Sacramento 95834 · APN 225-2980-001-0000 · City of Sacramento
Zoned HC-PUD in City of Sacramento and mapped FEMA A99 flood due diligence; benchmark value $759,000 ($645,000–$873,000).
Public building records show issued construction/renovation work on this parcel (7 total permits, latest Mar 20, 2024).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
Zone A99: 1% annual chance flood (Special Flood Hazard Area) overlaps this parcel. Expect mandatory flood insurance for federally backed loans and floodplain elevation/mitigation rules for new units or SB 9 applications.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Addition (adds square footage) (COM-2322750): Issued after 5 mo (3.5× the 42d median) — above the 75th percentile for addition (adds square footage) permits in City of Sacramento (median 42d, 75th pct 83d, n=1,948).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$759,000
Benchmark range: $645,000 – $873,000
Closest lead: Holiday Inn (0.31 mi E, in review). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$759/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 48 homes completed, 42 permitted, 378 proposed or in review; 2 commercial or mixed-use projects.
4 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
243 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of HC as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 4.6 yr (since Apr 14, 2022), with no new permit record in 4.5 yr. · 384 units · $91,000,000 declared valuation
In "Entitled" for 3.9 yr (since Dec 5, 2022), with no new permit record in 3.9 yr. · 2 units
In "In review" for 22 mo (since Jan 22, 2025), with no new permit record in 22 mo. · $12,000,000 declared valuation
In "Entitled" for 15 mo (since Aug 26, 2025), with no new permit record in 15 mo. · 378 units
Permit issued and active for 2.8 yr (first record Jan 25, 2024), with no completion or new permit record in 7 mo. · 42 units · $6,512,355 declared valuation
Nearby permit (a777b00b6341da522c666b705b065d7d80503c61): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (40 Sunstone Cir): First appeared in published agency feed
Record RES-2623641 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (3580 N Freeway Blvd): Status changed from Plan Check Target to Issued
Record SIG-2620209 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (3580 N Freeway Blvd): Issued date changed from (blank) to 2026-10-08
Record SIG-2620209 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (3600 N Freeway Blvd): Status changed from Issued to Finaled
Record COM-2616418 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (4101 Gateway Park Blvd): Status changed from Plan Check Wait to Plan Check Target
Record COM-2615101 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Record COM-2501498 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Record COM-2608822 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (5 Copper Crest Ct): First appeared in published agency feed
Record RES-2623521 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby fire alarm / sprinkler (3678 N Freeway Blvd): Status changed from Issued to Finaled
Record COM-2620331 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (3550 N Freeway Blvd): First appeared in published agency feed
Record COM-2623674 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby windows / doors / siding (4000 Innovator Dr 36103): First appeared in published agency feed
Record COM-2623854 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (2121 Natomas Crossing Dr 800): Status changed from Verify to Issued
Record SIG-2619620 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (2121 Natomas Crossing Dr 800): Issued date changed from (blank) to 2026-10-06
Record SIG-2619620 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (2121 Natomas Crossing Dr 800): Project name changed from SIGN to SIGN - Qisa Coffee
Record SIG-2619620 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "In review" for 22 mo (since Jan 22, 2025), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($12,000,000 declared valuation across 1 permit). current_status changed to "Plan Check Wait" in snapshot Nov 1, 2026.
Active in "Issued" for 2.8 yr (first record Jan 25, 2024) with no new permit activity recorded in 7 mo. High-impact scale (42 housing units, $6,512,355 declared valuation across 43 permits). current_status changed to "Plan Check Target" in snapshot Nov 1, 2026.
In "Fee estimate" for 4.6 yr (since Apr 14, 2022), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (384 housing units, $91,000,000 declared valuation across 2 permits).
In "Entitled" for 15 mo (since Aug 26, 2025), exceeding the 210d median and 365d 75th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (378 housing units across 0 permits).
Issued after 5 mo (3.5× the 42d median) — above the 75th percentile for addition (adds square footage) permits in City of Sacramento (median 42d, 75th pct 83d, n=1,948).
Issued after 2 mo (3.3× the 19d median) — above the 75th percentile for sign permits in City of Sacramento (median 19d, 75th pct 42d, n=1,075).
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Americo Builders | Addition (adds square footage) | 2 on parcel2 in ½ mi | $867,819 | 3 vs 3 prior |
| Alpha Architectural Signs And Lighting | Sign | 1 on parcel1 in ½ mi | $31,300 | 0 vs 0 prior |
| Gs Construction California Recent nearby: 3510 N Freeway Blvd (Apr 23, 2026) | New multifamily / condos / mixed-use | 16 in ½ mi |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| New garage / accessory structure |
HUD Small Area Fair Market Rent · ZIP 95834
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($7,600/yr) + local voter-approved bond debt ($1,064/yr) + fixed direct levies/Mello-Roos ($450/yr).
