Sacramento 95814 · Downtown · APN 006-0103-023-0000 · City of Sacramento
Zoned C-3-SPD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $593,000 ($522,000–$664,000).
On-parcel permit history is indexed through Oct 7, 2026, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
162 substantial renovation & housing permits over 24 months (114.0 per 1,000 parcels vs. 30.4 citywide baseline) (#33 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Downtown)
all of the lot of the parcel intersects Zone X: minimal flood hazard. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$593,000
Benchmark range: $522,000 – $664,000
Closest lead: 918 J Façade Remodel (480 ft NW, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$601/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 282 homes completed, 128 permitted, 338 proposed or in review (343 of them deed-restricted affordable); 2 commercial or mixed-use projects.
17 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
618 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-3 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Entitled" for 5.8 yr (since Jan 15, 2021), with no new permit record in 5.8 yr. · 1 unit
In "Entitled" for 5.8 yr (since Jan 21, 2021), with no new permit record in 5.8 yr. · 137 units
In "Entitled" for 5.8 yr (since Feb 8, 2021), with no new permit record in 5.8 yr. · 73 units
In "Entitled" for 5.8 yr (since Feb 9, 2021), with no new permit record in 5.8 yr. · 2 units
In "Entitled" for 5.7 yr (since Mar 11, 2021), with no new permit record in 5.7 yr. · 5 units
In "Entitled" for 5.7 yr (since Mar 11, 2021), with no new permit record in 5.7 yr. · 7 units
Nearby permit (92ce9e9971d0e5911950ad803bf38cbff381947a): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (792c1e9607e2695d2e5e168c15ca21d14489474c): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (c81c12e562583fd5031bf5fc1c1b2d3aae7067d0): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (c6ae48b6087da9b5c192cc94ff1dc2e33b894353): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Status changed from Plan Check Target to Issued
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Issued date changed from (blank) to 2026-10-20
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Project name changed from 500 CAPITOL MALL - SUITE 1150, TENAN IMPROVEMENT to 500 CAPITOL MALL - SUITE 1050, TENANT IMPROVEMENT
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (500 Capitol Mall 1050): Contractor changed from (blank) to J SUTTER BUILDERS
Record FPP-2621338 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (1000 J St): Status changed from Issued to Expired Permit
Record COM-2504529 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (405 K St 170): Status changed from Plan Check Target to Ready-to-Issue
Record SIG-2619002 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (405 K St 170): Project name changed from SIGN to SIGN - SACRAMENTO KINGS TEAM STORE
Record SIG-2619002 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (555 Capitol Mall 1090): Status changed from Plan Check Target to Plan Check Wait
Record COM-2616737 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1228 N St): First appeared in published agency feed
Record COM-2621606 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (815 11th St): First appeared in published agency feed
Record COM-2621532 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1000 G St 100): Status changed from Ready-to-Issue to Issued
Record FPP-2619923 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Entitled" for 5.5 yr (since May 26, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (10 housing units across 0 permits).
In "Entitled" for 3.7 yr (since Mar 2, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (204 housing units across 0 permits).
In "In review" for 2.8 yr (since Jan 19, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (206 housing units, $61,800,000 declared valuation across 1 permit).
In "Entitled" for 5.8 yr (since Jan 21, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (137 housing units across 0 permits).
In "Fee estimate" for 3.3 yr (since Jul 13, 2023), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale (28 housing units, $175,000,000 declared valuation across 1 permit).
