Sacramento 95825 · Campus Commons · APN 295-0020-014-0000 · City of Sacramento
Zoned C-2-R-PUD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $535,000 ($471,000–$599,000).
Public building records show issued construction/renovation work on this parcel (54 total permits, latest Apr 23, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
48 substantial renovation & housing permits over 24 months (35.7 per 1,000 parcels vs. 30.4 citywide baseline) (#69 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Campus Commons)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$535,000
Benchmark range: $471,000 – $599,000
Remodel / interior alteration (COM-2511399): Issued after 3 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Closest lead: 5-Story Apartment (0.31 mi E, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$546/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 11 homes completed, 9 permitted, 1 proposed or in review; 1 demolition.
22 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
377 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-2 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 8.8 yr (since Jan 9, 2018), with no new permit record in 8.8 yr. · $1,800,000 declared valuation
In "Entitled" for 5.6 yr (since Apr 9, 2021), with no new permit record in 5.6 yr. · 1 unit
In "Entitled" for 4.9 yr (since Dec 29, 2021), with no new permit record in 4.9 yr. · 1 unit
In "Fee estimate" for 4.1 yr (since Oct 3, 2022), with no new permit record in 4.1 yr. · 115 units · $9,732,800 declared valuation
In "Entitled" for 3 yr (since Nov 6, 2023), with no new permit record in 17 mo. · 1 unit · $356,600 declared valuation
Nearby general repair (100 Cadillac Dr 125): First appeared in published agency feed
Record COM-2622078 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (5816 Callister Ave): Status changed from Issued to Finaled
Record RES-2619181 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby new single-family home (703 Commons Dr): First appeared in published agency feed
Record RES-2623449 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby general repair (100 Cadillac Dr 73): Status changed from Plan Check Wait to Expired Application
Record COM-2526087 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby ev charger (2309 American River Dr A): Status changed from Plan Check Wait to Processing
Record COM-2618614 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (5723 State Ave): Status changed from Issued to Finaled
Record RES-2609710 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (5816 Callister Ave): Status changed from Issued to Finaled
Record RES-2619179 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby new single-family home (701 Commons Dr): First appeared in published agency feed
Record RES-2623445 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (841 Commons Dr): Status changed from Issued to Finaled
Record RES-2617287 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (424 Howe Ave): Status changed from Verify Wait to Issued
Record COM-2520818 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (424 Howe Ave): Issued date changed from (blank) to 2026-10-06
Record COM-2520818 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (424 Howe Ave): Contractor changed from (blank) to T E C PROJECT BUILDERS INC
Record COM-2520818 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby windows / doors / siding (457 Hartnell Pl): Status changed from Issued to Finaled
Record RES-2614424 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby new single-family home (707 Commons Dr): First appeared in published agency feed
Record RES-2623432 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (5707 Spilman Ave): First appeared in published agency feed
Record RES-2621763 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Fee estimate" for 4.1 yr (since Oct 3, 2022), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (115 housing units, $9,732,800 declared valuation across 4 permits).
In "Fee estimate" for 8.8 yr (since Jan 9, 2018), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($1,800,000 declared valuation across 6 permits).
Issued after 3 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
Issued after 2 mo (3.2× the 19d median) — above the 75th percentile for sign permits in City of Sacramento (median 19d, 75th pct 42d, n=1,075).
Issued after 6 mo (2.8× the 63d median) — above the 75th percentile for commercial tenant improvement permits in City of Sacramento (median 63d, 75th pct 119d, n=2,366).
