Sacramento 95831 · Pocket · APN 031-0620-017-0000 · City of Sacramento
Zoned R-2B in City of Sacramento with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $720,000 ($634,000–$806,000).
Zone R-2B allows residential use qualifying for ministerial ADU review under state law (1 ADU permit permitted within ¼ mile in 36 months).
Source: City of Sacramento zoning · CA Gov. Code 66314
Public building records show issued construction/renovation work on this parcel (157 total permits, latest Oct 23, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
318 substantial renovation & housing permits over 24 months (35.6 per 1,000 parcels vs. 30.4 citywide baseline) (#19 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Pocket)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$720,000
Benchmark range: $634,000 – $806,000
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
General repair (COM-2605370): Issued after 4 mo (8.9× the 14d median) — slower than 90% of general repair permits in City of Sacramento (median 14d, 90th pct 65d, n=1,579).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$722/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 3 homes completed; 2 commercial or mixed-use projects.
5 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
484 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of R-2B as multifamily residential, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
Nearby remodel / interior alteration (10 Ridgemark Ct): First appeared in published agency feed
Record RES-2622909 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (7359 Windbridge Dr): First appeared in published agency feed
Record RES-2622812 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (7388 Windbridge Dr): First appeared in published agency feed
Record RES-2623665 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (104 Southlite Cir): Status changed from Issued to Expired Permit
Record RES-2521409 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby general repair (27 Shady River Cir): Status changed from Plan Check Target to Ready-to-Issue
Record RES-2620516 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby general repair (27 Shady River Cir): Declared valuation changed from 15500 to 14700
Record RES-2620516 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (813 Silliman Way): Status changed from Issued to Finaled
Record RES-2605684 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (2 Princeville Cir): First appeared in published agency feed
Record RES-2621882 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby pool / spa (935 Sunwood Way): First appeared in published agency feed
Record RES-2623627 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby electrical / panel (14 Riverbrea Ct): First appeared in published agency feed
Record RES-2623046 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (1000 Florin Rd): Status changed from Issued to Finaled
Record COM-2605989 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (7255 Long River Dr): First appeared in published agency feed
Record RES-2621578 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (804 Sao Jorge Way): First appeared in published agency feed
Record RES-2623088 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (856 Klein Way): Status changed from Issued to Finaled
Record RES-2615458 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (72 Parkshore Cir): First appeared in published agency feed
Record RES-2623569 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →Issued after 4 mo (8.9× the 14d median) — slower than 90% of general repair permits in City of Sacramento (median 14d, 90th pct 65d, n=1,579).
Issued after 4 mo (8.9× the 14d median) — slower than 90% of general repair permits in City of Sacramento (median 14d, 90th pct 65d, n=1,579).
Issued after 4 mo (8.9× the 14d median) — slower than 90% of general repair permits in City of Sacramento (median 14d, 90th pct 65d, n=1,579).
Issued after 4 mo (8.9× the 14d median) — slower than 90% of general repair permits in City of Sacramento (median 14d, 90th pct 65d, n=1,579).
Issued after 4 mo (8.9× the 14d median) — slower than 90% of general repair permits in City of Sacramento (median 14d, 90th pct 65d, n=1,579).
Issued after 4 mo (8.9× the 14d median) — slower than 90% of general repair permits in City of Sacramento (median 14d, 90th pct 65d, n=1,579).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 8,924 parcels
−7.3% YoY
City baseline: 30.4 / 1k
318 in trailing 24m
Includes 7 ADUs
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Neels Heating And Air | HVAC / heat pump | 67 on parcel67 in ½ mi | $461,789 | 0 vs 0 prior |
| Sagan Electric | Electrical / panel | 24 on parcel26 in ½ mi | $179,930 | 61 vs 43 prior+42% |