In "Entitled" for 7 yr (since Nov 5, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (60 housing units, $12,000,000 declared valuation across 2 permits).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 1,421 parcels
−15.9% YoY
City baseline: 30.4 / 1k
162 in trailing 24m
Includes 3 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Descor | Commercial tenant improvement | 4 on parcel27 in ½ mi | $68,753,201 | 8 vs 12 prior−33% |
| Illuminated Creations | Remodel / interior alteration | 1 on parcel2 in ½ mi | $25,500 | 0 vs 0 prior |
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS LLC Recent nearby: 925 L St (Oct 6, 2026) |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95814
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($5,950/yr) + local voter-approved bond debt ($833/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$25,580/yr
Cash needed: $130,900
NOI: $10,524/yr
P&I: $3,009/mo
For $0/mo net cash flow
At $2,125/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,955/mo | −$2,376/mo | -21.8% | $5,271/mo | −$2,354/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,125/mo | −$2,132/mo | -19.5% | $4,879/mo | −$1,989/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,253/mo | −$1,991/mo | -18.3% | $4,766/mo | −$1,711/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Finaled / completed153 unitsSep 5, 2019 – Aug 28, 2023
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
REVISION TO COM-2616362
REVISION TO COM-2616362 Revisions to Fire Alarm sheets
REMODEL
EPC - ADDING OF DUCTING TO EXISTING MECHANICAL EQUIPMENT WITHIN RETAIL SPACE 3/4. INDOOR AND OUTDOOR MECHANICAL EQUIPMENT IS ALREADY INSTALLED AND WAS COVERED BY A SEPARATE PERMIT. ALSO, ADDING FIRE ALARM TO THE SPACE. SEE REVISION COM-2622432 FIRE ALARM SHEETS.
Interior Remodel
EPC - Addition of bathroom to existing shell retail space. Not applying for occupancy under this permit. Future tenant will apply for occupancy with Tenant Improvement work.
REVISION TO COM-2425118
EPC - Revision to HVAC drawing to remove reference to condensate pump and line that will be installed under a future permit.
Interior Remodel
EPC - Landlord scope of work to bring Retail space to Warm Shell classification. Tenant will submit separate future permit for build out of space and occupancy. ** REVISION COM-2503420: - Revision to HVAC drawing to remove reference to condensate pump and line that will be installed under a future permit. **
REVISION TO COM-2417724
EPC - Removed distribution ductwork from sheet M-1.11A. HVAC distribution ductwork will not be installed under this permit. A future TI & occupancy permit will be submitted once a tenant has been identified for the space and have determined their final layout for the space. HVAC supply distribution will be shown in that future permit.
remodel
EPC - remodel of retail space to bring up to warm/white shell classification. Furring, prepping & painting walls. Installation of restroom. Installation of MEP/FP systems. (SEE REVISION COM-2426325 to remove supply ductwork from scope - 12/03/24 - NCB)
EV Chargers (4)
EPC - ADDING ELECTRIC VEHICLE CHARGERS TO EXISTING BUILDING STRUCTURE. ALL WORK IS IN LEVEL 1 & BASEMENT OF PARKING GARAGE. ELECTRICAL SCOPE OF WORK CONSIST OF ADDITION OF (1) PANEL "H1A1" FED FROM EXISTING PANEL "HM" & ADDITION OF (4) WALL MOUNTED LEVEL 2 ELECTRIC VEHICLE CHARGERS.
1030 J ST - Guard Rail Upgrade
EPC - We are revising the balcony railings on the newly constructed Envoy building at 11th & J St. We are removing the bottom cables and replacing them with perforated metal panels for safety.
REV22 - Cathedral Square - Mechanical
EPC - EXPEDITED - REVISION TO COM-1925220. Per Inspector request air intake and exhaust has been added to the fire pump room. Revised the drawings to remove the mechanical equipment shown to be a future install with the retail TI's. Revision scope changed at cycle 2 as fire-pump room does not require heating. SEE NARRATIVE IN APP FILE.
1030 J STREET
install one (1) illuminated canopy sign, install one (1) non-illuminated wall plaque, install one (1) set window vinyl
REV21 - Cathedral Square - Fire Alarm
EPC - REVISION to previously approved deferred alarm plans (COM-2108701). Added monitoring module devices. See sheets FA0.1, FAR0.1, and floor plans on FA2.3 New construction main permit is under COM-1925220.