Issued after 6 mo (2.8× the 63d median) — above the 75th percentile for commercial tenant improvement permits in City of Sacramento (median 63d, 75th pct 119d, n=2,366).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 1,344 parcels
−45.2% YoY
City baseline: 30.4 / 1k
48 in trailing 24m
Includes 0 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| D 7 Roofing Services | Roof replacement | 11 on parcel11 in ½ mi | $313,720 | 0 vs 0 prior |
| Modern Construction Group | Commercial tenant improvement | 10 on parcel10 in ½ mi | $3,443,400 | 0 vs 11 prior−100% |
| David G Griffiths | Commercial tenant improvement | 9 on parcel9 in ½ mi |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95825
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($5,350/yr) + local voter-approved bond debt ($749/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$20,094/yr
Cash needed: $117,700
NOI: $12,369/yr
P&I: $2,705/mo
For $0/mo net cash flow
At $2,250/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $2,070/mo | −$1,933/mo | -19.7% | $4,768/mo | −$1,901/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,250/mo | −$1,675/mo | -17.1% | $4,413/mo | −$1,515/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,385/mo | −$1,526/mo | -15.6% | $4,311/mo | −$1,221/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Expired / withdrawnApr 18, 2024 – Apr 18, 2024
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
61 CADILLAC DR #8 - HVAC C/O
REMOVE AND REPLACE LIKE FOR LIKE HP HVAC SYSTEM, ROOF MOUNTED. NO DUCT WORK PERMITTED. ROOF TOP INSTALLATIONS WILL BE LOCATED ON THE BACK ROOF SLOPES AND BELOW THE RIDGE LINES, AND NOT VISIBLE FROM THE STREET. THE EXISTING UNIT SHALL BE REMOVED. THE NEW UNIT SHALL BE PLACED IN THE SAME LOCATION AS THE EXISTING UNIT. CF-1R-ALT-HVAC ON FILE. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314. ALL WORK IS SUBJECT TO FIELD INSPECTION.
29 CADILLAC DR - WATER HEATER
Replace existing 120 gallon electric water heater with new 120 gallon electric water heater and install necessary code upgrades (CPC 2025) Water heater is located in the storage closet on the back side of the laundry room next to building #29 (location has no address but attached is a vicinity map.) Like for Like. Carbon monoxide & Smoke alarms are required. Reference CRC sections R315 & R314. All work is subject to field inspection.
Reserve at Cadillac- Revised Civil
EPC - Revision to (COM-2511399) update and add the water line upgrade for the apartment.
Landscape Renovation
MULTI-FAMILY HOUSING - EPC - Landscape Renovation: Including New Parking Lot Lights, Limited Drainage Improvements, New Pathway Lights, Site Furnishings, New Irrigation System, New Planting
Interior Remodel - Bldg 53 (SHARED PLANS)
EPC - SHARED PLANS X3 - Plans for existing two-story multi-family property. Remodel of Apts. 21, 22, 23, & 24 (two unit types)] consisting of removal of wet bar and shelving, relocating water heater and adding stackable washer/dryer. Shared plans reviewed under COM-2502087
Interior Remodel - Bldg 45 (SHARED PLANS)
EPC - SHARED PLANS X3 - Plans for existing two-story multi-family property. Remodel of Apts. 33 & 34 (two unit types)] consisting of removal of wet bar and shelving, relocating water heater and adding stackable washer/dryer. Shared plans reviewed under COM-2502087
Interior Remodel - Bldg 37 (SHARED PLANS)
EPC - SHARED PLANS X3 - Plans for existing two-story multi-family property. Remodel of Apts. 55 & 56 (two unit types)] consisting of removal of wet bar and shelving, relocating water heater and adding stackable washer/dryer. Shared plans reviewed under COM-2502087
61 CADILLAC DR
New signage at The Reserve Apartments to replace old signage.
Change-out installation of Electric - 040 gallon to Electric - 040 gallon, located inside building, screening not required.
Change-out installation of Electric - 040 gallon to Electric - 040 gallon, located inside building, screening not required.
Change-out installation of Electric - 030 gallon to Electric - 030 gallon, located inside building, screening not required.
Change-out installation of Electric - 040 gallon to Electric - 040 gallon, located inside building, screening not required.
Change-out installation of Electric - 040 gallon to Electric - 040 gallon, located inside building, screening not required.
Change-out installation of Electric - 040 gallon to Electric - 040 gallon, located inside building, screening not required.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
3.96 acres
Assessor's classification for assessment purposes. This is not zoning.