| Phillip Isaacs Construction | Windows / doors / siding | 24 on parcel24 in ½ mi | $516,782 |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95831
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($7,200/yr) + local voter-approved bond debt ($1,008/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$30,642/yr
Cash needed: $158,400
NOI: $13,046/yr
P&I: $3,641/mo
For $0/mo net cash flow
At $2,550/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $2,346/mo | −$2,847/mo | -21.6% | $6,319/mo | −$2,817/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,550/mo | −$2,554/mo | -19.3% | $5,849/mo | −$2,379/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,703/mo | −$2,385/mo | -18.1% | $5,713/mo | −$2,047/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
7236 Greenhaven Dr, Building 5
7236 Greenhaven Dr, Building 5: Repair of existing exterior balconies & landings at multifamily residence, submitted as three applications on one shared plan set. All work: new Westcoat decking and steel guardrails; structural repair of dry rot discovered during demolition; exterior finishes damaged during construction replaced in like kind to match existing. (1) Bldg. 5, Units 49-50: Replace (1) balcony at Unit 50 (53.22 SF) and (1) landing serving Units 50 & 52 (50.00 SF), including ledger attachment at adjacent Bldg. 5, Units 51-54 wall. Total 103.22 SF. Value $28,042. (2) Bldg. 5, Units 51-54: Replace (2) balconies at Units 52 & 54 (53.22 SF each). Total 106.44 SF. Value $28,916. Landing ledger attachments at this building documented here, valued under applications (1) and (3). (3) Bldg. 5, Units 55-56: Replace (1) balcony at Unit 56 (53.22 SF) and (1) landing serving Units 54 & 56 (50.00 SF), including ledger attachment at adjacent Bldg. 5, Units 51-54 wall. Total 103.22 SF. Value $28,042. Building 5 total: 4 balconies, 2 landings
BALCONY/DECK REPLACEMENT
3 SHARED PLANS 7236 GREENHAVEN DR, BLDG 3, UNITS 37-40 AFFECTED UNITS: 38 & 40 - TWO (2) BALCONIES, ONE (1) LANDING. ALL BALCONIES ARE 53.22 SF EACH. SCOPE OF WORK FOR ALL AFFECTED BALCONIES IS IDENTICAL. THE LANDING SERVING UNITS 34, 36, 38 & 40 IS 289.17 SF. LANDING VALUATION IS CARRIED UNDER THIS APPLICATION, INCLUDING LEDGER ATTACHMENT AT THE ADJACENT BLDG 3, UNITS 29-36 WALL. SCOPE OF WORK: PLANS FOR REPAIR OF EXISTING BALCONIES & LANDINGS AT MULTI-FAMILY RESIDENCE. ALL EXISTING BALCONIES & LANDINGS WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. ALL STRUCTURAL MEMBERS HAVE BEEN DESIGNED AND IDENTIFIED TO ADDRESS DRY ROT DISCOVERED DURING DEMOLITION/INSTALLATION. ALL EXTERIOR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR WITH LIKE KIND AND COLORS TO MATCH EXISTING. Shared plans reviewed under COM-2623430
BALCONY/DECK REPLACEMENT
3 SHARED PLANS 7236 GREENHAVEN DR, BLDG 3, UNITS 29-36 AFFECTED UNITS: 30, 32, 34 & 36 - FOUR (4) BALCONIES. ALL BALCONIES ARE 53.22 SF EACH. SCOPE OF WORK FOR ALL AFFECTED BALCONIES IS IDENTICAL. LANDINGS SERVING THESE UNITS ARE LEDGERED TO THIS BUILDING AND ARE VALUED UNDER BLDG 3, UNITS 25-28 (UNITS 30 & 32) AND BLDG 3, UNITS 37-40 (UNITS 34 & 36). SCOPE OF WORK: PLANS FOR REPAIR OF EXISTING BALCONIES AT MULTI-FAMILY RESIDENCE. ALL EXISTING BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. ALL STRUCTURAL MEMBERS HAVE BEEN DESIGNED AND IDENTIFIED TO ADDRESS DRY ROT DISCOVERED DURING DEMOLITION/INSTALLATION. ALL EXTERIOR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR WITH LIKE KIND AND COLORS TO MATCH EXISTING. Shared plans reviewed under COM-2623430
BALCONY/DECK REPLACEMENT
3 SHARED PLANS 7236 GREENHAVEN DR, BLDG 3, UNITS 25-28 AFFECTED UNITS: 26 & 28 - TWO (2) BALCONIES, ONE (1) LANDING. ALL BALCONIES ARE 53.22 SF EACH. SCOPE OF WORK FOR ALL AFFECTED BALCONIES IS IDENTICAL. THE LANDING SERVING UNITS 26, 28, 30 & 32 IS 289.17 SF. LANDING VALUATION IS CARRIED UNDER THIS APPLICATION, INCLUDING LEDGER ATTACHMENT AT THE ADJACENT BLDG 3, UNITS 29-36 WALL. SCOPE OF WORK: PLANS FOR REPAIR OF EXISTING BALCONIES & LANDINGS AT MULTI-FAMILY RESIDENCE. ALL EXISTING BALCONIES & LANDINGS WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. ALL STRUCTURAL MEMBERS HAVE BEEN DESIGNED AND IDENTIFIED TO ADDRESS DRY ROT DISCOVERED DURING DEMOLITION/INSTALLATION. ALL EXTERIOR FINISHES DAMAGED DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR WITH LIKE KIND AND COLORS TO MATCH EXISTING. Shared plans reviewed under COM-2623430
7236 GREENHAVEN DR #123- HVAC C/O
HVAC SPLIT SYSTEM LIKE FOR LIKE.NO DUCT WORK PERMITTED.CF-1R-ALT-HVAC ON FILE.THE EXISTING UNIT SHALL BE REMOVED. THE NEW UNIT SHALL BE PLACED IN THE SAME LOCATION AS THE EXISTING UNIT. AS NOTED ON FORM CDD-0036, APPLIANCES HEAVIER THAN 400LBS REQUIRE ENGINEERING CALCULATIONS.CARBON MONOXIDE & SMOKE ALARMS REQUIRED. REFERENCE CRC SECTIONS R310.1 & R311.1. ALL WORK IS SUBJECT TO FIELD INSPECTION.
