Active in City of Sacramento (11 permits)
Raw permit filing name: CHARGIE LLC
8 issued · 9 parcels
vs 7 prior 24m
1 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 2, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 10 | 7 | — | $923,812 | 92d (n=7) | 40d (91d p75) | Above 75th pct turnaround | |
| 1 | 1 | — | $45,000 | — | 4d (21d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 728 16th St City of Sacramento · APN 002-0172-023-0000 | EV charger COM-2519382Portal ↗ | Issued Oct 2, 2025 17d review | Finaled | $100,000 | EPC - INSTALL 20 EVCS AND (1) GATEWAY THAT'S FED THROUGH 150A PANELBOARD WITH 150A MAIN BREAKER . (20) CHARGERS SHALL BE PEDESTAL MOUNTED AND PROTECTED WITH A BOLLARD. SEE REVISION COM-2603648: REDUCED NUMBER OF EV CHARGING STATIONS, 150 AMP PANEL REMOVED, 150 AMP BREAKER REMOVED. 125 AMP PANEL ADDED, AND 100 AMP MAIN BREAKER ADDE. Filed as: CHARGIE LLC |
| 520 Media Pl City of Sacramento · APN 275-0240-105-0000 | EV charger COM-2510168Portal ↗ | Issued Jul 22, 2025 67d review | Finaled | $367,812 | EPC - Install (83) L2 EV chargers at the Grove Apartments. Filed as: CHARGIE LLC |
| 1801 L St City of Sacramento · APN 007-0082-015-0000 | EV charger RES-2507501Portal ↗ | Applied Apr 14, 2025 | Void | $135,000 | Install (20) wall-mounted L2 EV charges, (1) 250A 120/208V 3P sub panel, (1) 250A/3P breaker, (10) 40A/2P, (1) 20A/1P Filed as: CHARGIE LLC |
| 2904 S Meadows Pl A City of Sacramento · APN 049-0010-060-0000 | EV charger COM-2419038Portal ↗ | Issued Nov 21, 2024 86d review | Finaled | $40,000 | EPC - INSTALL 8 EV CHARGING STATIONS TO LOAD CENTER AND GATEWAY. SEE REVISION COM-2508776 Filed as: CHARGIE LLC |
| 4300 Norwood Ave A City of Sacramento · APN 237-0100-039-0000 | EV charger COM-2406188Portal ↗ | Issued Oct 7, 2024 199d review | Expired Permit | $36,000 | EPC - INSTALL 8 EV CHARGER PORTS. SEE REVISION COM-2500447: Installing (8) L2 chargers and (2) 100A/2P breakers instead of the 125A/2P breaker shown on the approved plans. Filed as: CHARGIE LLC |
| 1400 P St City of Sacramento · APN 006-0286-025-0000 | Remodel / interior alteration COM-2409469Portal ↗ | Issued Aug 20, 2024 111d review | Finaled | $45,000 | EPC - INSTALL 9 EV CHARGING STATIONS TO EXISTING LOAD CENTER AND GATEWAY. Conduit will be exposed and clipped to the ceiling. Filed as: CHARGIE LLC |
| 1431 Q St City of Sacramento · APN 006-0286-026-0000 | EV charger COM-2409387Portal ↗ | Issued Aug 14, 2024 106d review | Finaled | $45,000 | EPC - INSTALL 10 EV CHARGING STATIONS TO EXISTING LOAD CENTER AND GATEWAY. Filed as: CHARGIE LLC |
| 1108 R St City of Sacramento · APN 009-0075-009-0000 | EV charger COM-2316157Portal ↗ | Issued May 13, 2024 286d review | Finaled | $100,000 | EPC - • Removal of (3) existing wall mounted L2 chargers • Installation of (17) pedestal mounted L2 chargers and (3) wall mounted L2 chargers • Installation of bollards to project chargers and other electrical equipment. • Installation and commissioning of network equipment. Filed as: CHARGIE LLC |
| 1400 P St City of Sacramento · APN 006-0286-025-0000 | EV charger COM-2403241Portal ↗ | Applied Feb 14, 2024 | Void | $45,000 | INSTALL 9 EV CHARGING STATIONS TO EXISTING LOAD CENTER AND GATEWAY. Filed as: CHARGIE LLC |
| 729 Dixieanne Ave City of Sacramento · APN 275-0053-027-0000 | EV charger COM-2311183Portal ↗ | Issued Sep 1, 2023 92d review | Expired Permit | $15,000 | EPC - Install 3 load managed level 2 EV chargers and 1 load controller circuit on existing 125 Amp house panel. **See COM-2320996 for revision change of the original design to show new panel re-feeding the 50-amp load. SEE REVISION COM-2408496 - Redesign the project to upgrade the house panel to 100A for EV Charger installation. SEE REVISION COM-2418429 Electrical Modification to our approved permit for 729 Dixieanne. Filed as: CHARGIE LLC |
| 2904 S Meadows Pl City of Sacramento · APN 049-0010-060-0000 | EV charger COM-2315537Portal ↗ | Applied Jul 25, 2023 | Expired Application | $40,000 | EPC - Install 8 EV chargers, 1 load controller, and 1 400amp circuit. Filed as: CHARGIE LLC |