Cathedral Square - ERRCS
EPC - DEFERRED TO COM-1925220. ERRCS Radio Enhancement System as required by fire code.
Cathedral Square - ERRCS
ERRCS Radio Enhancement System as required by fire code. The construction of new 7-stroy mixed use building is under COM-1925220.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
0.66 acres
Assessor's classification for assessment purposes. This is not zoning.
1000 11TH ST; 1004 11TH ST; 1010 11TH ST
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 006-0103-023-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| Commercial tenant improvement |
| 206 in ½ mi |
| $35,507,897 |
| 39 vs 62 prior−37% |
| Browning Construction Recent nearby: 555 Capitol Mall 1200 (Oct 16, 2026) | Commercial tenant improvement | 66 in ½ mi | $6,475,040 | 5 vs 9 prior−44% |
| Bt Builders Recent nearby: 1201 K St 1615 (Sep 4, 2026) | Commercial tenant improvement | 59 in ½ mi | $12,723,347 | 10 vs 12 prior−17% |
| Jones And Lamberti Builders Recent nearby: 621 Capitol Mall 1525 (Oct 20, 2026) | Commercial tenant improvement | 58 in ½ mi | $14,374,708 | 28 vs 33 prior−15% |
| Marketone Builders Recent nearby: 660 J St (May 24, 2024) | Commercial tenant improvement | 41 in ½ mi | $19,637,973 | 10 vs 13 prior−23% |
| Black Pine Builders Recent nearby: 425 10th St (Oct 4, 2018) | New single-family home | 41 in ½ mi | $10,947,700 | 2 vs 0 prior |
| White Star Construction Recent nearby: 1225 H St (Jun 21, 2024) | Commercial tenant improvement | 36 in ½ mi | $16,709,322 | 1 vs 13 prior−92% |
| Jeff Gunnell Construction Recent nearby: 428 J St (Oct 12, 2026) | Commercial tenant improvement | 31 in ½ mi | $6,333,670 | 19 vs 8 prior+138% |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alteration | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| EV chargerOn this parcel | 225 | 17d | 40d | 91d | 190d | 40d(vs 45d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
Cathedral Square - DEFERRED Garage Fencing
EPC - DEFERRED TO COM-1925220. Deferred submittal for the non-structural, decorative, interior bike storage fencing at garage.
Cathedral Square - DEFERRED Canopies/Guardrails/Railings
EPC - DEFERRED TO COM-1925220. Deferred submittal for the following non-structural decorative metal items: canopies, awnings, and guardrails.
REV20 - Cathedral Square - Fire Alarm
EPC - REVISION to previously approved deferred alarm plans (COM-2108701). Add smoke detector to elevator shaft and notification to basement. New construction is under COM-1925220.
REV19 - Cathedral Square - Backflow Drain Pump
EPC - REVISION TO COM-1925220. A Backflow Drain Pump added to room B08 where the backflow preventer is located. A floor drain was not designed for the room and it is too far into construction to add one, so we are installing a drain pump instead. Included are Plumbing and Electrical sheets with requirements and location of the pump.
REV18 - Exit Signage - Cathedral Square
EPC - REVISION TO COM-1925220. Revision to egress plans and electrical floor plans showing the required exit signs throughout the building. The egress plans were updated to match the locations shown on electrical plans. Electrical plans were missing exit signs at the western fire door in the corridor. All changed clouded and tagged as delta 132 - RFI #433.
REVISION - Deferred Elevator
EPC - REVISION TO COM-2123084. The deferred submittal for the elevator (COM-2123084) was previously approved. However some of the bracket attachment points have been changed by several inches so this submittal is being updated to capture the changes. Main permit for new construction is COM-1925220.
REVISION - Fire/Smoke Dampers
EPC - REVISION TO COM-1925220. Revision to mechanical opening in the SMUD Vault changing the Fire Smoke Dampers to Fire Dampers with SMUD approval.