29 CADILLAC DR; 29 CADILLAC DR # 57 # 57; 29 CADILLAC DR # 58 # 58
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 295-0020-014-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| $30,000 |
| 0 vs 9 prior−100% |
| Graves 7 | Plumbing / water heater / sewer | 8 on parcel8 in ½ mi | $25,680 | 0 vs 0 prior |
| Asc Construction Services | Commercial tenant improvement | 3 on parcel3 in ½ mi | $112,000 | 7 vs 6 prior |
| Lawton Construction And Restoration | Remodel / interior alteration | 2 on parcel2 in ½ mi | $229,000 | 4 vs 0 prior |
| Blvd Residential | Plumbing / water heater / sewer | 2 on parcel2 in ½ mi | $25,000 | 0 vs 0 prior |
| Heim Boys Heating And Air Merged: HEIM BOYS HEATING AND AIR · HEIM BOYS HEATING AND AIR INC | Roof replacement | 2 on parcel2 in ½ mi | $14,000 | 0 vs 0 prior |
| Natco Pregra | Other | 1 on parcel1 in ½ mi | $43,000 | 0 vs 0 prior |
| Browns Heating And Air | Plumbing / water heater / sewer | 1 on parcel1 in ½ mi | $2,395 | 0 vs 0 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| DemolitionOn this parcel | 705 | 0d | 1d | 7d | 35d | 2d |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
Reserve at Cadillac- Steel Support- Building 61
EPC - This project is for addition of stair stringer support. This is for building 61. This record is for inspection purposes and all fees have been charged under COM-2405488. Shared plans under COM-2405488.
Reserve at Cadillac- Steel Support- Building 57
EPC - This project is for addition of stair stringer support. This is for building 57. This record is for inspection purposes and all fees have been charged under COM-2405488. Shared plans under COM-2405488.
Reserve at Cadillac- Steel Support- Building 49
EPC - This project is for addition of stair stringer support. This is for building 49. This record is for inspection purposes and all fees have been charged under COM-2405488. Shared plans under COM-2405488.
Reserve at Cadillac- Steel Support- Building 45
EPC - This project is for addition of stair stringer support. This is for building 45. This record is for inspection purposes and all fees have been charged under COM-2405488. Shared plans under COM-2405488.
Reserve at Cadillac- Steel Support- Building 41
EPC - This project is for addition of stair stringer support. This is for building 41. This record is for inspection purposes and all fees have been charged under COM-2405488. Shared plans under COM-2405488.
Reserve at Cadillac- Steel Support- Building 37
EPC - This project is for addition of stair stringer support. This is for building 37. This record is for inspection purposes and all fees have been charged under COM-2405488. Shared plans under COM-2405488.
Reserve at Cadillac- Steel Support- Building 29
EPC - This project is for addition of stair stringer support. This is for building 29. This record is for inspection purposes and all fees have been charged under COM-2405488.
Reserve at Cadillac- Steel Support- Building 53
EPC - This project is for addition of stair stringer support. This is for building 53. All plan review fees were charged under COM-2405488. Shared plans under COM-2405488.
Reserve at Cadillac- Landscape and Pavement
EPC - Size- 36,982 SF. Replace existing landscaping and spray irrigation throughout site with water efficient plant and drip line. Demolish and repave 2200 sf of existing pedestrian path pavement on-site. Demolish and replace 36 on-site pole lights with new LED fixtures.
Reserve at Cadillac- Steel Support- Building 41
EPC - This project is for addition of stair stringer support. This is for building 41. Shared plans under COM-2405488.
Reserve at Cadillac. Building 61 (Type C)
EPC - SHARED PLANS- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. SHARED PLANS UNDER- COM-2313930
Reserve at Cadillac. Building 29 (Type C
EPC - SHARED PLANS- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. SHARED PLANS UNDER- COM-2313930
Reserve at Cadillac. Building 57 (Type B)
EPC - SHARED PLANS- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. SHARED PLANS UNDER- COM-2313930
Reserve at Cadillac. Building 53 (Type B)
EPC - SHARED PLANS- Size- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. SHARED PLANS UNDER- COM-2313930
Reserve at Cadillac. Building 49 (Type B)
EPC - SHARED PLANS- Size- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. SHARED PLANS UNDER- COM-2313930
Reserve at Cadillac. Building 45 (Type B)
EPC - SHARED PLANS- Size- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. SHARED PLANS UNDER COM-2313930.