7236 GREENHAVEN DR #148 - HVAC C/O
HVAC SPLIT SYSTEM LIKE FOR LIKE CHANGE OUT. NO DUCT WORK PERMITTED. THE EXISTING UNIT SHALL BE REMOVED. THE NEW UNIT SHALL BE PLACED IN THE SAME LOCATION AS THE EXISTING UNIT. AS NOTED ON FORM CDD-0036, APPLIANCES HEAVIER THAN 400LBS REQUIRE ENGINEERING CALCULATIONS. CF-1R-ALT-HVAC ON FILE. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314. ALL WORK IS SUBJECT TO FIELD INSPECTION.
7236 GREENHAVEN DR #111
HVAC SPLIT SYSTEM LIKE FOR LIKE. THE EXISTING UNIT SHALL BE REMOVED. THE NEW UNIT SHALL BE PLACED IN THE SAME LOCATION AS THE EXISTING UNIT. AS NOTED ON FORM CDD-0036, APPLIANCES HEAVIER THAN 400LBS REQUIRE ENGINEERING CALCULATIONS. NO DUCT WORK PERMITTED.CF-1R-ALT-HVAC ON FILE. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314. ALL WORK IS SUBJECT TO FIELD INSPECTION.
7236 GREENHAVEN DR # 40- HVAC C/O
HVAC SPLIT SYSTEM. LIKE FOR LIKE.NO DUCT WORK PERMITTED.CF-1R-ALT-HVAC ON FILE. THE EXISTING UNIT SHALL BE REMOVED. THE NEW UNIT SHALL BE PLACED IN THE SAME LOCATION AS THE EXISTING UNIT. AS NOTED ON FORM CDD-0036, APPLIANCES HEAVIER THAN 400LBS REQUIRE ENGINEERING CALCULATIONS. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314. ALL WORK IS SUBJECT TO FIELD INSPECTION.
Greenhaven Oaks Apts - Deck repairs BLDG 20, UNITS 166, & 168
EXPEDITED - EPC - Balcony repair for BLDG 20, UNITS 166, & 168 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs BLDG 20, UNIT 164
EXPEDITED - EPC - Balcony repair for BLDG 20, UNIT 164 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs BLDG 19, UNITS 158 & 160
EXPEDITED - EPC - Balcony repair for BLDG 19, UNITS 158 & 160 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs BLDG 18, UNITS 150 & 152
EXPEDITED - EPC - Balcony repair for BLDG 18, UNITS 150 & 152 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs BLDG 18, UNIT 148
EXPEDITED - EPC - Balcony repair for BLDG 18, UNIT 148 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs BLDG 17, UNIT 146
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
9.95 acres
Assessor's classification for assessment purposes. This is not zoning.