REVISION - Relocate Water Meter
EPC - REVISION TO COM-1925220. Per request from the city inspector we are relocating the water meter inside the building due to there not being enough space in the alley with the other utilities running in the same location. Water meter to be moved into storage room B08 next to the backflow preventer.
REVISION - Cathedral Square - Mechanical Title 24 Documents
EPC. Revision to COM-1925220. Revisions made to the Title 24 including envelope model, wall assembly, roof product values, mechanical equipment, lighting.
REVISION - Cathedral Square - Metal Grille at Alley
EPC - REVISION TO COM-1925220. Revision to the Metal Grille that sits atop the two garage doors in Jazz Alley. This change was made due to several plumbing lines that run from the units above through the slab and turn into the garage over the garage doors. (4) vertical HSS posts were added above each beam for a total of (5). The architectural louvers were removed to allow the plumbing to enter the building.
Revision - Title 24
EPC - Revision to COM-1925220; Revisions made to the Title 24 report due to building information that was not included in the original report.
Revision - Smoke Damper Install
EPC - Revision to COM-1925220; There is a large mechanical opening on the exterior wall of the Transformer Vault for ventilation of the Vault. The opening is too big to fit one fire smoke damper. The opening needs to be split into two so that we can install the required fire smoke dampers. We have achieved this by installing two 2x12 c-channels facing each other and filled with GWB. On the outside will be a metal break shape with fire caulking to the louvered vents. These plans show details for this as well as other electrical and mechanical information updated.
Revision - Storefront
EPC - Revision to COM-1925220; Revision to the Storefront door types and locations. Doors changed from double doors to single. Doors moved away from the columns. Revisions also made for the retail canopies. Some were extended to cover the new door locations with additional supports added with post embeds into the bottom of the slab.
REVISION - Electrical
EPC - REVISION TO COM-1925220. "Cathedral Square" - Various revisions to electrical sheets including addition and relocation of outlets etc., updates to Load Calculation & updates to the panels. SEE APP FILE FOR SHEET BY SHEET NARRATIVE.
Deferred - Exterior Maintenance System
EPC - DEFERRED TO COM-1925220; submittal for the Exterior Building Maintenance system (EMB). I.e. window washing equipment.
Revision - Structural Post
EPC - Revisions to COM-1925220; Structural posts, embedment's, joist layouts, etc.
Revision - Structural Clarification
EPC - Revision to COM-1925220; Structural clarification updates to the stressing blockouts in response to additional information from the builder and shop submittal reviewer.
Deferred - Cathedral Square - Glass Railing & Glass Canopy
EPC - Deferred to COM-1925220; Glass Railing & Glass Canopy.
Revision - Rebar - Cathedral Square
EPC - Revision to COM-1925220; Clarification updates to the Structural construction documents in response to requests for information from the builder and shop submittal review. #4 reinforcing bars in the transfer slab have been allowed to be increased to a larger size in order to reduce the total number of bars to help reduce the overall reinforcing congestion within the slab. The revised reinforcing locations are simply substitutions based on area of steel.
Deferred - Steel Stair - Cathedral Square
EPC - Deferred to COM-1925220; Steel stairs deferred submittal for review. Shop drawings and calcs.
Cathedral Square - Deferred Traction Elevator
EPC - Deferred to COM-1925220; Traction Elevator Deferred Submittal.
Cathedral Square - Deferred Storefront System
EPC - Deferred to COM-1925220 for Storefront System
Cathedral Square - Revision #6
EXPEDITED - EPC - Revision to COM-1925220 to alter some beam rebar locations in the ground level deck.
Cathedral Square - Deferred Car Lift
EPC - Deferred to COM-1925220 for Car lift stacker to be installed at the elevated deck.
Cathedral Square - Deferred ATS System
EPC - Deferred to COM-1925220 for ATS System of rough carpentry framing.
Cathedral Square - Revision #5 Structural
EPC - Revision to COM-1925220 for structural change with SSR and ATS length & location revisions.