | 11 vs 8 prior+38% |
| Descor Recent nearby: 1508 El Camino Ave (May 25, 2018) | Commercial tenant improvement | 11 in ½ mi | $2,924,106 | 8 vs 12 prior−33% |
| Dekreek Construction Recent nearby: 1525 Response Rd 150 (Dec 14, 2023) | Commercial tenant improvement | 9 in ½ mi | $2,065,345 | 6 vs 9 prior−33% |
| Horizon Retail Construction Recent nearby: 1689 Arden Way (Jul 29, 2021) | Commercial tenant improvement | 8 in ½ mi | $1,885,000 | 1 vs 1 prior |
| Carlisle Construction Recent nearby: 2180 Harvard St (Jun 6, 2022) | Commercial tenant improvement | 7 in ½ mi | $971,112 | 2 vs 6 prior |
| Accessory dwelling unit (new or conversion) | 1,693 | 57d | 97d | 172d | 284d | 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alteration | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Pool / spaOn this parcel | 1,059 | 1d | 5d | 25d | 49d | 4d(vs 7d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
Arden Gateway 2 - Deferred Mechanical for Clubhouse
EPC - Deferred Submittal to COM-2213060 for Mechanical Unit Anchorage Design and Support
Arden Gateway II - Building H Trusses
EPC - Deferred Submittal to COM-2213634 for Building H Floor & Roof Truss.
Siding Change - Arden Gateway II
EPC - Revision to COM-2213060 for a material change from building siding to James Hardie Shiplap Siding at the clubhouse.
Siding Change - Arden Gateway II
EPC - Revision to COM-2213627 for a material change from building siding to James Hardie Shiplap Siding at apartment buildings
Beam Change - Arden Gateway Phase II
EPC - Revision to COM-2213632 (Bldg F), COM-2213633 (Bldg G), and COM-2213634 (Bldg H), to shift beam location to allow for a top landing step.
Truss -Bldg G- Arden Gateway II
EPC - Deferred Submittal to COM-2213633, for Building G Roof & Floor Truss Shop Drawings.
Arden Gateway 2 - Clubhouse Revision
EPC - Revision to COM-2213060 to add a glass door at the leasing office to close it off from the rest of the clubhouse.
Shear Wall Revision - Arden Gateway Phase 2
EPC - Shear wall changes to Buildings F, G, & H. Revisions to COM-2213632, COM-2213633, and COM-2213634.
Fire Sprinkler Plans Arden Gateway II
EPC - Apartment Fire Sprinkler Plans Arden Gateway Phase II. The five (5) 4-story buildings (A-E) NFPA 13 & standpipe system. COM-2213627, COM-2213628, COM-2213629, COM-2213630, and COM-2213631. The three (3) 3-story townhome buildings (F-H) have an NFPA 13R system. COM-2213632, COM-2213633, COM-2213634
Fire Alarm - Arden Gateway Deferred Submittal
EPC - Low voltage fire alarm system Deferred Submittal to COM-2213627 for Arden Gateway Phase II Apartments
SHARED PLANS: Arden Gateway 2 - BLDG A
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG A, 4-story, 55 units, 20 garages, Total of 69,683 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Values for PIF Only: 8 units are under 750 SF and 47 units are between 750-2000 SF (47,856 sf)
Change to Switchgear
EPC - Alternate Switchgear proposed for the new clubhouse building approved under COM-2213060
Sprinklers, Arden Gateway 2 - Clubhouse
EPC - Deferred submittal for sprinkler system (NFPA 13) for Clubhouse approved under COM-2213060
SHARED PLANS: Arden Gateway 2 - BLDG H (AKA G2)
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG H (aka G2), 3-story, 5 units, 5 garages, Total of 11,846 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Areas for PIF Only: 5 units are between 750-2000 SF (8729 sf)
SHARED PLANS: Arden Gateway 2 - BLDG G (AKA G1)
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG G (aka G1), 3-story, 3 units, 3 garages, Total of 7,126 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Areas for PIF Only: 3 units are between 750-2000 SF (4697 sf)
SHARED PLANS: Arden Gateway 2 - BLDG F
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG F, 3-story, 3 units, 3 garages, Total of 7,126 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Areas for PIF Only: 3 units are between 750-2000 SF (4903 sf)
SHARED PLANS: Arden Gateway 2 - BLDG E
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG E, 4-story, 58 units, 22 garage, Total of 68,986 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Areas for PIF Only: 22 units are under 750 SF and 36 units are between 750-2000 SF (37,965 sf)
SHARED PLANS: Arden Gateway 2 - BLDG D
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG D, 4-story, 54 units, 24 garages, Total of 62,812 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Areas for PIF Only: 36 units are under 750 SF and 18 units are between 750-2000 SF (20,970 sf)
SHARED PLANS: Arden Gateway 2 - BLDG C
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG C, 4-story, 88 units, 32 garages, Total of 102,356 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Areas for PIF Only: 40 units are under 750 SF and 48 units are between 750-2000 SF (49,768 sf)
SHARED PLANS: Arden Gateway 2 - BLDG B
EPC - MULTI-FAMILY HOUSING - Construction of an apartment complex with 331 market rate units in 8 different buildings. Type VB, R2 Occupancy. Club house and all site work are under COM-2213060. This permit is for BLDG B, 4-story, 65 units, 28 garages, Total of 78,480 SF. - PLNG-INSP Shared plans reviewed under COM-2213627 Areas for PIF Only: 12 units are under 750 SF and 53 units are between 750-2000 SF (51,954 sf)
Arden Gateway 2 - Temp Power
EPC - Install 200amp temp power meter for construction power with three (3) 100 Amp load centers adjacent to Buildings B, C, and D.
Arden Gateway 2 - Building F Deferred Trusses
EPC - Deferred Submittal for COM-2213632 Building F (1560 Bartlett Ln) Roof & Floor Truss Shop Drawings. Original plan reviewed under COM-2213627.
Arden Gateway 2 - Clubhouse Truss
EPC - Truss Deferred Submittal for Clubhouse, Clubhouse permit under COM-2213060
Arden Gateway 2 - Clubhouse & Site
MULTI-FAMILY HOUSING - EPC - Construction of a 1-story, 8,210 SF clubhouse / community building and all site work for an apartment complex. Type VB, A3 & B occupancies. (Apartment buildings are under separate permits with a separated plan review set) - PLNG-INSP
Arden Gateway 2 - Deferred Fire Line Materials
EPC - Deferred to COM-2213060 & COM-2220209 for Underground Fire Plan materials
Arden Gateway 2 - Phased Permit for Clubhouse & Site
EPC - Phased Permit to COM-2213060 for on-site improvement