7236 GREENHAVEN DR; 7236 GREENHAVEN DR # 100 # 100; 7236 GREENHAVEN DR # 10 # 10
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 031-0620-017-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| 20 vs 25 prior−20% |
| Good Life Construction | General repair | 11 on parcel13 in ½ mi | $150,368 | 36 vs 29 prior+24% |
| Sea Heating And Air Conditioning | HVAC / heat pump | 10 on parcel10 in ½ mi | $52,100 | 0 vs 0 prior |
| Timco Construction | Addition (adds square footage) | 6 on parcel6 in ½ mi | $159,000 | 0 vs 1 prior |
| Orange Construction | Addition (adds square footage) | 5 on parcel5 in ½ mi | $214,000 | 4 vs 0 prior |
| Oasis Home Renovation HVAC | Demolition | 2 on parcel2 in ½ mi | $158,500 | 0 vs 0 prior |
| Clarke And Rush Mechanical | HVAC / heat pump | 2 on parcel2 in ½ mi | $9,000 | 4 vs 12 prior−67% |
| Tuck Brothers | Windows / doors / siding | 2 on parcel2 in ½ mi | $8,500 | 0 vs 0 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| DemolitionOn this parcel | 705 | 0d | 1d | 7d | 35d | 2d |
| Addition (adds square footage)On this parcel | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvement | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EXPEDITED - EPC - Balcony repair for BLDG 17, UNIT 146 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs BLDG 16, UNITS 134 & 136
EXPEDITED - EPC - Balcony repair for BLDG 16, UNITS 134 & 136 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs BLDG 16, UNIT 132
EXPEDITED - EPC - Balcony repair for BLDG 16, UNIT 132 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs, BLDG 14, UNIT 112
EXPEDITED - EPC - Balcony repair for BLDG 14, UNIT 112 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs, BLDG 10, Unit 82
EXPEDITED - EPC - Balcony repair for BLDG 10, Unit 82 BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
Greenhaven Oaks Apts - Deck repairs, UNIT 80
EXPEDITED - EPC - Balcony repair for UNITS 80, 82, 112, 132, 134, 136, 146, 148, 150, 152, 158, 160, 164, 166, & 168 -15 TOTAL. BALCONIES WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS. Shared plans reviewed under COM-2605347
7236 GREENHAVEN DR #12
REMOVE AND REPLACE HVAC SPLIT SYSTEM LIKE FOR LIKE. NO DUCT WORK. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314.
7236 GREENHAVEN DR # 23 - HVAC C/O
HVAC SPLIT SYSTEM CHANGE OUT, LIKE FOR LIKE. NO DUCT WORK PERMITTED. THE EXISTING UNIT SHALL BE REMOVED. THE NEW UNIT SHALL BE PLACED IN THE SAME LOCATION AS THE EXISTING UNIT. AS NOTED ON FORM CDD-0036, APPLIANCES HEAVIER THAN 400LBS REQUIRE ENGINEERING CALCULATIONS. CF-1R-ALT-HVAC ON FILE. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314. ALL WORK IS SUBJECT TO FIELD INSPECTION.
7236 GREENHAVEN DR APT 176 - HVAC C/O
HVAC SPLIT SYSTEM CHANGE OUT, LIKE FOR LIKE. NO DUCT WORK PERMITTED. THE EXISTING UNIT SHALL BE REMOVED. THE NEW UNIT SHALL BE PLACED IN THE SAME LOCATION AS THE EXISTING UNIT. AS NOTED ON FORM CDD-0036, APPLIANCES HEAVIER THAN 400LBS REQUIRE ENGINEERING CALCULATIONS. CF-1R-ALT-HVAC ON FILE. CARBON MONOXIDE & SMOKE ALARMS ARE REQUIRED. REFERENCE CRC SECTIONS R315 & R314. ALL WORK IS SUBJECT TO FIELD INSPECTION.
7236 greenhaven Dr unit 86 HVAC C/O
HVAC Split system like for like
BALCONY REPLACEMENTS & DRY ROT REPAIRS - BLDG 3 GREENHAVEN OAKS
EPC - BALCONY REPLACEMENTS & DRY ROT REPAIRS. PLANS FOR REPAIR OF EXISTING BALCONIES AND LANDINGS AT MULTI-FAMILY RESIDENCE. REPAIRS LOCATED AT BUILDING THREE. ALL EXISTING BALCONIES & LANDINGS WILL BE REPLACED WITH NEW WESTCOAT DECKING AND STEEL GUARDRAILS.
Units 131-138, 7236 GREENHAVEN DR BLD 16 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 139-146, 7236 GREENHAVEN DR BLD 17 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 147-154, 7236 GREENHAVEN DR BLD 18 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 155-162, 7236 GREENHAVEN DR BLD 19 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 163-170, 7236 GREENHAVEN DR BLD 20 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 171-178, 7236 GREENHAVEN DR BLD 21 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 179-182, 7236 GREENHAVEN DR BLD 22 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 183-190, 7236 GREENHAVEN DR BLD 23 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 95-102, 7236 GREENHAVEN DR BLD 12 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 103-110, 7236 GREENHAVEN DR BLD 13 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 115-130, 7236 GREENHAVEN DR BLD 15 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
7236 Greenhaven Drive Building 11, Units 87-94 com minor electrical permit no plans
Electrical Permit: FOR BUILDING 11-Units 87-94-Like for like replacement of sub panels. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Drive Building 14, Units 111-114 com minor electrical permit no plans
Electrical Permit: FOR BUILDING 14, Units 111-114 Like for like replacement of 100 amps indoor sub panels. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Drive Building 8, Unit 73-com electrical permit minor no plans
Electrical Permit: FOR BLDG. 8, Unit 73-Like for like replacement of 100 amp indoor subpanels.Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Units 74-78, 7236 GREENHAVEN DR BLD 9 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 79-86, 7236 GREENHAVEN DR BLD 10 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 65-72, 7236 GREENHAVEN DR BLD 7 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
Units 57-64 7236 GREENHAVEN DR BLD 6 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
7236 Greenhaven Dr. Bldg 5. Units 49-56 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
7236 Greenhaven Dr. Bldg 4. Units 41-48 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
7236 Greenhaven Dr. Bldg 2. Units 9-24 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
7236 Greenhaven Dr. Bldg 4. Units 41-48 | Subpanel C/O's
Like for like replacement of 100A indoor subpanels. All work subject to field inspection.