Reserve at Cadillac. Laundry Building
EPC - SHARED PLANS- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. THIS PERMIT IS FOR THE LAUNDRY BLDG SHARED PLANS UNDER- COM-2313930
Reserve at Cadillac. GYM
EPC - SHARED PLANS- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. THIS PERMIT IS FOR THE GYM. SHARED PLANS UNDER- COM-2313930
Reserve at Cadillac- Building 41 (Type A)
EPC - SHARED PLANS- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. THIS PERMIT IS FOR BLDG 41 (TYPE A) SHARED PLANS UNDER COM-2313930
Reserve at Cadillac. Building 37 (Type A)
EPC - SHARED PLANS- Balcony and patio replacement with exterior renovation to existing multi-family buildings and gym and laundry buildings. Upper balconies and lower patio walls to be replaced. New doors to be replaced at gym and laundry rooms. Each building has 8 units. THIS PERMIT IS FOR BLDG 37 (TYPE A) SHARED PLANS UNDER- COM-2313930
Change-out installation of Electric - 052 gallon to Electric - 052 gallon, located inside building, screening not required.
No Duct Work Permitted. Change-out Condenser/Coil Only (Split System) to Condenser/Coil Only (Split System). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890-0026 it will be the laundry and gym in front of building 37.
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890-0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890-0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890.0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890-0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890-0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890-0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 30 squares of Composite Class A. CRRC: 0890-0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 6 squares of Composite Class A. CRRC: 0890-0026
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 6 squares of Composite Class A. CRRC: 0890-0026
fencing
EPC - Removal of existing 6-foot metal fence, installation of new 6-foot metal fence - PLNG-INSP
E-Permit: Tear Off - Yes, Resheet - No, 2 layer(s), 254 squares of Composite Class A. CRRC: 0890-0026
Exterior Renovation To An Existing Multi-Family Buildings
Shared Plans- Size- 172,498 SF, Construction type- V-B. Occupancy- R-2, U. Exterior renovation to 8 existing multi-family buildings, gym and laundry buildings. The upper balconies and lower patio walls will be replaced.
HC # 22-012961 RESERVE AT CADILLAC - MAILBOX TRELLIS
EPC HC # 22-012961 - Construct new 128 sq ft trellis over existing mailboxes. New footings, posts, beams, & joists to be installed. Any existing slab work damaged to be repaired like for like.
57 Cadillac Unit # 9 - HVAC C/O
HVAC CHANGE OUT, LIKE FOR LIKE 1.5 TON H/P SPLIT SYSTEM NO DUCT CHANGE LESS THAN 40FT OF DUCT, 14 SEER, 8.0 HSPF ROOFTOP MOUNT CONDENSOR
HDB # 22-015957 - 53 Cadillac #23
MINOR FRAMING (NON STRUCTUAL), MINOR PLUMBING AND ELECTRICAL REPAIRS. NEW ELECTRIC WATER HEATER. REMOVAL OF ALL WORK WITH OUT A PERMIT FOR LAUNDRY HOOK UP. DRYWALL REPAIR/ INSTALL, PAINT, FLOORING AND TRIM REQUIRED. SMOKE AND CARBON MONOXIDE DETECTORS REQUIRED.
Change-out installation of Electric - 030 gallon to Electric - 030 gallon, located inside building, screening not required.
Unit 23 & 24** REPAIR DRYROTT ON THE 2nd Floor Balcony
Unit 23 & 24**REPAIR DRYROTT ON THE 1st and 2nd Floor Balcony, The 1st and 2nd floor balcony repairs will match existing materials and will be replaced like for like. Repair of balcony is considered maintenance and is exempted from site plan and design review. No additional exterior work approved with this referral.