Mapped hazard zone insurance context on this parcel:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$37,167/yr
Cash needed: $167,200
NOI: $8,948/yr
P&I: $3,843/mo
For $0/mo net cash flow
At $2,300/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $2,116/mo | −$3,362/mo | -24.1% | $6,808/mo | −$3,357/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,300/mo | −$3,097/mo | -22.2% | $6,302/mo | −$2,962/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,438/mo | −$2,946/mo | -21.1% | $6,155/mo | −$2,662/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
STARBUCKS TI/ADDITION
EPC - EXPEDITED - First time tenant improvement within existing 2329SF shell space (permit under COM-2305971) including, new non-structural partition walls, equipment, lighting fixtures, finishes, interior furniture, new restroom, and 482SF outdoor patio seating area. - PLNG-INSP
3570 GATEWAY PARK BLVD
install three (3) illuminated wall signs, install one (1) illuminated hanging interior sign, install one (1) pre-menu board sign, install. one (1) menu board sign, install one (1) order canopy sign, install two (2) illuminated directional signs, install one (1). non-illuminated clearance bar sign
Deferred Trusses From COM-2305971
EPC - TRUSS CALCULATIONS Deferred from COM-2305971.
REVISION TO COM-2305971
EPC - REVISION TO COM-2305971: 1. wire tap the buss and a 200 amp meter can on the wall adjacent to MSB so that the EV charger has it’s own meter. Upgraded main breaker on MSB for panels “A” from 400 Amps to 600 Amps. Complete service load have been shown. Loads in TI set have been revised with real load. 2. Sheet A1.1 Site Plan changes. Correction of note SP34 – Existing SMUD cubicle to remain. 3.HVAC unit substitution
New nonstructural partition walls, equipment, lighting fixtures, patio/interior furniture and new restroom.
NEW SHELL BUILDING
EPC - NEW 2,405 SQUARE FOOT SHELL BUILDING (RESTAURANT PER DR19-194), NEW TRASH ENCLOSURE, NEW EV CHARGING, SITE WORK AREA: 6,517 SF EQUIPMENT AND NEW TIE-INS TO EXISTING INFRASTRUCTURE. MINOR DEMOLITION WORK TO INCLUDE REMOVAL OF SOME EXISTING CONCRETE, SOME CONCRETE CURBS AND A SMALL AREA OF LANDSCAPING. TENANT IMPROVEMENTS BY OTHERS UNDER SEPARATE PERMIT. DEFERED ITEMS MANUFACTURED ROOF TRUSS DESIGN AND CALCULATIONS - PLNG-INSP SEE REVISION COM-2324361: 1. wire tap the buss and a 200 amp meter can on the wall adjacent to MSB so that the EV charging has it’s own meter. Upgraded main breaker on MSB for panels “A” from 400 Amps to 600 Amps. Complete service load has been shown. Loads in TI set has been revised with real load. 2. Sheet A1.1 Site Plan changes. Correction of note SP34 – Existing SMUD cubicle to remain. 3.HVAC unit substitution Deferred Trusses see COM-2324989
Fee Estimate - 3570 Gateway Park Blvd
Fee Estimate - Coffee Shop: Fee estimate for a proposed new 2,300sqft coffee shop, A2 occupancy, VB construction with a 20'x50' outside dining area patio and a standard 10'x12' trash enclosure.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
0.90 acres
Assessor's classification for assessment purposes. This is not zoning.
3570 GATEWAY PARK BLVD
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 225-2980-001-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| $70,441,213 |
| 19 vs 0 prior |
| Colorado Structures Recent nearby: 3421 N Freeway Blvd (Nov 13, 2024) | New multifamily / condos / mixed-use | 10 in ½ mi | $51,769,550 | 1 vs 13 prior−92% |
| Phase 3 Construction Merged: PHASE 3 CONSTRUCTION · PHASE 3 CONSTRUCTION INC Recent nearby: 3642 N Freeway Blvd 210 (Aug 18, 2026) | Commercial tenant improvement | 10 in ½ mi | $6,134,000 | 3 vs 6 prior |
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS LLC Recent nearby: 160 Promenade Cir 115 (Apr 24, 2026) | Commercial tenant improvement | 7 in ½ mi | $803,841 | 39 vs 62 prior−37% |
| Tilton Pacific Construction Recent nearby: 3631 N Freeway Blvd (Aug 7, 2018) | Commercial tenant improvement | 6 in ½ mi | $1,663,000 | 2 vs 3 prior |
| Quality Development And Construction Recent nearby: 140 Promenade Cir (Jun 6, 2023) | Commercial tenant improvement | 5 in ½ mi | $4,606,400 | 0 vs 4 prior |
| Mjt Construction Recent nearby: 3581 Truxel Rd (Jul 11, 2024) | Addition (adds square footage) | 5 in ½ mi | $1,723,000 | 0 vs 1 prior |
| Foresite Construction Recent nearby: 3510 Truxel Rd (Dec 2, 2024) | Commercial tenant improvement | 5 in ½ mi | $965,814 | 5 vs 4 prior |
| 231 |
| 35d |
| 69d |
| 132d |
| 261d |
| 50d(vs 84d prior) |
| Accessory dwelling unit (new or conversion) | 1,693 | 57d | 97d | 172d | 284d | 97d(vs 103d prior) |
| Addition (adds square footage)On this parcel | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvement | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.