7236 Greenhaven Drive Building 1, Units 1-8 com minor electrical permit no plans
Electrical Permit: FOR BUILDING 1, Units 1-8- Like for like replacement of 100 amp indoor sub panels. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Drive Building 3. Units 25-40
Electrical Permit: FOR BLDG. 3-Units 25-40=like for like replacement of 100 amp indoor sub panels. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Drive Bldg. 5 com siding permit minor no plans
Siding Permit: FOR Bldg. 5-Replace 40% of T1-11 8" OC. Siding with the same. Replace trim that is dry rot with the same.
7236 Greenhaven Drive #42 com HVAC permit minor no plans
HVAC Permit: FOR UNIT #42-HVAC split system, like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 GREENHAVEN DR # 3-SIDING
SIDING REPLACEMENT LIKE FOR LIKE. 25.6 SQUARES OF T1-11 ENGINEERING THEATRE SIDING. ALL WORK SUBJECT TO FIELD INSPECTION.
7236 GREENHAVEN DR # 8-HVAC C/O
"HVAC split system replacement like for like" Per CDD-0036, Existing and Pro[osed units are both 160lbs. All work subject to field inspection. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 GREENHAVEN DR APT 143-HVAC C/O
HVAC SLIT-SYSTEM REPLACEMENT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: All work subject to field inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhave Dr Unit 168: HVAC C/O
HVAC split system C/O like for like; The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Dr Unit 134: HVAC C/O
HVAC split system C/O like for like; The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Drive #110 com HVAC permit minor no plans
HVAC Permit: HVAC split system change out, like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 GREENHAVEN DR - BLDG # 2, LAUNDRY ROOM 4
Change-out installation of Gas - 100 gallon 80,000 BTU water heater to Gas - Tankless 199,000 BTU water heater, located inside building # 2 laundry room 4, screening not required. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
7236 GREENHAVEN DR #24 - C/O HVAC
7236 GREENHAVEN DR #24 - C/O HVAC split system, like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
7236 Greenhaven Drive #104 com HVAC permit minor no plans
HVAC Permit: HVAC split system, like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Drive #35 com HVAC permit minor no plans
HVAC Permit: HVAC split system, like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
EVCS
EPC - Install (1) new ChargePoint CP6021B-80A-L5.5 Series Level 2 AC charging for businesses. Run power from the panel inside the building to the outdoor parking lot.
SEWER REPAIR
Dig 40x3' trench exposing damaged sewer from root intrusion. Cut out this section of damaged pipe and replace with ABS pipe and 2 strong back couplings. This is like for like spot repair only. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
COMM HVAC Changeout
HVAC SPLIT SYSTEM REPLACEMENT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Unit #60- C/O HVAC
HVAC SPLIT SYSTEM CHANGEOUT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Water conserving fixtures are required to be installed throughout this structure per SB 407 (Note: Residences built after January 1, 1994 are exempt) Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
Unit #59 - C/O HVAC
HVAC SPLIT SYSTEM CHANGEOUT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Water conserving fixtures are required to be installed throughout this structure per SB 407 (Note: Residences built after January 1, 1994 are exempt) Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
Unit #99 - C/O HVAC
HVAC SPLIT SYSTEM CHANGEOUT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Water conserving fixtures are required to be installed throughout this structure per SB 407 (Note: Residences built after January 1, 1994 are exempt) Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
7236 GREENHAVEN DR #131 - HVAC
HVAC split system changeout like for like replacement. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Unit #31 - HVAC
HVAC SPLIT SYSTEM CHANGEOUT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Water conserving fixtures are required to be installed throughout this structure per SB 407 (Note: Residences built after January 1, 1994 are exempt) Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
Unit # 95, HVAC C/O
HVAC change out. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Water conserving fixtures are required to be installed throughout this structure per SB 407 (Note: Residences built after January 1, 1994 are exempt) Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. See attached site map.
Unit #43 - SIDING REPAIR
7236 GREENHAVEN DR - #43 - REMOVE AND REPLACE 125 SQ. FT. OF T1-11 SIDING PANELS AND 100' LINEAR 1X4 TRIM. ALL LIKE FOR LIKE. PAINT TO MATCH.
Unit #84 - SIDING REPAIR
7236 GREENHAVEN DR - #84 - REMOVE AND REPLACE 125 SQ. FT. OF T1-11 SIDING PANELS AND 100' LINEAR 1X4 TRIM. ALL LIKE FOR LIKE. PAINT TO MATCH.
Unit #68 - HVAC
HVAC SPLIT SYSTEM CHANGEOUT LIKE FOR LIKE. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.
Bldg 9, Units 74-78, Window Replacements (40)
"Replace 40 Alum. windows in 8 units with new vinyl. Installed as retrofits. Buld 9, units 74-78" The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in (year). (see form CCD-0327 for required size and max sill height of Egress windows the year this structure was built) Framing Inspection and Approval is required before covering framing repairs/ rot repairs. Water conserving fixtures are required to be installed throughout this structure per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
Bldg 11, Units 87-94, Window replacement (30)
REPLACE 30 WINDOWS IN 8 UNITS. LIKE FOR LIKE IN SIZE AND LOCATION. INSTALL RETROFIT. Bldg 11, Units 87-94. Water conserving fixtures are required to be installed throughout this structure per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
BLDG 23, Windows (24) & Doors (8) Replacements. Units 183-190
Replace 24 windows and 8 patio door sliders. Building 23, Units 183-190. Like for like in size & location. Install as retrofits. The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in 1980. (see form CCD-0327 for required size and height of Egress windows the year this structure was built) Framing Inspection and Approval is required before covering framing. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
BLDG 3, Windows (16) & Doors (16) Replacements. Units 25-40
Replace 16 windows and 16 patio door sliders. Building 3, Units 25-40. Like for like in size & location. Install as retrofits. The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in 1980. (see form CCD-0327 for required size and height of Egress windows the year this structure was built) Framing Inspection and Approval is required before covering framing. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
BLDG 2, Windows (16) & Doors (16) Replacements. Units 9-24
Replace 16 windows and 16 patio door sliders. Building 2, Units 9-24. Like for like in size & location. Install as retrofits. The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in 1980. (see form CCD-0327 for required size and height of Egress windows the year this structure was built) Framing Inspection and Approval is required before covering framing. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
BLDG 22, Windows (20) & Doors (4) Replacements. Units 179-182
Replace 20 windows and 4 patio door sliders. Building 22, Units 179-182. Like for like in size & location. Install as retrofits. The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in 1980. (see form CCD-0327 for required size and height of Egress windows the year this structure was built) Framing Inspection and Approval is required before covering framing. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
Bldg 19, Window (32) and Door (8) Replacements
Window replacements, Bldg 19, Units 155-162. Replace 32 windows and 8 patio sliding doors. Like for like size and location. Install as retrofits. The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in 1980. (see form CCD-0327 for required size and height of Egress windows the year this structure was built) Framing Inspection and Approval is required before covering framing repairs/ rot repairs. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2022 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
Bldg 18, Window Replacements, (27) Door Replacements (8) Units 147-154
Replace 27 windows and 8 patio sliders (doors) in building 18, Units 147-154, all like for like and location and installed as retrofits. The egress windows will meet the code requirements enforced at the time the structure was permitted. The structure was built in 1980. (see form CCD-0327 for required size and height of Egress windows the year this structure was built) Framing Inspection and Approval is required before covering framing repairs/ rot repairs. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Carbon monoxide & Smoke alarms required. Reference 2019 CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.
7236 Greenhaven Dr BLDG 17 # 139-146 - WINDOWS
REPLACE 24 WINDOWS & PATIO SLIDERS IN 8 UNITS, BLDG 17 UNITS 139-146. ALL VINYL WINDOWS, LIKE FOR LIKE IN SIZE AND LOCATION. INSTALLAS RETROFIT.
GREENHAVEN OAKS WINDOWS
REPLACE 27 WINDOWS AND 8 PATIO SLIDER DOORS IN BUILDING 21, UNITS 171-178. ALL L/L IN SIZE AND LOCATION AND INSTALLED AS RETROFITS. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Dr # 116 - HVAC C/O
HVAC SPLIT SYSTEM CHANGE-OUT LIKE FOR LIKE.
balcony replacement
EPC - SHARED PLANS 3 REPLACING EXISTING BALCONIES NO CHANGE TO THE FOOT PRINT 60 SQ FT UNITS 10,12 Shared plans reviewed under COM-2218175
balcony replacement
EPC - SHARED PLANS 3 REPLACING EXISTING BALCONIES NO CHANGE TO THE FOOT PRINT 60 SQ FT UNITS 22,24 Shared plans reviewed under COM-2218175
balcony replacement
EPC - shared plans 3 REPLACING EXISTING BALCONIES NO CHANGE TO THE FOOT PRINT 60 SQ FT UNITS 14.16,18,20 Shared plans reviewed under COM-2218175
7236 GREENHAVEN DR UNITS 21-24 - SIDING
BLDG 2 UNITS 21-24 REPLACE T1-11 SIDING DUE TO DRY ROT, LIKE FOR LIKE, NO STRUCTRUAL CHANGES Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION
7236 GREENHAVEN DR UNITS 13-20 - SIDING
BLDG 2 UNITS 13-20 REPLACE T1-11 SIDING DUE TO DRY ROT, LIKE FOR LIKE, NO STRUCTRUAL CHANGES Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION
7236 GREENHAVEN DR UNITS 9-12 - SIDING
BLDG 2 UNITS 9-12 REPLACE T1-11 SIDING DUE TO DRY ROT, LIKE FOR LIKE, NO STRUCTRUAL CHANGES Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION
7236 Greenhaven # 114 - HVAC C/O
HVAC split system change-out like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven # 81 - HVAC C/O
HVAC split system change-out like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Window Change-out (Bldg 20 / Unit 163-170)
Bldg 20 / Unit 163-170 - Non-structural change out of (24) windows & (8) sliding doors in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 16 / Unit 131-138)
Bldg 16 / Unit 131-138 - Non-structural change out of (32) windows & (8) sliding doors in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 15 / Unit 115-130)
Bldg 15 / Unit 115-130 - Non-structural change out of (16) windows & (16) sliding doors in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 14 / Unit 111-114)
Bldg 14 / Unit 111-114 - Non-structural change out of (12) windows and (4) sliding doors in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 13 / Unit 103-110)
Bldg 13 / Unit 103-110 - Non-structural change out of (32) windows and (8) sliding doors in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 12 / Units 95-102)
Bldg 12 / Unit 95-102 - Non-structural change out of (24) windows and (8) sliding doors in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 8 / Unit 87-94)
Bldg 8 / Unit 87-94 - Non-structural change out of (30) windows in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 10 / Unit 79-86)
Bldg 10 / Unit 79-86 - Non-structural change out of (30) windows in same sizes and locations in (8) units, install as retrofit. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 8 / Office)
Bldg 8- Non-structural change out of (8) windows in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 7 / Unit 65-73)
Bldg 7 / Unit 65-73 - Non-structural change out of (23) windows in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 6 / Unit 57-64)
Bldg 6 / Unit 57-64 - Non-structural change out of (30) windows in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 4 / Unit 41-48)
Bldg 4 / Unit 41-48 - Non-structural change out of (40) windows in same sizes and locations. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
Window Change-out (Bldg 5 / Unit 49-56)
Bldg 5 / Unit 49-56 - Non-structural change out of (32) windows in same sizes and locations Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
7236 Greenhaven Bldg 1, Units 1-8 - C/O 32 Alum windows to vinyl
Replacing 32 alum windows to vinyl in 8 units, like for like. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R31.
C/O HVAC Split System (UNIT 1)
Unit 1 - Change-out existing HVAC placed in the same location. The appliance/s shall not exceed the size of the existing units by more than 25%. New or relocated units shall be screened from street views by the building with no portion of the new unit being visible from any street views. HERS Report required at final inspection. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
C/O HVAC Split system - UNIT 147
UNIT 147 - C/O existing HVAC split system - no ductwork. HERS report required at final inspection. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
HVAC C/O
HVAC split system change out like for like The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Unit #21- Remove and Replace HVAC
HCAC SPLIT SYSTEM CHANGE OUT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
7236 Greenhaven Dr #190 - HVAC Change Out Like for Like
Change Out Split System Like for Like
HVAC C/O
HVAC split system change out like for like.
HVAC C/O
HVAC split system change out like for like. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R31. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).
HVAC - C/O - UNIT #173
# 173 - HVAC SPLIT SYSTEM CHANGE OUT LIKE FOR LIKE. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
HVAC C/O unit 184
HVAC split system change out like for like Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R31. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).
Unit #54- Replace HVAC
HVAC Split System Change Out. Like for Like.The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
HVAC C/O
HVAC split system change out like for like Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R31. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).
C/O HVAC Unit # 149
Unit #149- HVAC split system change-out like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
C/O HVAC Split System Unit #149
Unit #149- HVAC split system change-out like for like
C/O HVAC Split system (UNIT 38)
Unit #38 - Change-out existing HVAC placed in the same location. The appliance/s shall not exceed the size of the existing units by more than 25%. New or relocated units shall be screened from street views by the building with no portion of the new unit being visible from any street views. HERS Report required at final inspection. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
C/O HVAC Split system (UNIT 16)
Change-out existing HVAC placed in the same location. The appliance/s shall not exceed the size of the existing units by more than 25%. New or relocated units shall be screened from street views by the building with no portion of the new unit being visible from any street views. HERS Report required at final inspection. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
HVAC - C/O - UNIT #174
# 174 - HVAC SPLIT SYSTEM CHANGE OUT LIKE FOR LIKE 24K BTU SEER 14.
C/O HVAC Split system (UNIT 180)
Change-out existing split system, no ductwork. HERS report required at final inspection. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
HVAC - C/O - UNIT #74
# 74 - HVAC SPLIT SYSTEM CHANGE OUT LIKE FOR LIKE 24K BTU SEER 14.
C/O HVAC Split system - Unit 154
Change-out existing HVAC split system - No ductwork Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection.
C/O HVAC Split System - UNIT 102
Change out existing split system - no ductwork Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection. HERS Report required at final inspection.
C/O HVAC Split System - UNIT 101
Change out existing split system - no ductwork Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Access to perform inspection/s must be provided by the Party requesting the inspection. HERS Report required at final inspection.
7236 Green Haven DrUnit #75 HVAC Split System c/o Like-4-Like
Unit #100 HVAC Split System c/o like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
HVAC Split System c/o - APT # 41
APT #41 - HVAC split system change-out like for like. No duct work.
Unit #166 HVAC Split System c/o
Unit #166 - HVAC Split System c/o like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Unit #100 HVAC Split System c/o
Unit #100 HVAC Split System c/o like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Unit 45 C/O HVAC
Unit 188 C/O HVAC Split System
C/O HVAC Split System
7236 Greenhaven #63 & 64 - HVAC Change Out
Unit 63 & 64 HVAC Change Out. Like for like location and size.
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.
C/O HVAC Split system
Change-out existing HVAC placed in the same location. The appliance/s shall not exceed the size of the existing units by more than 25%. New or relocated units shall be screened from street views by the building with no portion of the new unit being visible from any street views. HERS Report required at final inspection. Smoke & Carbon Monoxide Alarms required per CRC sections R314 & R315. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Residences built after January 1, 1994 are exempt). Changes in this scope require PRE-approval from Building Department. ALL work subject to field inspection, unless exempted by Code. Access to perform inspection/s must be provided by the Party requesting the inspection.
HVAC-Split system
HVAC split system change out like for like.
C/O Split HVAC system
C/O HVAC like-for-like
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314
C/O HVAC like-for-like
No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314
UNIT 4 REPLACE SPLIT SYSTEM HVAC UNIT - SAME LOCATION (FURNACE IN CLOSET)
REPLACE SPLIT SYSTEM HVAC UNIT - SAME LOCATION (FURNACE IN CLOSET) - HSPF 8 SEER 14
UNIT 18 REPLACE SPLIT SYSTEM HVAC UNIT - SAME LOCATION (FURNACE IN CLOSET)
REPLACE SPLIT SYSTEM HVAC UNIT - SAME LOCATION (FURNACE IN CLOSET) - HSPF 8 SEER 14
HVAC C/O
HVAC C/O split system like for like Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314
HVAC CHANGEOUT IN OFFICE
OFFICE, HVAC CHANGEOUT, SPLIT SYSTEM.
HSG Case 18-000345: Bldg 11 Unit 91 Plumbing / Dry Rot Repairs
HSG Case 18-000345: Bldg 11 Unit 91 Emergency Plumbing Repair w/ some minor exterior Dry Rot Repairs. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314
Greenhaven Oaks apt. 121
HVAC Change out split system like for like.
Greenhaven Oaks apt. 43
HVAC Change out split system like for like
Greenhaven Oaks Apt #137
Apt #137-HVAC split system change out like for like.The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
HVAC
HVAC SPLIT SYSTEM change out. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
HVAC CHANGE OUT
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.
Greenhaven HVAC change out
HVAC change out split system like for likie, same location 1 1/2 ton HP system ground and upflow bathroom closet,
UNIT 84-HVAC CHANGEOUT
UNIT 84-Change out split system to split system like for like in same location. 2ton heat pump condensing on ground outside and air handler w/ 5kw heat strips. Bathroom closet 950 sq. ft.
hvac c/o
HVAC change out of existing split system like for like. . The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
hvac c/o
HVAC change out of existing split system like for like . The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.
Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.
Change-out Furnace Only (Split System) to Furnace Only (Split System). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.